THE PRIME
MINISTER
|
SOCIALIST
REPUBLIC OF VIETNAM
Independence - Freedom - Happiness
---------------
|
No: 1547/QĐ-TTg
|
Hanoi, October
28, 2008
|
DECISION
APPROVING
THE MASTER PLAN FOR FLOOD PREVENTION IN HO CHI MINH CITY
THE PRIME MINISTER
Pursuant to the Law on Government organization
dated December 25, 2001;
Pursuant to the Law on Water Resources dated May
20, 1998;
Pursuant to the Government's Decree No.
01/2008/NĐ-CP on January 03, 2008, defining the functions, tasks, powers and
organizational structure of the Ministry of Agriculture and Rural development;
At the request of the Minister of Agriculture
and Rural development,
HEREBY DECIDES
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
I. STUDY SCOPE
Ho Chi Minh City with the area of 209,500ha; the
vicinity including the lowland of rivers :Dong Nai from Tri An lake to the sea
with the area of 235,000ha, Saigon from Dau Tieng lake to Ho Chi Minh City with
the area of 243,000ha, Vam Co Dong with the area of 281,000ha. The total study
area is 968,500ha.
II. OBJECTIVES
Study and propose solutions for solving the
flooding in Ho Chi Minh City, in particular:
1. Up to 2012: Implement solutions for controlling
tide, proactive lowering the water
level in the canals surrounding the right bank of the Saigon – Nha Be rivers,
promoting water retention capacity of the system of canals , lakes, and
low-lying, sunken areas, increasing capacity to drain of the system of canals,
lakes in the city, ending the flooding due to tide and flood, providing the
basis for the drainage of rainwater from canals, orienting the drainage axes;
associate the operation of water control works with the improvement of the
canal environment for this area.
2. After 2012: Implement solutions for flood
control at Dong Nai– Saigon river junction, including solutions for upstream
flood control, tide control in order to solve the problem of flood in the city
if heavy flooding in upstream location occurs and sea level rises in the
future; associate the operation of water control works with the improvement of
canal environment and acid sulphate soils.
III. PLAN
1. Based on the natural characteristics, topography
conditions, flooding properties, ability to control extraneous water, development planning, basis of
science-technology, economy and environment, the plan of flood prevention
divides Ho Chi Minh City into 3 water control areas, including:
- Region I consists of the entire right bank of
Saigon – Nha Be rivers, including the old inner- city area, where now there are
many urgent matters of urban drainage, environment, the southern area of the
city and a part of Long An province (the left bank of Vam Co river and Vam Co
Dong river) which is mainly farmland and uncultivated land of which alkaline
soils and acid sulphate soils are required for improvement. This is the central
area of the master Plan.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- Region III includes the entire left bank of Nha
Be-Soai Rap rivers which is now a biosphere area. Thus large-scale water
control works can be constructed here n the future, depending on the sea level
rise and the process of urban development in the south of the city.
2. The plan of flood prevention on the right bank
of Saigon - Nha Be rivers (region I):
- A dyke system along the right bank of Saigon
river (from Ben Suc), Soai Rap river and the left bank of Vam Co Dong river to
Provincial Route 824 (Duc Hoa town - Long An province) shall be built. The dyke
route from Ben Suc to Vam Thuat is constructed according to the dyke route of
the irrigation project of the right bank of Saigon river; The remaining section
is constructed according to existing roads along the river.
- The closed system of culverts is located in
estuaries and canals flowing to Saigon, Nha Be, Vam Co, and Vam Co Dong rivers.
The main culverts are: Rach Tra, Vam Thuat, Ben Nghe, Tan Thuan, Phu Xuan,
Muong Chuoi, Kinh river , Kinh Lo, Kinh Hang, Thu Bo, Ben Luc, Xang Lon canal.
These culverts shall control the water level and water environment inside the
dike area, which shall not be higher than the allowed level under the drainage
requirements, shall not cause a major obstacle to inter-regional waterway
traffic, and shall proactively cut the tide crest; the culverts without any
task or with only local traffic task shall be operated with two-way automatic
mode.
- Water drainage main direction in the study area
is North - South, so the main drainage canal system includes canals along this
direction. Rach Tra - Thay Cai - An Ha - Cho Dem canal axis is renovated,
dredged, extended to convey water from low-lying area of the city to the South.
Vam Thuat - Tham Luong - Ben Cat –Rach Nuoc Len canal route that was approved
of investment by the city’s People's Committee shall be improved the water
drainage ability after the completion.
- “Reservoirs" include ponds, lakes, canals
and some low-lying areas which are renovated in order to have sufficient
capacity to reserve rainwater drained from the city center during high tides .
People’s Committee of Ho Chi Minh city is assigned
to guide, study the master plan of reservoir network distributed for each
region, area, and foundation in order to adjust the master plan of land use,
the master plan of transport accordingly and ensure that the land used for the
reservoirs is not smaller than 17% of total area of the region.
3. Plan of flood prevention in Dong Nai – Saigon river junction (region II):
- The ground in urban areas shall be raised about +
2,5m higher than the flood level.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- Rivers and canals must be renovated in Thu Duc,
District 9 in order to improve the drainage.
- Canal axes must be dredged, renovated and the
pressure of Dong Nai River flood on new urban areas along Saigon river must be
reduced in order to improve waterway traffic.
- Water of Dong Nai river is used in soil and
environmental improvement.
4. Plan of flood prevention on the left right of
Nha Be - Soai Rap rivers (region III): This region is determined as a buffer
zone of which drainage shall be solved in the future by constructing big works,
depending on sea level rise and the urban development in the South of the city.
In the immediate future, the small dykes and sea dykes (sea dike shall be
considered in another master plan) must be used to prevent flooding in the
current conditions.
5. Upstream flood control
- Supplement the task for regulating flood and
improving the process of operation of the reservoirs in order to ensure safety
and control flood facilitating the flood prevention in lowland areas.
- Cooperate to operating the flood discharge in
lakes: Dau Tieng, Tri An, Phuoc Hoa and other lakes in upstream areas
considering the tide conditions in the estuary segment.
- Conduct flood diversion from Dong Nai river into
Thi Vai river through Dong Mon river, combined with environmental improvement.
- Conduct flood diversion from Saigon river to Rach
Tra river. Flood diversion is combined with soil and environmental improvement
(region I) in order to reduce flooding pressure in the city center.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
IV. ORDERS
1. Period I: implementation of the projects of the
right bank of Saigon – Nha Be rivers
Stage 1: build 6 large culverts: Phu Xuan, Muong
Chuoi, King river, Kinh Lo, Thu Bo, Hang canal and small culverts in other
canals; construct a dike route connecting such culverts; dredge the drainage
canal in the South of the city center.
b. Stage 2: build 2 large culverts : Rach Tra, Vam
Thuat and other small culverts connecting with the small projects of irrigation
system on the right bank of the Saigon river; dredge the axes : Rach Tra - An
Ha - Nam Saigon and Vam Thuat – Tham Luong - Ben Cat – Nuoc Len canal.
c. Stage 3: Build 4 culverts: Ben Nghe, Tan Thuan,
Ben Luc, Xang Lon canal, open the existing An Ha; complete the dyke route and
small culverts under the dykes.
Estimated total investment in the above works is
10,080 billion VND, of which amount spent on stage I is 5,600 billion VND,
stage II is 2,800 billion VND, and stage III is 1,680 billion VND.
2. Period II: solving the flooding in Dong Nai -
Sai Gon river junction.
3. Based on the ability to balance the annual state
budget, the Ministry of Agriculture and Rural Development, People's Committee
of Ho Chi Minh City, the People's Committees of provinces and cities in the
planned areas, relevant Ministries, departments must arrange the order of priority
in order to ensure synchronous and effective investment.
- Give priority to unfinished construction works
and ensure synchronization in order to complete and put them into use as soon
as possible to promote the effectiveness immediately.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- Improve the dyke system and small culverts under
the dyke.
- Dredge and renovate the canal system in order to
improve drainage and serve waterway traffic.
V. TOTAL INVESTMENT
Estimated total investment in the construction of
anti-flooding works in Ho Chi Minh City is 11, 531 billion VND (eleven
thousand five hundred and thirty-one billion dong). Including:
1. Period I: 10, 080 billion dong
2. Period II: 1, 451 billion dong
Investment capital source is the annual state
budget including central budget, local budget, Government bonds, ODA.
Article 2. Implementation
1. The Steering Committee of project of flood
prevention in Ho Chi Minh City is established of which Chairman is 01 leader
of the Ministry of Agriculture and Rural Development; Steering Committee
members include representatives of Departments in Ministries, sectors and
localities: Planning and Investment, Finance, Construction, Science and
Technology, Natural Resources and Environment , the People's Committee of Ho
Chi Minh City, the People's Committee of Long An province.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
The Minister of Agriculture and Rural development
shall approve the list of the Steering Committee.
2. The Ministry of Agriculture and Rural
development:
a. Direct and cooperate closely with localities to
implement the master Plan; update, handle new matters arising during the
implementation in order to ensure that the projects are implemented with proper
purposes and effectively.
b. Commence the setting-up and approval of
investment of projects of works having large scale and technical complexity,
including Muong Chuoi Culvert, Kinh Lo (Rach Giong) Culvert, Thu Bo Culvert.
Be allowed to appoint consultants to set up
investment projects, create technical design, and make total estimates of 3
above works; be allowed to hire foreign consultants to provide technical
assistance during investment preparation and project implementation
preparation.
c. Direct, guide, inspect, and urge the relevant
localities to commence the investment in construction of works according to the
master Plan in the area. Take charge and cooperate with the localities to
implement the detailed master Plan, approve the adjustments of the detailed
master Plan of each region, area accordingly.
d. Systematically monitor the operation of works,
ensure the effectiveness and sustainability of the master Plan.
dd) Take charge and cooperate with relevant
Ministers, sectors and localities to study, set up processes, and implement the
plans, processes of flood discharge of the reservoirs in upstream area in order
to facilitate the flood prevention in Ho Chi Minh city, set up the process of
operating culvert system to prevent flooding, tide serving flood prevention,
environmental improvement of the canal systems in the city.
3. People’s Committee of Ho Chi Minh city
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
b. Cooperate with the Ministry of Agriculture and
Rural Development and relevant agencies to review the master plan of drainage
inner the city, meeting requirements for drainage and ensuring the economic
effectiveness of the project;
c. Direct the setting-up, assess, and approve the
projects after obtaining the agreement on the technique of the Ministry of
Agriculture Technical and Rural Development; be allowed to appoint consultants
to set up investment projects, technical designs - total estimates and hire
foreign consultants to provide technical assistance during investment
preparation and project implementation in accordance with the regulations;
d. Balance the budget and other sources of
investment capital to implement synchronously the system of anti-flooding works
as prescribed for works of which investor is the People’s Committee of Ho Chi
Minh city.
4. People’s Committee of Long An province shall be
responsible for implementing works in the master Plan in the area (listed in
Annex I) and directing the setting-up, assessment, and approval of projects
after obtaining the agreement on technique of the Ministry of Agriculture
Technical and Rural Development.
5. the Ministry of Planning and Investment shall
take charge and cooperate with the Ministry of Finance, the Ministry of
Agriculture and Rural development, the Ministry of Construction, People’s
Committee of Ho Chi Minh city, People’s Committee of Long An province allocates
the investment capital in constructing works determined in the master Plan and
the drainage system inner Ho Chi Minh city.
6. the Ministry of Science and Technology
implements the research project of setting-up the process of operating flood
discharge in lakes in Dong Nai – Saigon river basin in order to prevent
flooding; setting-up the process of operating culvert system in order to
prevent floods, tide to serve flooding prevention and environment improvement
of canals in Ho Chi Minh City.
7. Ministries, departments according to their
assigned functions and tasks shall cooperate with the Ministry of Agriculture
and Rural Development, the People's Committees of provinces and cities under
the scope of the master Plan to implement effectively the master Plan of flood
prevention in Ho Chi Minh city, and consider adjusting the master Plan of
departments, localities in consistence with the contents of this master Plan.
Article 3. This Decision
takes effect after its signing.
Article 4. The Ministers
of Agriculture and Rural Development, Planning and Investment, Finance,
Construction, Transport, Science and Technology, Natural Resources and
Environment, the President of the People’s Committee of Ho Chi Minh city, the
President of the People’s Committee of Long An province shall be responsible
for the implementation of this Decision.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
THE PRIME
MINISTER
Nguyen Tan Dung
APPENDIX I
LIST OF PROJECTS PLANNED FOR CONSTRUCTION IN PERIOD I
(Enclosed herewith the Prime Minister’s Decision No. 1547/QĐ-TTg dated
October 28, 2008)
Table 1. Large
culverts under dyke routes
No.
Project
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Operation mode
Expected investor
Breadth (m)
Bottom level (m)
1
Rach Tra culvert (lock)
60
-4.0
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Ho Chi Minh city
2
Vam Thuan Culvert
40
-4.0
Manual
Ho Chi Minh city
3
Ben Nghe Culvert
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
-4.0
Manual
Ho Chi Minh city
4
Tan Thuan Culvert (Lock)
60
-4.0
Manual
Ho Chi Minh city
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Phu Xuan Culvert
60
-4.0
Manual
Ho Chi Minh city
6
Muong Chuoi Culvert (Lock)
60
-6.0
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
The Ministry of
Agriculture and Rural development
120
-10.0
Manual
7
Song Kinh Culvert
60
-4.0
Manual
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
8
Kinh Lo (Giong canal) Culvert
60
-6.0
Manual
The Ministry of
Agriculture and Rural development
9
Kenh Hang Culvert
120
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Manual
Long An province
10
Thu Bo Culvert (Lock)
80
-4.0
Automatic
The Ministry of
Agriculture and Rural development
120
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Manual
11
Ben Luc Culvert (Lock)
60
-4,0
Manual
Long An province
12
Xang Lon canal Culvert
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
-4.0
Manual
Long An province
Table 2. Main
dyke routes
No.
Route
Length (km)
Crest level
Breadth of dike
surface
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Expected investor
1
Ben Suc-Rach Son
19,735
+3,0m
7,5m
Dike along Saigon river
Ho Chi Minh city
2
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
16,855
+2,8m
7,5m
Dike along Saigon river
Ho Chi Minh city
3
Provincial Route 8-Vam Thuan
23,552
+2,5m
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Dike along Saigon river
Ho Chi Minh city
4
Vam Thuan-Kinh Lo
30,42
+3,0m
According to the scale of roads
Ho Chi Minh city
5
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
13,40
+3,0m
According to the scale of roads
Long An province
6
Thu Bo-Provincial 824
68,29
+2,0m
According to the scale of roads
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Total
172,252
Table 3. Main
drainage axis requiring renovation
No.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Length (km)
Note
I
Drainage axis in inner Ho Chi Minh city
28,1
1
Thu Dao canal
4,434
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Bottom level = -4,0m
2
Ba Lon canal
7,55
Bottom breadth B=40m,
Bottom level = -4,0m
3
Lung Man canal
2,554
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Bottom level = -4,0m
4
Xom Cui canal
7,638
Bottom breadth B=40m,
Bottom level = -4,0m
5
Ong Be canal
3,324
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Bottom level = -4,0m
6
Thay Tieu canal
2,600
Bottom breadth B=40m,
Bottom level = -4,0m
II
North-south drainage axis
80,518
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
1
Can Giuoc river
11,75
Bottom breadth B=100m,
Bottom level = -6,0m
2
Vam Thuan-Tham Luong-Ben Cat- Nuoc Len canal (*)
30,378
Bottom breadth B=40m,
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
3
Rach Tra-Kenh Xang-An Ha- Xang Lon canal
38,39
Bottom breadth B=60m,
Bottom level = -4,0m
Total
108,618
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
APPENDIX II
LIST OF PROJECTS PLANNED FOR CONSTRUCTION IN PERIOD II
(enclosed herewith the Prime Minister’s Decision No. 1547/QĐ-TTg dated
October 28, 2008)
1. Dyke:
- Dyke along Saigon river (from the left bank of
Ong Dau canal to Vinh Binh cannal- also used for traffic purpose):
Total length: 6.000 m;
Crest level: 2.5m;
Breadth: 12m.
- Dyke along Dong Nai river, also used for traffic
purpose from Long Phuoc, Long Truong, Truong Thanh to Phu Huu:
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Crest level: 3.0 – 3.2m;
Breadth: 12m
2. Traffic Bridge: Major traffic bridges on the
left bank of Saigon river are in the following table:
No.
Work
Size
Unit
Note
I
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
1
Ky Ha Bridge
90
m
Breadth of bridge
deck: 12m
2
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
135
m
Breadth of bridge
deck: 12m
3
Rach chiec bridge
135
m
Breadth of bridge
deck: 12m
4
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
135
m
Breadth of bridge
deck: 12m
5
Ong Dau bridge
45
m
Breadth of bridge
deck: 12m
6
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
45
m
Breadth of bridge
deck: 12m
7
Rach Ba Cua bridge
135
m
Breadth of bridge
deck: 12m
8
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
180
m
Breadth of bridge
deck: 12m
II
Embankment
13.5
km
3. Renovation of canals: dredging waterways used
for drainage and serving traffic: total length: 83.200m; Average breadth: 6 -
15m; Average depth: -2.0 ÷ -4.0m.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
No.
River/Canal
Length (m)
cross section of
the design
Technical Level
Note
B(m)
Ñd (m)
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Ong Nhieu canal
7.500
60
-4
4
Local
2
Ba Cua canal
7.000
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
-4
4
Local
3
Giong Ong To canal
7.000
50
-3
4
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
4
Chiec-Trau Trau canal
11.500
50
-3
4
Local
5
Go Cong canal
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
40
6
Local
6
Cay Cam canal
3.500
20
-3
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Long Truong ward
7
Thau canal
2.500
20
-2
Long Truong ward
8
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
2.500
20
-2
Long Truong ward
9
Mot Tan canal
4.000
20
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Phu Huu ward
10
Dat Set-Ba Lang canal
3.000
20
-2
Phu Huu ward
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Ruot Ngua canal
2.000
20
-2
Phu Huu ward
12
Ba Hien canal
2.000
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
-2
Phu Huu ward
13
Go Lon canal
1.500
15
-2
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
14
Ngon Ngang canal
2,500
15
-2
Phu Huu ward
15
Ngon Giua canal
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
15
-2
Phu Huu ward
16
Ngon Tiem canal
3.000
15
-2
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Phu Huu ward
17
Rach Bang
2.500
20
-2
Phu Huu ward
18
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
4.000
20
-2
Phu Huu ward
19
Cau Ong Lap canal
2.000
10
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Phu Huu ward
20
Rach Muong
2.500
20
-2
Phu Huu ward
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Ky Ha-Ong Keo canals
4.500
30
-2
Phu Huu ward
Total
83.200
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66