Article 1.- To
ratify the planning on the development of Vietnam’s industrial explosive
materials branch with the following principal contents:
1. Orientation for development
of industrial explosive materials branch till 2010:
Industrial explosive materials
are special commodity products and constitute a conditional production and
business line uniformly managed by the State.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2. Basic objectives of the
planning on the development of industrial explosive material branch till 2010:
- To invest in the production of
Nitratammonium (NH4NO3), one of the base raw materials for producing
explosives, with a porosity and a purity of over 99.5%, for timely and adequate
supply thereof to the explosive production establishments, and at the same time
to invest in the research into other raw materials in service of the
manufacture of explosion support devices.
- To improve and modernize the
existing emulsion explosive production line, and gradually eliminate the
traditional explosives, including those recycled from waste defense explosives
(containing TNT), with a view to reducing the use rate thereof by 2005 and
afterward to under 5-10% and only in places where conditions permit.
- To study the investment in
production of water-proof safe emulsion explosives with high blasting power,
for use in mine pits where methane gas and explosion dust accumulate; to
develop and improve methods of producing loose, high-power emulsion explosives
on special-use vehicles at explosion sites.
- To study the investment in
production of a number of categories of explosives and explosion support
devices in service of the petroleum industry.
- To synchronize and modernize
the chain for production of explosion support devices: high-power detonating
fuses, detonators and non-electrical wires to substitute imports.
- To improve the work of
organizing the production of industrial explosive materials, a network of
provision of highly specialized explosion services, in order to ensure the
social order and safety; and maintain only two designated State enterprises for
the production and supply of industrial explosive materials as at present.
- To attach importance to the
development of package explosion services, first of all in industrial zones
with great demands; step up the work of training human resources and improve
State management mechanisms and policies applicable to the industrial explosive
materials branch.
3. The production output of
industrial explosive materials:
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
- By 2005: Around 30,240 tons of
explosives.
- In the 2006-2010 period:
Around 35,910 tons of explosives.
4. Development plans:
- For the 2002-2005 (Appendix
2): It is necessary to work out as soon as possible pre-feasibility study and
feasibility study reports of projects on production of nitratammonium, emulsion
explosives for pit safety, loose high-power emulsion explosives and explosive
materials for the petroleum industry, and better the existing explosives and
explosion support devices.
- For the 2006-2010 (Appendix
3): The development scale and progress depending on the practical situation of
the 2002-2005 period shall be appropriately readjusted.
5. Investment capital demand:
a/ The total development
investment capital for the industrial explosive materials branch for 10 years
is estimated at around VND 355 billion, in which:
- For the 2002-2005: Around VND
212 billion.
- For the 2006-2010: Around VND
143 billion.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
- Loan capital and capital
mobilized from other sources for investment according to the list of approved
projects.
- Capital supports from the
State budget for such activities as scientific and technological research
(covering research for application, experimental manufacture) as well as
national reserve and preservation of industrial explosive materials.
Article 2.-
Organization of implementation
1. The Ministry of Industry,
with its function of State management over industrial explosive materials,
shall have to direct, monitor and urge the materialization of objectives and
performance of tasks of the industrial explosive materials branch in service of
the national economy, organize the periodical appraisal of the planning
implementation and propose adjustments to the planning to make it suitable to
the practical situation; coordinate with the concerned ministries and branches
in further studying and improving legal documents as well as mechanisms and
policies for the development of the industrial explosive materials branch under
the approved planning.
2. The Ministry of Investment
and Planning shall coordinate with the concerned ministries and branches in
studying policies on assistance, provision and disposition of capital sources
for the scientific research and application of the industrial explosive materials
branch and the national reserve of industrial explosive materials.
3. The Ministry of Science,
Technology and Environment shall coordinate with the Ministry of Industry and
the Ministry of Defense in promoting scientific and technological research activities
in the field of industrial explosive materials, with a view to absorbing and
organizing the application of advanced scientific achievements and technologies
of the region and the world; promulgating regulations on technology, technical
and environmental standards related to the management and development of the
industrial explosive materials branch.
4. The Ministry of Defense and
Vietnam Coal Corporation shall direct their attached units in producing
explosives and explosion support devices of all kinds fully meeting demands of
the national economic branches; researching and absorbing technologies for
producing explosives and explosion support devices in service of the petroleum
industry in substitution for currently imported explosives and support devices,
and aiming to export them.
5. Vietnam Oil and Gas
Corporation shall create conditions for units producing industrial explosive
materials at home to research into and experimentally produce industrial
explosive materials up to the standards for petroleum exploration and
exploitation in substitution for imports.
6. The Ministry of Public
Security shall coordinate with the concerned ministries and branches in
finalizing regulations on management of industrial explosive materials,
including export and import thereof and fight against illegal trading in
industrial explosive materials.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Article 3.-
The ministries, branches and People’s Committees of the provinces or
centrally-run cities shall base themselves on their respective functions and
tasks to direct the strict management of production, reservation, transportation
and use of industrial explosive materials according to the current regulations.
Article 4.-
This Decision takes effect 15 days after its signing.
Article 5.-
The ministers, the heads of the ministerial-level agencies, the heads of the
agencies attached to the Government, presidents of the People’s Committees of
the provinces or centrally-run cities, the managing board chairman and the
general director of Vietnam Coal Corporation, the managing board chairman and
the general director of Vietnam Oil and Gas Corporation and the heads of the
concerned agencies shall have to implement this Decision.
FOR THE PRIME MINISTER
DEPUTY PRIME MINISTER
Nguyen Tan Dung
APPENDIX 1
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
1. Consumption demand by
quantity
Year
Total
demand
Cartridge
* (bullet)
Explosive
(ton)
Detonator**
(1,000 units)
Wire
of all kinds (1,000 m)
Detonating
charge (1,000 units)
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
68,854
23,070
26,354
19,649
223
2005
90,254
30,240
36,493
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
312
2010
126,585
35,915
44,633
31,589
367
Notes: * Exclusively for the
petroleum industry
** Including those for the
petroleum industry
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Ordinal
number
Categories
Unit
Demand
2002
2005
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
1
Total demand for explosives
Ton
23,070
30,240
35,915
- Zecno
Ton
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
0
0
- ANFO
Ton
4,674
9,030
10,524
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Ton
3,487
5,175
0
- Loose emulsion
Ton
0
0
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
- Molded emulsion
Ton
6,054
10,815
14,587
- Traditional explosives
Ton
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2,944
1,800
- Pit safety explosive AH1
Ton
1,380
0
0
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Ton
0
2,276
2,952
2
Total demand for cartridge
(for the petroleum industry)
Bullet
68,854
90,254
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
- Bed-testing cartridge TCP-89
Bullet
36,380
47,687
66,883
- Bed-testing cartridge
Baracuda-89
Bullet
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
21,038
29,507
- Bed-testing cartridge
Baracuda-127
Bullet
16,050
21,038
29,507
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Bullet
374
491
688
3
Total demand for detonators
*
1,000
units
26,354
36,493
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
4
Total demand for detonating
wires *
1,000
m
19,649
27,668
31,589
5
Total demand for detonating
charges
1,000
charges
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
312
367
Notes: * Including those for the
petroleum industry
APPENDIX 2
PORTFOLIO OF THE INDUSTRIAL EXPLOSIVE MATERIALS
BRANCH FOR THE 2002-2005 PERIOD
(Promulgated together with the Prime Minister’s Decision No. 64/2002/QD-TTg
of May 23, 2002)
No.
Portfolio
Investment
form
Investment
year
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Capacity
I
Mining Chemicals Company (1�3)
1
Investment in production
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
New
construction
2002�2003
Quang
Ninh province
2000�3000 tons/year
2
Investment in supply process
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
-
Construction of warehouses
New
construction
2002�2005
Son
La, Bac Kan, Gia Lai,
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Kien
Giang provinces
40
tons
-
Transport means (truck,
sea-going ship, barge)
New
2002�2005
Enterprises
and their branches
-
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
New
2002�2005
-
Explosion service equipment
New
2002�2003
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
-
ANFO producing and loading
vehicles
New
2002�2005
Ninh
Binh, Kien Giang provinces
Two
5-ton vehicles
3
Investment in industrial
explosive materials research and experiment
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
-
Facilities and equipment
New
2002�2004
Quang
Ninh province
II
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
1
Investment in production
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
-
Nitratammonium production
chain
New
construction
2002�2003
Vinh
Phuc province
20,000
tons/year
-
Raising of quality of present
emulsion explosives (Z131)
Renovation
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Thai
Nguyen province
3,000
tons/year
-
Raising of quality of present
emulsion explosives (Z113)
Renovation
2002
Tuyen
Quang province
3,000
tons/year
-
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
New
construction
2002
Thai
Nguyen province
300�500 tons/year
-
Production chain of raw
materials for manufacturing explosion support devices (Z121)
Renovation
2002
Phu
Tho province
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
-
Production chain of
differential, non-electrical and safety support devices (Z121)
Renovation,
expansion
2003�2004
Tuyen
Quang province
80
million units
-
Production chain of industrial
explosive materials for the petroleum industry (Z115)
New
construction
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Thai
Nguyen province
2
Investment in supply process
-
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
New
construction
2002�2003
Central
region and Dong Nai
150
& 120 tons
-
Trucks
New
2002�2005
GAET
company
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
APPENDIX 3
PORTFOLIO OF THE INDUSTRIAL EXPLOSIVE MATERIALS
BRANCH FOR THE 2006-2010 PERIOD
(Promulgated together with the Prime Minister’s Decision No.64/2002/QD-TTg
of May 23, 2002)
No.
Portfolio
Investment
form
Investment
year
Construction
site
Capacity
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Mining Chemicals Company
1
Investment in production
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Production chain of loose
emulsion explosives
New
construction
2006
Quang
Ninh province
5,000
tons/year
2
Investment in supply process
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
-
Construction of warehouses
New
construction
2006�2010
Nghe
An, Khanh Hoa, Ha Nam provinces
60
tons
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Transport means (truck,
sea-going ship, barge)
New
2006�2010
Enterprises
and their branches
-
Port loading-unloading
equipment
New
2006�2010
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
-
Other investments (motorway,
control house, computer network, mechanical workshop)
New
2006�2010
3
Investment in explosion
services
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
-
Loose emulsion producing and
pumping vehicles
New
2007
Quang
Ninh province
One
10-ton vehicle
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Plants under the General
Department for Defense Industry
1
Investment in production
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
-
Production chain of high-power
explosives (Z115)
New
construction
2006
Thai
Nguyen province
2,000-3,000
tons/year
-
Upgrading of existing emulsion
technologies and equipment (Z131)
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2007
Thai
Nguyen province
4,000
tons/year
-
Upgrading of existing emulsion
technologies and equipment (Z113)
Renovation
2008
Tuyen
Quang province
4,000
tons/year
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Investment in supply process
-
Trucks
New
2006
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2
trucks
THE PRIME MINISTER OF GOVERNMENT
Nguyen Tan Dung