THE MINISTRY OF
INDUSTRY AND TRADE
-------
|
SOCIALIST
REPUBLIC OF VIETNAM
Independence - Freedom - Happiness
---------------
|
No. 1755/QD-BCT
|
Hanoi, February
26, 2015
|
DECISION
ON
APPROVAL FOR “MASTER PLAN FOR DEVELOPMENT OF SYSTEM OF VIETNAM OIL PIPELINES BY
2020, ORIENTED TO 2030”
THE MINISTER OF INDUSTRY AND TRADE
Pursuant to the Decree No. 95/2012/ND-CP dated
November 12, 2012 of the Government defining the functions, tasks, entitlements
and organizational structure of the Ministry of Industry and Trade;
Pursuant to the Decree No. 92/2006/ND-CP dated
September 7, 2006 of the Government and the Decree No. 04/2008/ND-CP dated
January 11, 2008 of the Government on amendments to on the Decree No. 92/2006/ND-CP
on formulation, approval and management of master plans for socio-economic
development;
At the request of Director of Planning
Department,
DECIDES:
Article 1. Approval for “Master plan for development of system of
Vietnam oil pipelines by 2020, oriented to 2030” with the following contents:
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
a) Develop system of oil pipelines in combination
with socio-economic development strategy of Vietnam, combine the system of oil
production with the system of oil pipeline distribution in order to meet the
domestic demands, national reverses and ensure the energy security and
facilitate the export.
b) Take full advantage of current facilities;
improve the strength of the economic sectors and international cooperation
during the development of system of oil pipelines.
c) Ensure the consistency and consolidation of
economic development and economical use of land resources and environmental
protection, remain politics stable and ensure national defense and security.
2. Development objectives
a) Meeting demands for the transport of oil
pipeline from suppliers (oil refineries and central oil depot) to the
consumption centers in large quantities and ensuring the safety and efficiency.
b) Streamline the
transport of oil pipeline from suppliers to consumption centers in order to
reduce transport costs then reduce selling prices and minimize risks to the
environment.
c) Take full advantage of technical facilities of
the current system of oil pipelines. Combine with ship transport and road
transport to organize the distribution among suppliers in order to avoid the
disruption of oil pipeline supply between regions and upstream areas.
3. Development orientation
a) The North and the North Central Coast: Central
general oil depot and General oil depot of Nghi Son Refinery and Petrochemical
complex of Nghi Son Economic Zone in Tinh Gia district of Thanh Hoa province
shall be the distribution center in order to construct and develop the system
of oil pipelines providing for vicinity regions.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
c) The South: General oil depot of Long Son
refinery in Long Son Island, Vung Tau city of Ba Ria - Vung Tau province shall
be the distribution center in order to construct and develop the system of oil
pipelines providing for vicinity regions.
4. Development planning
a) By 2020
- The North: Construct, renovate and upgrade oil
pipelines with total length of 241 km, in which:
+ Construct about 161 km of new oil pipelines from
the oil depot of Nghi Son Refinery and Petrochemical complex in Nghi Son
commune, Tinh Gia district of Thanh Hoa province to Ha Nam oil depot in Kim Son
commune, Kim Bang district of Ha Nam province;
+ Upgrade about 33 km of oil pipelines (diameter:
150-300 mm) from Ha Nam oil depot in Kim Son commune, Kim Bang district of Ha Nam
province to Nam Hanoi oil depot in Nam Phong commune, Phu Xuyen district of
Hanoi city, in order to meet the demand for pumping oil to Nam Hanoi oil depot;
+ Construct about 47 km of oil pipelines from Nam
Hanoi oil depot in Nam Phong commune, Phu Xuyen district of Hanoi city to
transit oil depot (prospective new oil depot in Luong Son district of Hoa Binh
province);
+ Continue to renovate and upgrade synchronously
the B12 primary oil pipeline.
- The Central Coast: Construct 172 km of new oil
pipelines from the oil depots of North Central Coast to Laos, whereby:
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
+ Construct 112 km of new oil pipelines (diameter
200-250 mm) from Vung Ang oil depot in Vung Ang economic zone, Ky Anh district
of Ha Tinh province to the oil depot (new depot) in Cha Lo checkpoint economic
zone, Minh Hoa district of Quang Binh province;
- The Central Coast and the Central Highlands:
Construct 115 km of new oil pipelines from Phu Hoa oil depot in Quang Trung
ward, Quy Nhon city of Binh Dinh province to Bac Tay Nguyen oil depot in La
Tiem commune, Chu Se district of Gia Lai province and transit oil depot (new
depot) in Phu Phong town, Son Tay district of Binh Dinh province.
(Refer to Appendix No.1)
- Research on capacity of connection of oil
pipeline pipelines from Hon La Harbor in Hon La economic zone, Quang Trach
district of Quang Binh province to Cha Lo Checkpoint economic zone in Ninh Hoa
district of Quang Binh province.
b) Oriented to 2030
- Construct 52 km of new oil pipelines from Long
Son refinery in Long Son commune, Vung Tau city of Ba Ria – Vung Tau province
to Nha Be General oil depot in Nha Be district of Ho Chi Minh city (connection
with oil depot group in Phuoc Khanh commune, Nhon Trach district of Dong Nai
province and head oil depot group in Nha Be district of Ho Chi Minh city).
(Refer to Appendix No.2)
- Research on capacity of connection between
pipelines:
+ From Lach Huyen General oil depot of Hai Phong
city with B12 pipeline in the Yen Cu area (Dai Yen commune, Ha Long city of
Quang Ninh province);
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
+ From the Northern Central Highlands to Southern
Central Highlands (Gia Lai – Kon Tum – Buon Me Thuot – Dak Lak);
+ Ho Chi Minh city rim;
+ From Long Son refinery in Long Son commune, Vung
Tau city of Ba Ria – Vung Tau province to Long Thanh international airport in
Long An commune, Long Thanh district of Dong Nai province.
- Research on capacity of connection of North –
South oil pipeline and capacity of connection with neighbor countries sharing
the same boundary line.
- Research on expansion of B12 system of oil
pipelines along Hanoi city rim to Phu Tho and Tuyen Quang province to supply
oil pipeline to the Northern midlands and mountainous.
5. Solutions
a) Solutions pertaining to management and operation
- Check the staff members in charge of oil pipeline
transport of enterprises, strictly dissolve weak transport enterprises; private
enterprises may only provide road transport services.
- Establish professional pipeline transport corporations
which may be in charge of transport with large quantity, earliest time and cost
reduction.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- Develop industries related to equipment and
specialized supplies; construction equipment for oil pipeline to support and
supply to oil pipeline projects.
b) Solutions pertaining to investment capital
- Encourage enterprises to attract multiple capital
resources to invest in construction of system of oil pipelines as prescribed in
regulations in force such as: bank credit, issuance of shares, corporate bonds
or listed on the stock market or Official Development Assistance (ODA).
- Support investment projects for oil pipelines
having major impact on power security and national defense as prescribed in
regulations in force such as: low-interest loans, deferred payment of value
added tax in the first few years of the project, the capital tax exemption for
research technological innovation.
- Support enterprises investing in oil pipelines in
disadvantaged areas in site clearance or incentives pertaining to land rents.
c) Solutions pertaining to land
Formulate incentive policies on lease and borrowing
of construction land with reasonable rents to attract investors or support in
site clearance and land rent reduction applied to the oil pipelines having
major impact on power national defense and security.
d) Solutions pertaining to environment
- Formulate operating procedures for oil pipelines
as prescribed in regulations on fire and oil transport. Strictly control the pumping of oil in the pipelines, especially control
of pumping discharge pressure.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- Encourage enterprises to invest in study and
application of new solutions to reduce environment pollution.
6. Implementation
a) The Ministry of Industry and Trade must announce
and direct the implementation and inspection of implementation of the Master
plan for development of system of Vietnam oil pipelines by 2020, oriented to
2030.
b) Ministries, agencies, the People’s Committees of
central-affiliated cities and provinces having oil pipelines passing shall
cooperate with the Ministry of Industry and Trade within their functions,
tasks, power in implementation of tasks and objectives of the Master plan,
ensure the uniformity and synchronization with plan for socio-economic
development of agencies, local governments and enterprises; enable investors to
assess and carry out steps of investment and construction of oil pipelines.
c) Petroleum enterprises managed by the State must
cooperate with the Ministry of Industry and Trade within their functions,
tasks, powers in formulation of plans for construction of oil pipelines,
including:
- Facilitate the cooperation between manufacturers
and distributors in agreement on sources of oil transporting by pipelines and
investment capital for construction of oil pipelines.
- Formulate detailed construction planning to
conclude an agreement on location and land with the People’s Committees of
provinces and cities and specialized authorities of Ministries or agencies.
Article 2. This Decision shall take effect from the date on which it is
signed.
Article 3. The Chiefs of the Ministry offices, Directors of
Departments: Planning, Finance, Domestic Market, Director of General Department
of Power, the People’s Committees of provinces having oil pipelines passing and
relevant oil pipeline enterprises shall take responsibility for implementation
of this Decision./.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
PP. MINISTER
DEPUTY MINISTER
Do Thang Hai
APPENDIX 1
LIST OF OIL PIPELINE PROJECTS BY 2020
(Issued together with the Decision No. 1755/QD-BCT dated February 26, 2015
of the Minister of Industry and Trade)
No.
Project
Length, route,
size of pipelines
Pumping station
on route
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Construct oil pipelines from oil depot of Nghi
Son Refinery and Petrochemical complex (Tinh Gia district of Thanh Hoa
province), across Ha Nam oil depot (Kim Bang district of Ha Nam province) to
Nam Hanoi oil depot (Nam Phong commune, Phu Xuyen district of Hanoi city)
Total length of pipelines: about 194 km
(including 2 branches of pipelines for gasoline and diesel, technical
standards: Level 1 mentioned in Vietnam Standards 4090-85: Main pipelines for
transporting oil and oil products - Design standard, in which:
1. Construct 161 km of new oil pipelines
(diameter 250-350 mm) from oil depot of Nghi Son Refinery and Petrochemical
complex to Ha Nam oil depot.
Detail:
Thanh Hoa:
From Nghi Son commune of Tinh Gia district to
Quang Linh commune of Quang Xuong district (Phuong Vi area, Chet T-junction –
intersection between Provincial road 4 and Highway 1): 36 km along Highway 1.
From Quang Linh commune of Quang Xuong district
to Quang Phu commune of Quang Xuong district (Moi T-junction – intersection
between Provincial road 511 and Highway 47): 14 km along Provincial road 4
and Provincial road 511.
From Quang Phu commune of Quang Xuong district to
Nga Thach commune of Nga Son district (intersection with Highway 10): 28 km
along Highway 10 and along the coast.
From Nga Thach commune of Nga Son district to Nga
Dien commune of Nga Son district: 21 km along Highway 10.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
From Nga Dien commune, Nga Son district of Thanh
Hoa province to Ninh Phuc commune, Yen Khanh district of Ninh Binh province:
23 km along Highway 10.
Nam Dinh:
From Ninh Phuc commune, Yen Khanh district of
Ninh Binh province to Yen Thanh commune, Y Yen district of Nam Dinh province:
22 km along Highway 10 across Cao Bo intersection and along Cau Gie - Phap
Van highway.
Ha Nam:
From Yen Thanh commune, Y Yen district of Nam
Dinh province, across Thanh Thuy commune, Thanh Liem district (crossing
Highway 1 and Day river) to Ha Nam oil depot in Kim Bang of Ha Nam province:
17 km along Highway 1.
2. Upgrade 33 km of B12 oil pipelines (diameter:
150-300 mm) from Ha Nam oil depot in Kim Bang district of Ha Nam province to
Nam Hanoi oil depot in Nam Phong commune, Phu Xuyen district of Hanoi city.
Upstream primary pumping stations and booster
pumping stations with a capacity of at least 200- 500 m3/h
according to the needs of every area; Pumping pressure <60 kg / cm2
at the upstream Nghi Son oil depot, Quang Phu oil depot and Ha Nam oil depot.
2.
Construct oil pipelines from Nam Hanoi oil depot
(Nam Phong commune, Phu Xuyen district of Hanoi city) to Luong son oil depot
(Hoa Son commune, Luong Son district of Hoa Binh province)
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Hanoi:
From Nam Hanoi oil depot in Nam Phong, Phu Xuyen
district of Hanoi city to Nam Phuong Tien commune, Chuong My district of Hanoi:
42 km to the west and through Ung Hoa district)
Hoa Binh:
From Nam Phuong Tien commune, Chuong My of Hanoi
city to Luong Son oil depot in Hoa Son commune, Luong Son district of Hoa
Binh province: 5 km along Highway 6.
Notes: If the pipelines through Luong Son turn
at the Ha Nam oil depot, the downstream oil depot in Cao Thang commune, Luong
Son district of Hoa Binh province shall be the provisional plan.
Upstream primary pumping stations with a capacity
of at least 200-250m3/h; pumping pressure <60kg/cm2
at Nam Hanoi oil depot
3
Construct oil pipelines from Ben Thuy oil depot
(Hung Dung ward, Vinh city of Nghe An) to the oil depot at the Thanh Thuy
checkpoint (Thanh Thuy commune, Thanh Chuong district of Nghe An)
Total length of pipeline: about 60 km (including
2 branches of pipelines for gasoline and diesel, technical standards: Level 1
mentioned in Vietnam Standards 4090-85: Main pipelines for transporting oil
and oil products - Design standard, diameter 250-300 mm) along Provincial
road 559 and Highway 46 (across Hung Nguyen and Nam Dan districts of Nghe An
province)
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
4
Construct oil pipelines from Vung Ang oil depot
at the Vung Ang economic zone (Ky Anh district of Ha Tinh province) to Cha Lo
Checkpoint economic zone (Minh Hoa district of Quang Binh province)
Total length of pipeline: about 112 km (including
2 branches of pipelines for gasoline and diesel, technical standards: Level 1
mentioned in Vietnam Standards 4090-85: Main pipelines for transporting oil
and oil products - Design standard, diameter 200-250 mm).
Detail:
Ha Tinh:
From Vung Ang oil depot at the Vung Ang economic
zone in Ky Anh district of Ha Tinh province to Hoa Tien commune, Minh Hoa
district of Quang Binh province: 30 km along Highway 12A
Quang Binh:
From Hoa Tien commune, Minh Hoa district of Quang
Binh province to Cha Lo checkpoint economic zone, Minh Hoa district of Quang
Binh province: 82 km along Highway 12A.
Upstream primary pumping stations and booster
pumping stations with a capacity of at least 150-200 m3/h; pumping
pressure <60 kg/ cm2 at Vung Ang oil depot
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Construct oil pipelines from Phu Hoa oil depot
(Quang Trung ward, Quy Nhon city of Binh Dinh province) to Bac Tay Nguyen oil
depot (La Tiem commune, Chu Se district of Gia Lai province)
Total length of pipeline: about 155 km (including
2 branches of pipelines for gasoline and diesel, technical standards: Level 1
mentioned in Vietnam Standards 4090-85: Main pipelines for transporting oil
and oil products - Design standard, diameter 200-250 mm).
Detail:
Binh Dinh:
From Phu Hoa oil depot in Quang Trung ward and
Nhon Binh ward, Quy Nhon city of Binh Dinh province, across Tuy Phuoc, An
Nhon and Tay Son districts to An Khe mountain pass in Tay Thuan, Tay Son
district of Binh Dinh province: 94.5 km along Highway 19.
Gia Lai:
From An Khe mountain pass in An Khe town of Gia
Lai province, across Mang Yang and Dak Doa districts to Bac Tay Nguyen oil
depot in La Tiem commune, Chu Se district of Gia Lai province: 60.5 km along
Highway 19.
Upstream primary pumping stations and booster
pumping stations with a capacity of at least 150 200m3/h; Pumping
pressure <60 kg / cm2 at the Phu Hoa oil depot, Phu Phong oil
depot and foot of Mang Yang mountain pass of Gia Lai province.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
LIST OF OIL PIPELINE PROJECTS OF 2020 – 2030 PERIOD
(Issued together with the Decision No. 1755/QD-BCT dated February 26, 2015
of the Minister of Industry and Trade)
No.
Project
Length, route,
size of pipelines
Pumping
stations on route
1
Construct oil pipelines from oil depot of Long Son
refinery (Long Son commune, Vung Tau city of Ba Ria – Vung Tau province) to
Nha Be oil depot (Nha Be district of Ho Chi Minh city)
Total length of pipeline: about 52 km (including
2 branches of pipelines for gasoline and diesel, technical standards: Level 1
mentioned in Vietnam Standards 4090-85: Main pipelines for transporting oil
and oil products - Design standard, diameter 300-350 mm).
Detail:
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
From oil depot of Long Son refinery, Long Son
commune of Vung Tau city, across Thi Vai river to the Phu My harbor of Tan
Thanh district: 17 km along Dong Nai river.
Dong Nai:
From Phu My harbor of Tan Thanh district through
Nhon Trach district, across Sai Gon river to Phu Dong commune, Nhon Trach district
of Dong Nai province: 35 km (along the current air pipeline route about 12
km).
Notes: Before crossing Sai Gon river, the
pipelines may be connected with oil depot group in Phuoc Khanh commune, Nhon
Trach district of Dong Nai province
Pumping stations with a capacity of at least
500-600 m3/h; pumping pressure <60 kg/ cm2.