THE PRIME MINISTER
|
SOCIALIST REPUBLIC
OF VIET NAM
Independence – Freedom – Happiness
|
No. 100/2008/QD-TTg
|
Hanoi, July 15, 2008
|
DECISION
APPROVING
THE MASTER PLAN ON SOCIO-ECONOMIC DEVELOPMENT OF TUYEN QUANG PROVINCE UP TO
2020
THE PRIME MINISTER
Pursuant to the December 25, 2001 Law on
Organization of the Government;
At the proposal of the People’s Committee of Tuyen Quang province in Report No.
41/TTr-UBND of November 9, 2007, and the Planning and Investment Ministry’s
opinions in Document No. 901/BKH-TD&GSDT of February 12, 2008, concerning
the master plan on socio-economic development of Tuyen Quang province up to
2020,
DECIDES:
Article 1.- To approve the master plan on socio-economic development of
Tuyen Quang province up to 2020, with the following principal contents:
I. DEVELOPMENT
VIEWPOINTS
- Attaining a fast and sustainable economic
growth through efficiently tapping the province’s potential and advantages,
step by step narrowing the gap between the development level of the province
and the average level of die whole country and getting rid as soon as possible of
the present underdevelopment status; ensuring the inherent relationship with
the socio-economic development of the northeastern region and northern
mountainous region; quickly integrating with other economic regions and the
whole country; effectively realizing the international economic integration
roadmap.
- Developing all economic sectors; utilizing
to the utmost local strengths and concurrently strongly mobilizing external
resources for the province’s economic development.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
- Closely combining socio-economic
development with defense and security maintenance and eco-environmental
protection.
II. DEVELOPMENT
OBJECTIVES
1. General objectives
To build Tuyen Quang into a comprehensively
developed province, and continue striving to maintain fast and sustainable
economic growth with a civilized society, a protected eco-environment and
firmly maintained defense and security. To step up economic restructuring
toward industrialization and modernization so as to build an economic structure
of industry - service -agriculture - forestry. To strive for the target that by
2020 Tuyen Quang will become a relatively developed province in the northern
mountainous region and reach the average development level of the whole
country.
2. Specific objectives
- The average annual GDP growth rate will
reach over 14% by 2010, over 14.5% during 2011 -2015. and over 14.8% during
2016-2020.
- The average per-capita GDP will be more
than VND 12 million (USD 740) by 2010. and more tharrVND 30 million (USD 2,000)
by 2020.
- The present economy structure (agriculture
-forestry - industry - service) will be quickly switched to a new one of
industry - service -agriculture -forestry.
- By 2010, the industry - construction ratio
will be 40%, service ratio 35%, and agriculture -forestry ratio 25% of the
economic structure.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
- The industrial production value (at the
fixed prices of 1994) will reach over VND 3.600 billion by 2010, and over VND
10,000 billion by 2020.
- The total food output will be more than 320,000
tons and the annual per-capita food output will be more than 400 kg by 2020.
- The export turnover will reach over USD 27
million by 2010, and over USD 100 million by 2020.
- To develop agriculture and forestry in
combination with protecting tine eco-environment and maintaining the forest
coverage rate of over 60%.
- To raise the quality of education and
training; to effectively ramify school pupils under regulaiions. To strive for
the target that by 2020. over 75% of general education schools will attain the
national standards.
-To increase the life expectancy of local
people to over 70 years by 2010 and 73 years by 2020. To reduce the
malnutrition rate among under-five children to below 15% by 2010 and below 10%
by 2020. By 2010 and 2020, every 10,000 local people will have 18 and 20
hospital beds, respectively.
- To create new jobs for more than 58,000
laborers in the period from now to 2010; and 100,000 laborers during 2011 -
2020. To reduce the unemployment rate in urban areas to below 3.5% by 2010 and
below 2.5% by 2020. To increase the rate of trained laborers to over 30%,
including 15% of vocationally trained laborers, by 2010, and over 50% and 30%
by 2020.
- The poor household rate will drop to below
15% by 2010. and below 10% by 2020.
- By 2020, 100% of urban inhabitants and over
95% of rural inhabitants will be supplied with clean water.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
- All industrial clusters, parks and spots
will have systems for collecting and treating waste and wastewater up to
environmental sanitation standards.
- All urban centers in the province will have
systems for collecting and treating production and daily-life waste and
wastewater, hospital waste and hazardous waste.
III. ORIENTATIONS FOR
DEVELOPMENT OF DOMAINS AND SECTORS
1. Industrial development
- From now to 2010: Toconcentrate on quickly
developing the industries of agricultural and forest product processing,
construction material production, and mineral exploitation and processing with
a view to efficiently exploiting natural resources; to develop mechanical
engineering to serve agricultural and forestry production, consumer goods
production and other industries. To encourage the development of industries
endowed with advantages and suitable to the planning of local raw materials and
natural resources, such as paper and pulp production, wood and MDF pressed
board processing, tea processing, small-sized hydropower projects, cement
production, steel billet and ferro-manganese mills, barite powder, stone powder
and stone product processing.
- To plan and invest in infrastructure works
of Long Binh An cluster of industrial-service areas and urban centers, and
industrial clusters in Na Hang, Chiem Hoa, Ham Yen and Son Duong districts;
- During 2011-2020: To concentrate on
mobilizing resources for developing industries with a high technological
content, consumer and export goods production, such as paper production, export
wood article processing, high-quality tea processing, steel production,
manufacture of parts and accessories for automobiles and
motorbikes;electro-informatics, textile and garment, footwear, assembly
engineering, agricultural and forest product processing industries.
- To further invest in infrastructure and
attract investment in industrial clusters and parks of the province; to
encourage the development of industries, cottage industries and handicrafts in
rural areas, and plan the development of cottage industries and handicrafts
toward centralization in order to create commodity products.
2. Service development
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
- To develop tourism into an important
industry, creating more jobs and efficiently exploiting the province’s tourist
potential. To develop tourism in the direction of concentrating investment in
three major tourist zones: a historical-cultural tourism zone, a tourist resort
and an eco-tourism zone. By 2010, to attract more than 500,000 tourist
arrivals, earn a total turnover of VND 500 billion from tourism, and create
jobs for 8,000 laborers in the industry. By 2020, to attract more than
1,500,000 tourist arrivals, eam a total turnover of VND 2,000 billion from
tourism, and create jobs for 21,000 laborers in the industry.
- To develop transportation to meet socio-economic
development requirements: to raise the road transport capacity and quality; to
develop waterway transport; to encourage the development of mass transit in
urban areas and transportation in service of mountainous, deep-lying and remote
areas. The transported goods volume will increase by 16%/year from now to 2010
and 6.4%/year during 2011-2020. The number of transported passengers will
increase by 15%/year from now to 2010 and 5.5%/year during 2011 - 2020.
- To strongly develop domestic and
international postal and telecommunications services; to raise the efficiency
of operation of postal and cultural spots, and universalize basic postal and
telecommunication services. To strive for the target that every 100 people will
have 15 telephone sets by 2010 and 25 telephone sets by 2020.
- To strongly develop financial, banking, scientific,
technological and insurance services for the province’s socio-economic
development.
3. Agricultural, forestry and fishery
development
- To develop agriculture and forestry in the
direction of commodity production; to apply sciences and technologies to
production, raising productivity and product quality; to strongly restructure
cultivation plants and domestic animals to satisfy market demands; to ensure
food security in the province. The annual food output will reach 320,000 tons
with an annual per-capita food output of 400 kg.
- To expand field areas under groundnuts and
soy beans. To plan areas for production of commodity groundnuts in Chiem Hoa
district; to convert present land areas under low-yield rice cultivation into
those for groundnuts, soy beans and other plants of high economic value.
- To continue replacing present tea varieties
with new ones of high yield and quality. To review and plan raw material
sugarcane zones to supply sufficient raw materials for sugar refineries.
- To increase the ratio of husbandry in
agriculture to 45% by 2020. To apply husbandry solutions on suitable scales and
in appropriate forms. The buffalo herd, cow herd, pig stock and poultry flock
will grow 2%, 10%, 6% and 10% year on year, respectively.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
- To expand areas and increase the value of
aquaculture; to develop aquaculture in Tuyen Quang hydropower reservoir. The
aquatic product output will increase 8.5% year on year. The flesh fish output
will reach 4,500 tons by 2010 and 5,000 tons by 2020.
- To attach importance to the development of
the farm economy. To accelerate the building of rural villages and hamlets
toward industrialization and modernization. To attach importance to effective
settlement of problems related to agriculture, rural areas and farmers.
4. Cultural and social domains
a/ Education and training development:
- Pre-school education: By 2008, every
commune will have at least one pre-school basically satisfying the conditions
of physical foundation, educational administrators and core teachers. By 2010,
to firmly maintain the percentages of children of eligible age groups attending
kindergartens (non-public kindergartens accounting for 80%) at more than 32%;
and pre-school classes (non-public pre-school classes accounting for 70%) at
98%. By 2015 and 2020, these percentages will be 40% and 100%, and 50% and
100%, respectively.
- General education: To encourage the
diversification of semi-boarding schools and classes, and strongly develop the
organization of schools and classes opened on a semi-daily basis. To realize
the socialization of education. To elaborate planning and plans on
transformation of public educational establishments into ones applying the
mechanism of autonomy and accountability in their organizational structure,
payroll and finance. To establish some non-public upper secondary schools in
Tuyen Quang town, district centers and areas where conditions permit. To raise
the teaching and learning quality, and strive for the target that by 2020. over
75% of general education schools will attain the national standards.
- Training and job training development: To
step up the development of training and job training: to plan a system of job-training
schools; to establish the Tuyen Quang Community University on the basis of the
Teachers Training School. To establish the Medical College on the basis of the
Medical Secondary School, which will enroll students under an open mechanism
and operate under a self-financing mechanism.
- To step up the socialization of education
and training. By 2010, 99% of people aged between 15 and 35 years will have
literacy skills, 100% of cadres, public servants and employees in state
agencies will attend professional and skill training and retraining courses,
85% of peasant households will be covered by living standard improvement
programs. By 2020, these percentages will all be 100%. To strive for the target
that by 2020, all cadres and public servants working at commune, ward or
township level or higher levels will possess professional qualifications of
collegial or higher levels.
b/ Healthcare, population, family and
children
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
- To strive for the target that 100% of
communes, wards and townships will attain the national healthcare standards;
100% of communes will have medical doctors to give medical examination and
treatment to local people, with 80% of communes having medical doctors on the
payroll of commune health stations; every commune health worker will serve
between 1,000 and 1,500 people: 100% of villages and hamlets will have their
own health workers; every 10,000 people will have 8 medical doctors. To ensure
that every person will have convenient access to quality healthcare services at
all levels. By 2010 and 2020, every 10.000 people will have 18 and 20 hospital
beds respectively.
- To step up the socialization of healthcare;
to encourage the establishment of non-public hospitals to provide high-quality
medical examination and treatment.
- To continue training health workers to
raise their professional qualifications. To ensure that all directors, deputy
directors, heads and deputy heads of departments of hospitals and health
centers of districts and towns, and heads and deputy heads of divisions and sections
of provincial-level Health Services will possess lst degree and 2nd
degree specialist qualifications. By 2020, 90% of doctors of the provincial
general hospital will possess 1st degree or higher specialist
qualifications.
c/ Development of culture, information, radio
and television broadcasting
- To strive for the target that by 2020,90%
of households will be given the cultured family title; 80% of villages, hamlets
and people’s groups will be recognized as cultured ones; 100% of commune
cultural houses will be furnished with sufficient equipment and facilities for
their operation; and 100% of communes will have their own libraries.
- To invest, restore, conserve and embellish
historical and cultural relics; to exploit and protect cultural institutions
and values in order to combine cultural development with tourism. To build,
complete and invest in equipment and facilities of cultural houses of villages
and hamlets through mobilizing social contributions. To build a number of
ethnic cultural villages for tourist development.
- By 2020, 97% and 93% of the population will
have access to radio and television broadcasts, respectively.
d/ Sports and physical training
- By 2020,30% of the population will practice
physical training and exercises on a regular basis, and 25% of households will
attain the standards on sport families.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
To synchronously apply solutions, mechanisms
and policies to realize the poverty alleviation program. To develop
infrastructure and create opportunities for the poor to get access to public
services. To attach importance to intensive investment in the development of
works in service of production and daily life of poor households. To strive for
the target that by 2010 and 2020, the percentage of poor households will drop
to below 15% and below 10%, respectively.
5. Management of natural resources and
environmental protection
-To rationally exploit and use natural
resources (earth, water, minerals and the environment) in a sustainable,
economical and efficient manner. To efficiently exploit the land fund and
rationally al locate available land areas for use in the direction of ensuring
the economic structure of industry -service - agriculture - forestry. To
survey, assess and draw planning maps for exploration, exploitation and use of
minerals in Tuyen Quang province. To explore and assess reserves and quality of
assorted minerals. To organize mineral exploitation and processing in a
rational and efficient manner, ensuring the environmental protection.
- To limit the rate of increase in
environmental pollution; to prevent and minimize environmental pollution, to
rehabilitate and restore the environment in places and areas where it has
degraded; to conserve biodiversity; to step by step raise the environmental
quality of urban areas, industrial clusters and parks and tourist sites. To
build garbage landfills and waste-treating plants in replacement of the garbage
dumpsites in Nong Tien commune and Tuyen Quang town. Every district will have
at least one garbage landfill and treatment facility meeting the environmental
sanitation requirements. To plan and develop daily-life water supply and
environmental sanitation in the province.
6. Defense and security
To combine socio-economic development with
defense and security maintenance. To build strong all-people defense and people’s
security postures. To ensure the firm maintenance of political security, social
order and safety, and sustainable socio-economic development in the province.
IV. INFRASTRUCTURE
1. Transport
To upgrade existing road traffic works; to
invest in new key works in order to raise the capacity of and complete the
road, waterway and railway networks.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
- During 2016 - 2020: To continue improving
and step by step modernize the transport network in the province.
+ Roads:
Expressways: To invest in Tuyen Quang -Doan
Hung expressway linked with Hai Phong -Kunming expressway.
National highways: To renovate and upgrade
national highways sections running through the province to reach grade-III road
standards by 2020, including national highways 2,2C, 2B, 37, 37B, 279 and Ho
Chi Minh road.
Provincial roads: To renovate and upgrade
provincial roads to reach grade-IV road standards by 2020, including provincial
roads 190,185,186, 187, 188 and 189. Provincial roads running through towns,
townships and commune centers will be expanded according to urban road standards.
District roads: To plan 15 district roads. To
renovate and upgrade district roads to reach grade-V road standards by 2020.
Urban roads: To plan urban roads in line with
the province’s urban planning.
+ Railways: To comply with the central government’s
planning on a railway of Yen Bai -Tuyen Quang - Thai Nguyen.
+ Waterways: To invest in a project on
waterway transport from Viet Tri to the downstream area of the Tuyen Quang
hydropower plant; to develop waterway transport channels in which vessels of up
to 200 tons can navigate. To build a system of waterway landing stages to serve
goods and passenger transportation and tourism development.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
- To concentrate on renovating and developing
the distribution grid, and manage the safe and efficient exploitation and use
of the power grid. To strive for the target that by 2020, the commercial power
output will reach 1,000 million kWh.
- To further invest in small-sized hydropower
plants, including Chiem Hoa. Hung Loi 1, Hung Loi 2 (Yen Son district). Thac
Rom (Chiem Hoa district), Nam Vang (Na Hang), Phu Luu (Ham Yen) and others.
3. Water supply and drainage system
- To expand the scope and raise the quality
of water supply. To strive for the target that by 2020, 100% of urban
inhabitants and over 95% of rural inhabitants will be supplied with clean
water.
-To make intensive investment in urban water
drainage works. To apply measures to treat solid waste and wastewater in urban
centers, industrial clusters and parks, tourist sites and hospitals.
4. Irrigation system
-To invest in building irrigation works under
the planning. To manage, reinforce, upgrade and efficiently exploit existing
works in order to raise the irrigating capacity.
- To build embankments to protect the
downstream area of the Tuyen Quang hydropower plant, banks of Lo river (the
section flowing through Tuyen Quang town) and Pho Day river (the section
flowing through Tan Trao - the historical relic of the former resistance zone
in Son Duong district).
5. Social infrastructure
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
- Healthcare: To concentrate investment in
upgrading and improving the grassroots healthcare network. To invest in
building health stations of communes and wards to reach national standards. To
continue accumulating capital for renovation, expansion, upgrading of, and
additional supply of equipment and facilities to, the provincial general
hospital, the convalescent hospital in My Lam mineral spring, provincial- and
district-level hospitals in order to basically satisfy the people’s medical
examination and treatment needs. During 2007 - 2010, to build the Medical
Secondary School into the Medical College, which will be upgraded into the
Medical University during 2011 -2020.
- Culture, information, physical training and
sports: To restore, preserve, embellish and promote the value of historical and
cultural relics. To plan the building of cultural, information and sport
institutions from provincial to grassroots levels. To further invest in
building commune and village cultural houses. To concentrate investment in
building such works as a provincial convention center, provincial public
square, provincial museum, provincial general science library, center for youth
and juvenile activities, etc. To build a provincial cultural and artistic
training school to train cultural and artistic cadres and activists.
To upgrade and modernize radio and television
broadcasting equipment in order to raise the quality of signal receipt and
transmission. To build commune-level FM radio broadcasting and public address
stations.
To invest in building a provincial sport
complex and water sport facility. In districts, io build physical training and
sport centers, stadiums, playgrounds and training grounds. To plan and build
sport facilities for industrial parks and clusters and urban centers.
V. TERRITORY-BASED
DEVELOPMENT ORIENTATIONS
1. Zonal development orientations:
To develop the province in three major zones:
a/ The northern mountainous zone:
- This zone covers three districts of Na Hang.
Chiem Hoa and Ham Yen. To step up socioeconomic development in the northern
mountainous and hilly areas at a high rate in order to alleviate poverty and
narrow the gap between this zone and other zones of the province in terms of
living standards and social progress.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
- To develop the industry of mining and
processing assorted minerals. To concentrate on developing eco-tourism and
historical-cultural tourism. To completely build the Tuyen Quang hydropower
project. To build other small-sized hydropower plants. To develop
infrastructure, production and services with the Tuyen Quang hydropower plant
being the driving, force.
b/The central zone:
- This zone covers Tuyen Quang town and its
vicinity. To strive to build Tuyen Quang town into an economic, political,
cultural, scientific, technical, industrial, service and tourist center and a
traffic hub serving as a driving force for the socio-economic development of
all zones of the province.
- To form a synchronous infrastructure
system, especially traffic, information and communication networks, ensuring
smooth and uninterrupted transport and communication with other zones of the
province and other provinces.
- To strongly develop the industries of
construction material production and agricultural and forest product and
mineral processing. To plan -and develop, and attract investment in. industrial
clusters and parks and service-urban centers in Long Binh An. To properly
exploit the My Lam mineral spring tourist resort as a breakthrough in Tuyen
Quang province’s tourism. At the same time, to develop the historical-cultural
tourist sites in Tuyen Quang town.
c/ The southern zone:
- This zone covers Yen Son and Son Duong
districts. It has great potential in minerals, a large agricultural land area
and the former resistance base of Tan Trao with numerous historical relics. Its
population is large and of a fairly high educational level. It also has a
fairly good infrastructure system with roads, railways and river fairways.
- To concentrate on developing agriculture
and forestry in the direction of commodity production. To step up the
development of the mineral mining and processing industry. To preserve and embellish
the former revolutionary base. To invest in building and exploiting the tourist
potential of Tan Trao national cultural and ecological tourism site up to
regional magnitude.
2. Development of urban spaces
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
- During 2011 - 2020: To further adjust
administrative boundaries of Tuyen Quang town and upgrade it into a city. To
divide present Na Hang district into Na Hang town and a district. To establish
a new district on the basis of separating some communes of Yen Son and Son
Duong districts.
-Todeveloprural population areas: The rural
population will account for around 85% and 75% of the total population by 2010
and 2020 respectively. To further invest in building 38 commune cluster centers
and a number of new commune centers. Rural areas will have their own centers
and residential quarters rationally located on the basis of combining
production with transport and water source conditions. To build the
infrastructure system and cultural institutions in residential areas.
VI. MAJOR DEVELOPMENT
SOLUTIONS
1. Mobilizing investment capital sources
- To achieve the province’s socio-economic
development targets set for 2020 and attain the forecast economic growth rate,
the investment capital required for the 2007-2020 period is estimated at around
VND 137 trillion (around VND 40 trillion for the 2007-2010 period, VND 45 trillion
for the 2011-2015 period and VND 52 trillion for the 2016-2020 period).
- In order to mobilize investment capital,
measures should be taken to actively mobilize capital from the following
sources: around 25% from the state budget (including ODA): around 40% from
enterprises and population; around 5% from foreign investment: around 20% from
capital loans; and around 10% from other sources.
2. Developing human resources
- To plan and develop human resources; to
adopt incentive policies for cadres working in exceptionally difficult communes
and policies to attract highly qualified cadres to work in the province. To
strongly develop job training and plan the job training network in the whole
province, and upgrade and consolidate job-training establishments. To raise the
quality of trained laborers, especially those trained in industrial jobs and
agricultural and forest product processing. To prioritize the on-spot job
training of female or ethnic minority cadres.
- To strongly develop job training; to plan
the job training network in the whole province; to upgrade and consolidate the
Tuyen Quang vocational secondary school and job-training centers in districts.
To raise the quality of trained laborers. To encourage the establishment of
job-training schools with social contributions. To expand cooperation with
universities, colleges and job-training schools outside the province or abroad
in training human resources.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
To synchronously develop all types of market:
goods and service market, labor market, scientific and technological market,
real estate market, financial and monetary market. To develop commercial
infrastructure: trade centers, supermarkets, wholesale markets and commercial
agents. To actively develop goods and service markets both in rural and urban
areas as outlets for farm produce. To raise the marketing, market information
and forecast capacity, with importance attached to building brands for goods.
4. Developing sciences and technologies
To efficiently apply scientific and technological
advances to industrial and agricultural production, forestry, fisheries and
rural development. To formulate a mechanism for promoting scientific and
technological development, first of all development and attraction of human
resources. To plan the development of a contingent of scientific and
technological personnel and non-business units operating in the scientific and
technological domain.
5. Improving the investment environment and developing
all economic sectors
- To continue creating an open and convenient
environment for all economic sectors to develop. To concentrate efforts on
improving the investment environment in some breakthrough aspects; to finalize
socio-economic plannings; to perfect investment promotion institutions and
policies; to step up investment in infrastructure construction; to better
administration, with special attention paid to reform of administrative
procedures in the economic domain.
- To complete the reorganization and renewal
of state enterprises and agricultural and forestry farms; to strongly develop
small- and medium-sized enterprises and private and proprietor economy. To
consolidate and renew collective economic entities and raise their efficiency.
To strive for the target that the province will have more than 750 and 1,500
enterprises of all economic sectors by 2010 and 2020.
6. Adopting policies on cooperation and association
- To enhance cooperation with all localities
throughout the country, especially the northern mountainous and midland
provinces, economic centers and neighboring provinces, in investment, commerce
and tourism.
- To raise the efficiency of investment and
commercial cooperation. To formulate specific programs and schemes on
cooperation with other provinces and foreign countries in calling for investment
in economic projects for which the province has advantages. To attach
importance to the exchange of experience in socio-economic development
administration. To enhance cooperation in science, technology, culture, etc.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
To organize the effective implementation of
the administrative reform program. To concentrate efforts on reforming
administrative institutions and the organization of the administrative
apparatus; to raise the quality of cadres and public employees; to reform
public finance; to step up the reform of administrative procedures; and to
modernize the system of administrative offices to meet the requirements of
management and administration of socio-economic development.
VII. ORGANIZATION OF
IMPLEMENTATION OF THE MASTER PLAN
- To make public the master plan on socio-economic
development of Tuyen Quang province after it is approved. To propagate and
publicize it among the people and domestic and foreign investors in order to
attract their attention and participation in its implementation.
- To elaborate a planning on development of
branches and domains and detailed plans.
- To organize the implementation of the
master plan through five-year and annual socio-economic development plans.
Annual plans must be elaborated based on the objectives of the approved master
plan and implementation progress in each period.
- To supervise and inspect development
investment under the master plan. To enhance the responsibility of all levels,
branches and localities for implementing the master plan. At the end of each
planning period (2010, 2015, 2020) to evaluate the implementation of the master
plan in that period, and add and readjust objectives for subsequent periods to
suit practical conditions.
Article 2.-To
assign the People’s Committee of Tuyen Quang province to base itself or. the
objectives and orientations of the province’s socio-economic development in the
approved master plan to direct, in coordination with concerned ministries and
branches, the elaboration, submission for approval and implementation of:
- Master plans on socio-economic development
of its districts; planning on development of urban system and residential
areas; construction planning: land use planning and plans; planning on
development of branches and domains to ensure comprehensive and synchronous
development.
- To study and formulate for promulgation or
submit to competent state agencies for promulgation (for matters falling beyond
the province’s powers) a number of mechanisms and policies suitable to the
province’s development requirements in each period in order to attract and
mobilize resources for implementation of the master plan.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Article 4.- This
Decision takes effect 15 days after its publication in "CONG BAO."
Article 5.- Ministers,
heads of ministerial-level agencies, heads of government-attached agencies and
the president of the People’s Committee of Tuyen Quang province shall implement
this Decision.
PRIME MINISTER
Nguyen Tan Dung
APPENDIX
LIST
OF PROGRAMS AND PROJECTS PRIORITIZED FOR INVESTMENT IN TUYEN QUANG PROVINCE
DURING 2007-2020
{Promulgated together with the Prime Minister’s Decision No. 100/2008/QD-TTg
of July 15, 2008)
No.
Name of project
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Implementation
period
A
Investment programs
1
Program on industrial development
The whole province
2007 - 2020
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Program on development of forestry economy
The whole province
2007 - 2020
3
Program on tourism development
The whole province
2007 - 2020
4
Program on development of transport and
technical infrastructure
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2007 - 2020
5
Program on development of power grids
The whole province
2007 - 2020
6
Program on clean water and environmental
sanitation
The whole province
2007 - 2020
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Program on development of information
technology
The whole province
2007 - 2020
8
Program on development of post and
telecommunications
The whole province
2007 - 2020
9
Program on development of human resources,
science and technology
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2007 - 2020
10
Program on labor, employment and guest
workers
The whole province
2007 - 2020
11
Projects under national programs executed
in the province
The whole province
2007 - 2020
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Foreign-invested programs and projects
The whole province
2007 - 2020
B
Major investment projects
I
Industry
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
-
1
Project on An Hoa pulp plant
Long Binh An industrial park
2006-2010
2
Project on An Hoa chain for production of
kaolin-coated paper of all grades
Long Binh An industrial park
2008 - 2010
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Project on building Tuyen Quang wood
processing plant
Long Binh An industrial park
2007 - 2008
4
Project on building a plant to produce MDF
artificial boards
Long Binh An industrial park
2007-2010
5
Project on building a plant to produce
chopsticks for export
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2006 - 2007
6
Na Hang plant producing pulp, base paper
and bamboo chopsticks
Na Hang district
2007 -2010
7
Project on building a plant to produce
steel billets
Long Binh An industrial park
2006 - 2010
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Project on building a plant to process
barite powder
Long Binh An industrial park
2006 - 2007
9
Project on exploiting and processing kaolin
and feldspar
Son Duong district
2007 - 2010
10
Project on building a zinc plant
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2008-2010
11
Project on building an antimony plant
Chiem Hoa district
2007 - 2010
12
Project on building a ferro-manganese plant
Chiem Hoa district
2006 - 2007
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Project on building Tuyen Quang cement
plant
Tuyen Quang town
2008 - 2012
14
Project on building Son Duong cement plant
Son Duong district
2007 -2010
15
Project on building a tunnel brick plant
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2007-2010
16
Project on a tunnel brick and non-baked
brick plant
Long Binh An industrial park
2007 -2010
17
Project on a stone powder and product plant
Districts
2008 - 2015
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Project on building Chiem Hoa hydropower
plant
Chiem Hoa district
2007 - 2015
19
Project on building Thac Rom hydropower plant
Chiem Hoa district
2007 - 2015
20
Project on building Hung Loi I hydropower
plant
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2007- 2015
21
Project on building Hung Loi II hydropower
plant
Yen Son district
2007-2015
22
Project on building Nam Vang hydropower
plant
Na Hang district
2007-2015
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Project on building Ninh Lai hydropower
plant
Son Duong district
2007 - 2015
24
Project on building a mechanical
engineering plant
Long Binh An industrial park
2007 - 2015
25
Project on building a package material
plant
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2007-2015
26
Project on a dairy processing plant
Long Binh An industrial park
2008 - 2015
27
Project on a plant producing bottled
mineral water
Yen Son district
2008 - 2015
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Project on renewal of tea-processing
technology
Yen Son and Son Duone districts
2008 - 2015
29
Project on production of micro-biological
fertilizers
Long Binh An industrial park
2008 - 2010
30
Project on a garment chain
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2008 - 2010
31
Project on a plastic product chain
Long Binh An industrial park
2008 - 2015
32
Project on expansion of Tuyen Quang
"printing house
Tuyen Quang town
2008 - 2010
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Project on investment in infrastructure of
Lone Binh An industrial park
Long Binh An industrial park
2007 - 2015
34
Project on Long Binh An water plant
Long Binh An industrial park
2008-2010
II
Agriculture, forestry, irrigation
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
1
Project on planting of production forests
Districts
2007 - 2020
2
Project on protection and development of
protection forests
Districts
2007 - 2020
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Project on investment in research of forest
tree varieties
Yen Son and Son Duong districts
2008-2010
4
Project on Son Duong dike and dam
Son Duong district
2008 - 2010
5
Project on embankments of Lo river (the
section flowing through Tuyen Quang town) 2008 - 2010
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2008 - 2010
6
Project on embankments of Pho Day river
(the section flowing through the ATK zone)
Son Duong and Yen Son districts
2007 - 2009
7
Project on embankments of two banks
upstream and downstream the bridge of Chiem Hoa township
Chiem Hoa district
2008 - 2010
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Project on selection and propagation of
pure buffalo breeds of Tuyen Quang province
Districts
2007 - 2010
9
Project on revitalization of the local
yellow cow herd
Districts
2007 - 2010
10
Project on lean pig farming
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2007 - 2010
11
Project on aquaculture in reservoirs of the
Tuyen Quang hydropovver plant
Na Hang district
2008 - 2015
12
Project on a poultry breeding center
Districts
2008 - 2020
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Project on evacuation of people from
natural disaster-hit areas
The whole province
2007 - 2010
14
Project on investment in tea development
The whole province
2007-2015
15
Project on rural infrastructure
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2007 - 2020
16
Project on irrigation development planning
The whole province
2007 - 2020
17
Project on aquatic resource development
planning
The whole province
2007 - 2020
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Project on rural population planning and
redistribution
The whole province
2007 -2020
III
Commerce and tourism
1
Project on My Lam mineral spring tourist
resort
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2006-2010
2
Project on Na Hang eco-tourism site
Na Hang district
2007 - 2015
3
Project on Tan Trao national
cultural-historical and ecological tourism site
Son Duong district
2007 -2015
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Project on Kim Binh historical relic
Chiem Hoa district
2007 - 2020
5
Building tourist and entertainment centers
The whole province
2007- 2020
6
Building new markets and trade centers and
upgrading existing ones
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2007 - 2020
IV
Transport
1
WB-funded project
Districts and towns
2007 - 2020
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
ADB-funded project
Districts and towns
2007 - 2020
3
Project on building national highway 37
2007 - 2010
4
Project on building national highway 2
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2007 - 2010
5
Project on building national highway 279
2007 - 2010
6
Project on Ho Chi Minh road
2008 - 2015
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Project on Yen Bai - Tuyen Quang - Thai
Nguyen railway
2008 - 2020
8
Project on provincial roads
Districts and towns
2008 - 2020
9
District roads
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2008 - 2020
10
Project on internal roads and urban roads
Districts and towns
2008 - 2020
11
Project on rural roads
Districts and towns
2008 - 2020
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Project on waterway transport from Viet Tri
to the downstream area of the Tuyen Quang hydropower plant
2008 - 2015
13
Tu Quan bridge
Yen Son district
2008 - 2010
14
Xuan Van bridge
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2009 - 2015
15
Hop Thanh bridge
Son Duong district
2009 - 2015
16
Kim Xuven bridge
Son Duong district
2008 - 2015
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Construction
1
Project on supply of urban daily-life water
Districts and towns
2008 - 2010
2
Project on water drainage systems in urban
areas, industrial parks and clusters
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2008 - 2010
3
Project on building the province’s public
square
Tuyen Quang town
2008 -2010
4
Division and adjustment of administrative
boundaries of existing districts and establishment of new districts
2008 - 2015
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Project on Phu An new urban center
Tuyen Quang town
2008 - 2015
VI
Education
1
Project on upgrading general education
schools
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2007 - 2010
2
Project on upgrading the medical secondary
school
Tuyen Quang town
2007 -2010
3
Project on upgrading the economic-technical
secondarv school
Yen Son district
2008 - 2010
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Project on upgrading multi-purpose and
dormitories of the teachers training school
Yen Son district
2008 - 2010
5
Project on investment in building a
provincial boarding upper secondary school for ethnic minoritv pupils
Tuyen Quang town
2007 - 2010
6
Project on building standard schools within
the program on building of permanent schools and classrooms
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2008 -2010
7
Project on building standard classrooms,
practice laboratories and libraries
Schools
2007 - 2010
VII
Culture, information, physical training and
sports
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Project on a provincial convention center
Tuven Quang town
2007-2010
2
A provincial sport complex
Tuyen Quang town
2007 - 2015
3
Project on building the provincial museum
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2007 - 2009
4
Project on conservation and promotion of
intansible cultures
Districts and towns
2008 - 2010
5
Project on building a provincial general
science library
Tuyen Quang town
2008 - 2015
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Project on restoration and embellishment of
historical and revolutionary relics of the North Vietnam resistance base
Son Duong, Yen Son and Chiem Hoa districts
2008 - 2010
7
Project on restoration and embellishment of
the historical relic of the Government
Son Duong district
2007 - 2010
8
Project on upgrading of Tan Trao former
resistance base museum
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2007-2010
9
Project on investment in building cultural,
information and sports centers of districts and towns
Districts and towns
2008 - 2015
10
A provincial entertainment center for youth
and children
Tuyen Quang town
2007 - 2009
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Project on entertainment centers for
children in districts and towns
Districts and towns
2008 - 2020
VIII
Radio and television broadcasting
Investment in development of material and
technical foundations of the whole branch
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2008 - 2020
IX
Healthcare
1
A general hospital of Tuyen Quang province
Tuyen Quang town
2008-2015
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
A hospital for tuberculosis and pneumonic
diseases
Tuyen Quang town
2008 - 2010
3
A national medicine hospital
Tuyen Quang town
2007 - 2020
4
The My Lam mineral spring hospital
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2008-2015
5
A social disease prevention and control
center
Tuyen Quang town
2008 - 2010
6
A preventive medicine center of Tuyen Quang
province
Tuyen Quang town
2008 -2010
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Hospitals of districts
Districts
2008 - 2015
8
Preventive medicine centers of districts
Districts
2008 -2015
9
Yen Hoa hospital
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2007 - 2010
10
The hospital of the former resistance zone
Son Duone district
2008 - 2010
11
Kim Xuven hospital
Son Duong district
2008 - 2010 •
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Polyclinics of communes
All communes
2008 - 2020
13
Commune health stations
All communes
2008 - 2015
14
Project on investment in family and
children counseling centers
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2007 - 2010
X
Labor and social affairs
1
Project on upgrading the system of schools
and job-training establishments
Districts and towns
2007 - 2015
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Project on building a provincial medical
treatment - education - labor and social affairs center
Yen Son district
2008 - 2010
XI
Other projects
Project on investment in socio-economic
development of the former revolutionary base of Tuyen Quang province (under
the Prime Minister’s Decision No. 148/2007/QD-TTg of September 10. 2007)
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2007 - 2010
Note:
Locations, sizes and total investment capital amounts of projects will be
specifically calculated, selected and determined at the stage of formulation
and submission for approval of investment projects and suitable to localities’
needs and capability to balance and mobilize resources.-