THE MINISTRY OF TRANSPORT OF
VIETNAM
--------
|
SOCIALIST REPUBLIC OF VIETNAM
Independence - Freedom - Happiness
----------------
|
No. 29/2023/TT-BGTVT
|
Hanoi, September 29, 2023
|
CIRCULAR
ON RAILROAD CROSSINGS AND
CONSTRUCTION PERMIT FOR ESSENTIAL STRUCTURES ON RAILROAD GROUND
Pursuant to the Law on Railroad dated June 16, 2017;
Pursuant to Decree No. 56/2022/ND-CP dated August 24, 2022
of the Government on functions, tasks, powers, and organizational structures of
Ministry of Transport;
At request of Director of Transport Infrastructure
Department and Director of Vietnam Railway Administration;
The Minister of Transport promulgates Circular on railroad
crossings and construction permit for essential structures on railroad ground.
Chapter I
GENERAL PROVISIONS
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
This Circular prescribes railroad crossings (not including :
railroad and road on road-rail bridges; crossings between railroad and
special-use road serving professional operations of stations, terminals, cargo
yards, factories, industrial parks); traffic at railroad crossings; issuance,
renewal of permit to build, renovate, upgrade, remove railroad crossings on
national railroad, specialized railroad; issuance and renewal of construction
permit for essential structures on railroad ground.
Article 2. Regulated entities
This Circular applies to organizations and individuals
related to:
1. Construction, renovation, upgrade, destruction,
management, use, and maintenance of railroad crossings.
2. Traffic activities at railroad crossings.
3. Construction of essential structures on railroad ground.
Article 3. Definitions
1. Public railroad crossing means a road segment
within national highway, provincial road, district road, commune road, or urban
road that crosses national railroad, specialized railroad on the same level and
is permitted by competent authority for construction and use.
2. Specialized railroad crossing means a special-use
road segment that crosses national railroad, specialized railroad on the same
level and is permitted by competent authority for construction and use.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
4. Unattended railroad crossing means a railroad
crossing protected by automatic warning system or warning signs.
5. Railroad crossing with automatic warning means a
railroad crossing protected by automatic warning systems with or without
automatic barriers.
6. Railroad crossing with signs means a railroad
crossing protected by warning signs.
7. Long-term railroad crossing means a railroad
crossing with unlimited service life from the date on which competent authority
grants permission.
8. Limited-term railroad crossing means a railroad
crossing that is used only in a limited time permitted by the competent authority.
9. Railroad crossing barrier means crossing gate,
crossing barrier that is built, installed within the vicinity of railroad
crossing for the purpose of preventing humans, vehicles, and other objects from
crossing railroad in a definite period of time.
10. Road authority means an agency exercising state
management function affiliated with the Ministry of Transport; authority
affiliated with People’s Committees of provinces, central-affiliated cities,
People’s Committees of districts, communes, town-level cities; People’s
Committees of communes, wards.
11. Railroad crossing safety devices mean system that
serves to ensure traffic safety, prevent accidents at railroad crossing,
including: railroad crossing barrier; stationery posts and fences; road markings,
speed bumps, speed humps; railway and road traffic signs; railroad crossing
supervisory system; electric signal lights and bells; railroad crossing warning
signals, train stop signals and other relevant equipment.
12. Speed hump means a type of road marking whose
thickness does not exceed 6 mm which serves to inform vehicle operators (by
causing mild discomfort on the vehicles) about dangerous positions in order to
reduce speed and pay attention.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
Chapter II
REGULATIONS ON RAILROAD CROSSING
Article 4. Radius and area of railroad crossing
1. Radius of railroad crossings shall be determined as
follows:
a) Road segments, ground serving road traffic within
railroad traffic safety corridor and separation distance of railroad
structures.
b) Railroad segments and railroad ground within road safety
corridor.
2. Railroad crossing area consists of:
a) Radius of railroad crossing;
b) Traffic safety corridor at railroad crossing according to
regulations on management and protection of railroad traffic infrastructures.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
1. Classification of railroad crossings
a) by useful life: long-term railroad crossings;
limited-term railroad crossings;
b) by guard arrangement: attended railroad crossings;
unattended railroad crossings;
c) by service: public railroad crossings, specialized
railroad crossings.
2. Railroad crossings shall be classified into class I,
class II, and class III in accordance with Appendix I hereof.
Article 6. Location and angle of railroad crossings
1. For built railroad crossings:
a) Railroad crossings shall be located on railroad segment
with a straight profile. In case of extreme difficulty where railroad crossing
is located on a curved railroad segment, railroad crossings shall only be
located on segment with a minimum radius of 300 m and shall not be located on
easement curve segment.
b) Railroad crossings shall be at least 100 m away from
openings of railway tunnels, bridge abutment.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
d) Railroad crossings shall be located outside of signaling
posts for station entry; at least 3,5 m away from signaling posts for station
entry;
dd) The angle created by railway and road shall be
perpendicular (90o); in case of geographical restraint, this angle
shall not be less than 45o while still maintaining visibility
according to regulations on management and protection of railway
infrastructures;
e) If built railroad crossing does not meet at least one
criterion under Points a through dd of this Clause, project developers of
railroad crossing construction project shall, upon applying for approval of
railroad crossing construction guidelines, clarify requirements regarding
premise, financial resources, ensure compliance with planning approved by
competent authority, and satisfy socio-economic development of local
government.
2. For existing railroad crossings that have not met Point
a, Point b, Point c, Point d, Point dd Clause 1 of this Article;
a) During operation and use, railway infrastructure
enterprises (for public railroad crossings on national railway), owners of
specialized railway (for public railroad crossings on specialized railway),
managers and users of railroad crossings (for specialized railroad crossings),
agencies according to decentralization and authorization of People's Committees
of provinces, and Vietnam Railway Administration shall implement traffic safety
measures at dangerous locations according to Article 9 of Decree No.
65/2018/ND-CP dated May 12, 2018 of the Government.
b) During renovation and upgrade of railroad crossings,
project developers shall prepare adequate railroad crossing safety devices and
gradually improve at least one technical parameter of road in railroad
crossings regarding profile, angle, and longitudinal section.
Article 7. Railway in radius of railroad crossings
1. Technical requirements:
Check rail or auxiliary structures shall be required at
railroad crossings so that the distance between inside of primary rail and the
check rail or the auxiliary structures (hereinafter referred to as clearance)
satisfies requirements below:
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
b) Clearance width:
With respect to railroad cross located on straight rail or
curved rail whose radius is at least 500 m: clearance width shall be 75 mm;
With respect to railroad crossings located on curved rail
whose radius is less than 500 m: clearance width shall equal 75 mm + 1/2 of
widening of the curved section according to National Technical Regulation on
railway operation;
c) Minimum clearance depth is 45 mm;
d) If road section inside of the railway is made of asphalt
concrete, check rail shall be required; check rail elevation shall equal to
that of primary rail;
dd) If road section inside of the railway is made of slabs,
edges of slabs that are adjacent to primary rail shall be specifically designed
to form clearance;
e) If check rail is installed in accordance with Point a of
this Clause, both ends of the rail shall curve inwards; the length of curved
ends of check rail shall be 500 mm, rail clearance at the starting position of
the curved section shall conform to Point b of this Clause, rail clearance at
the end position of the curved section shall be 250 mm. The starting position
and end position of check rail shall be closely connected to sleepers;
g) Rail connection shall not be located in the radius of
railroad crossings. In case road at railroad crossing is wide, rail connection
shall be welded or stretched and clipped if it cannot be welded yet;
h) Rail fastening accessories shall be adequate and firmly
connected.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
a) Sleepers located in railroad crossings shall be reinforced
concrete sleepers; the use of metal or wooden sleepers in existing railroad
crossings shall be limited; the use of metal and wooden sleepers in new built
railroad crossings shall be prohibited;
b) Ballast in railroad crossings shall be clean, of
sufficient thickness, and up to standards as per the law;
c) Materials used in installation of railroad crossings
shall satisfy standards on materials used in railroad structures.
Article 8. Requirements of road segment of new built
railroad crossings
With respect to new built railroad crossings, road segment
at railroad crossings shall satisfy technical standards corresponding to road
level and regulations below:
1. Plane: road segment from the outer rail shall remain
straight over a distance equal to at least vehicle braking distance according
to standards on automobile roads - design requirements or at least 15 m in case
of geographical constraints. With respect to railroad crossings fitted with
median strip, the minimum distance from the edge of the outer rail to the end
of the medium strip shall be 6 m.
2. Longitudinal section:
a) Road segment from the inside of railway and outer edge of
the rail shall have 0% slope for at least 16 m or 10 m in length in case of
difficulties;
b) The subsequent road segment shall have at most 3% slope
for at least 20 m in length or at most 6% in case of railroad crossings in
mountainous regions or harsh terrains;
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
3. Width of roadway in the radius of railroad crossings
shall not be lower than width of roadway outside of the radius of railroad
crossings and shall not be lower than 6 m. If roadway extension is required in
order to fulfill the minimum width of 6 m, width of subsequent segment shall be
tapered to the width of roadway outside of the radius of railroad crossings at
a ratio of 10:1. Minimum width of road shoulders shall be sufficient for the
placement of road traffic signs.
4. Adequate water drainage system of the area shall be
required in the radius of railroad crossings.
5. Speed bumps and speed humps shall be installed in roadway
in the radius of unattended railroad crossings to enforce traffic safety. The
placement of speed bumps and speed humps shall conform to railroad crossing
safety arrangement under Appendix II hereof. In this case, road segment in the
railway and from the edge of the outer rail shall have 0% slope for at least 25
m in length.
6. If a separate road section is built for pedestrian across
railroad crossings, pedestrian road markings shall be required from the edge of
the outermost rail to vehicle stop marking according to National Technical
Regulations on road signals.
Article 9. Requirements of road segment in railroad
crossings in special circumstances
1. If an adjacent road branches into a railway where the
closest distance from the outermost rail to the road is less than 15 m:
a) Prioritize expanding road surface adjacent to railway to
facilitate waiting lane in order to enable road vehicles to observe before
turning into and after turning out of railroad crossings;
b) Minimum width of waiting lane shall equal the width of a
lane depending on road level. Expanded road surface shall be situated outside
of barriers between railway and road and ensure safety for railway vehicles and
road segment of railroad crossings. The placement of waiting lane shall conform
to Appendix III hereof;
c) Surface of road in the radius of railroad crossings shall
be raised or lower in order to ensure that road segment from the outermost rail
have 0% slope in at least 5 m in length; subsequent road segment have up to 6%
slope and satisfy technical requirements and standards corresponding to road
level.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
a) Road segment at railroad crossings shall have high
sloping gradient within the minimum radius of dimensional limits according to
National Technical Regulations on railway operation;
b) The subsequent road segment shall have 0% slope for at
least 16 m in length or at least 10 m in length in case of difficulties. The
subsequent road segment shall have at most 3% slope for at least 20 m in length
or at most 6% slope in case of railroad crossings in mountainous regions or
harsh terrains.
3. If an existing railroad crossings consists of one road
crossing multiple railways: slope of road inside the railway and road within a
1 m radius from the outermost rail shall conform to the topmost point of each
rail; subsequent road segment shall have slope conforming to difference in
elevation of the topmost points of the railways.
Article 10. Road surface structure at railroad crossings
1. Road surface in railway and from the outermost point of
primary rail to the edge of radius of the railroad crossing that is made from
slabs or other structures shall ensure ease of travel and be capable of
supporting load corresponding to road level.
2. If slabs are employed, slabs shall be placed from the
outermost point of primary rail to at least all the sleepers.
3. Road surface shall satisfy technical standards
corresponding to road surface structures. If reinforced concrete slabs are
employed, the slabs shall be firmly secured.
Article 11. Safety arrangement of railroad crossings
1. In case of class I and class II railroad crossings,
attended personnel shall be required.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
a) Automatic warning system shall be required if visibility
is guaranteed at the site of railroad crossings;
b) Attended personnel shall be required if visibility is not
guaranteed at the site of railroad crossings;
c) With respect to railroad crossings where automatic
warning system is installed and railroad crossing where traffic signs are
installed where visibility is not guaranteed at the site of railroad crossings:
Railway infrastructure enterprises shall take charge and
cooperate with People’s Committees of districts, road authority in inspecting
and requesting the Vietnam Railway Administration in arranging warning schemes
at dangerous railroad crossings on national railway in a manner conforming to
principles of ensuring safe train operation and traffic safety at railroad
crossings and submitting reports on implementation to the Ministry of
Transport;
Enterprises providing specialized railway shall take charge
and cooperate with People’s Committees of districts and road authority in
inspecting and requesting owners of specialized railway or owners or
specialized road to organize warning schemes at dangerous railroad crossings on
specialized railway. If owners of specialized roads are incapable of arranging
warning schemes, the owners shall reach a written agreement with specialized
railway infrastructure enterprises regarding traffic safety measures at the
site of railroad crossings.
3. Maps of attended and unattended railroad crossings are
detailed under Appendix II hereof.
Article 12. Railroad crossing guard posts
Railroad crossing guard posts shall only be used to
facilitate railroad crossing attendants performing guard duty at railroad
crossings and satisfy requirements below:
1. Guard posts shall be located in areas where occupying
attendants can easily observe both sides of road and railway.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
3. Railroad crossing guard posts shall include lavatories,
be provided with power, clean water, electric fan or air conditioners. New
built railroad crossing guard posts shall have minimum working area of 12 m2
and have sufficient area depending on number of employees in a shift.
Article 13. Lighting at railroad crossings
Attended railroad crossings located in area powered by the
national electric grid shall be fitted with lights which will be turned on at
night and during daytime if there is fog. Lights shall be sufficient to allow
railway vehicle operators and road vehicle operators to see signals of railroad
crossing attendants. Average illuminance shall be 25 - 30 lx, light uniformity
Emin/Etb shall not be lower than 0,5.
Article 14. Safety devices of railroad crossings
1. Safety devices of railroad crossings, upon being built or
fitted to railroad crossings, shall:
a) comply with technical regulations and standards
applicable to each type of device;
b) be adequately arranged depending on the type of railroad
crossings, be inspected and maintained at stable, safe operating conditions on
a regular basis, be able to prevent accidents through operation of railroad
crossings.
2. All organizations and individuals shall protect, not
intentionally move, expropriate, damage, or otherwise reduce effectiveness and
operation of safety devices of railroad crossings.
Article 15. Placement of safety devices of railroad
crossings
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
a) Manually-operated crossings barrier, crossing gates or
electric-powered crossing barriers, crossing gates which are manually
controlled or automatic crossing barriers;
b) Stationary fences;
c) Road markings;
d) Railway and road signs;
dd) Lights, sirens, or loudspeakers;
e) Railroad crossing signals, other than railroad crossings
located within range of signals for station entry, station exit, or signals of
shunting yards, block signals for railway with automatic rail closing device,
or other safety signals when signals above are less than 800 away from railroad
crossings;
g) Railroad crossing supervision system and other equipment
relating to traffic safety assurance at railroad crossings.
2. In case of unattended railroad crossings:
a) Railroad crossings with automatic warning:
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
Stationary fences;
Road markings, speed humps, speed bumps; train warning
signs;
Railway and road signs;
Lights, sirens, or loudspeakers;
Railroad crossing supervision system and other equipment
relating to traffic safety assurance at railroad crossings.
b) Existing railroad crossings with signs:
Posts;
Road markings, speed humps, speed bumps; train warning
signs, STOP (R122) signs in combination with auxiliary signs that say “Dừng lại
quan sát trước khi qua đường ngang” (Observe before crossing);
Railway and road signs;
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
Article 16. Posts and stationary fences
1. Posts shall be installed on both sides of road in the
radius of railroad crossings as follows:
a) Posts shall be installed up to the position where
railroad crossing barriers are installed in case of attended railroad
crossings;
b) Posts shall be 2,5 m away from the outermost rail in case
of unattended railroad crossings;
b) Posts shall be 1,5 m away from each other; each row shall
consist of at least 6 posts; fences shall be allowed as an alternatives for
posts in dangerous roads.
2. With respect to attended railroad crossings, stationary
fences shall be installed on both sides of the road anywhere between railroad
crossing barriers and at least 2,5 m away from railway in order to prevent
people and road vehicles from entering railroad crossings once railroad
crossing barriers have been deployed.
3. Arrangement and dimensions of posts, stationary fences
shall conform to National Technical Regulations on road signs.
4. If there are roads adjacent to railroad crossings and
railways requiring fences between road and railway in the radius of railroad
crossings, height of the fences shall ensure visibility of road vehicle
operators while moving through railroad crossings.
Article 17. Road markings, speed humps, speed bumps on road
in the radius of railroad crossings
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
a) Vehicle stop markings;
b) Slow down markings;
c) Lane markings;
d) Railroad crossing markings;
e) Markings that read “STOP” for railroad crossings with
signs;
g) Other road markings appropriate to characteristics of
railroad crossings in order to improve traffic safety at railroad crossings.
2. In case of railroad crossings where adjacent road surface
is limited for the purpose of road markings under Clause 1 of this Article,
road authority shall take charge and cooperate with railway infrastructure
enterprises in examining road in the radius of railroad crossings in order to
place road markings compliant with National Technical Regulation on road
markings, appropriate to practical conditions and traffic safety.
3. Location of vehicle stop markings:
a) Vehicle stop markings shall be at least 5 m away from the
nearest rail;
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
c) If the road is perpendicular to the railway, depending on
surface conditions and road traffic frequency, vehicle stop marking can be
placed parallel to the railway.
4. The construction and placement of speed bumps and speed
humps shall conform to applicable regulations.
5. Arrangement and placement of road markings shall conform
to National Technical Regulations on road signals.
Article 18. Road and railroad signs
1. In case of attended railroad crossings:
a) Stop sign:
Stop signs shall not be placed on railroad at railroad
crossings if the railroad crossings have been fitted with train stop signals or
if the railroad crossings are within range of station entry, exit signals, or
signals of shunting yards, block signals for railway with automatic rail
closing devices, or other safety signals if the signals above are less than 800
m away from railroad crossings;
For other cases, place stop signs on railway on the side of
railroad crossing guard posts, at least 3 m away from the edge of the road to
prevent trains from entering railroad crossings if railroad crossing barriers
have not been fully deployed;
b) Depending on the angle created by railway and road, place
either sign that reads “Nơi đường sắt giao vuông góc với đường bộ”
(Perpendicular road-railroad crossing) or sign that reads “Nơi đường sắt giao
không vuông góc với đường bộ” (Non-perpendicular road-railroad crossing) on the
road within the radius of railroad crossings leading up to the railroad
crossings;
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
2. In case of unattended railroad crossings, in addition t o
signs under Point b Clause 1 of this Article, the following signs shall be
required:
a) Sign that reads “Giao nhau với đường sắt có rào chắn”
(Crossing railroad with fences) for railroad crossings with automatic crossing
barriers or sign that reads “Giao nhau với đường sắt không có rào chắn”
(Crossing without fences) for railroad crossings without automatic crossing
barriers on road outside of the radius of railroad crossings leading to railroad
crossings;
b) Sign that reads “Dừng lại” (stop) on road in the radius
of railroad crossings leading up to the railroad crossings in case of railroad
crossings with signs.
3. Sign that reads “Kéo còi” (Whistle) shall be placed on
both sides of railway leading up to the railroad crossings.
4. Dimension, format, and placement of road and railway
signs shall conform to National Technical Regulations on road signs and
National Technical Regulations on railway signs.
Article 19. Electric signal lights, bells, loudspeakers
1. Signal lights, bells, or loudspeakers (except for cases
where a road intersecting a road adjacent to railway) shall be placed before
railroad crossing barriers (or integrated with crossing posts) or at least 6 m
away from the outermost rail. In all cases, signal lights shall be located in
unobstructed areas. b
2. Requirements of signals:
a) Signal lights shall consist of two red lights next to
each other which take turn blinking when turned on. If a train is approaching,
signal lights shall be turned on, people and vehicles shall be prohibited from
crossing. When the train has passed the railroad crossing and crossing barriers
have been fully lifted and signal lights have been turned off, traffic at the
railroad crossing shall return to normal. Signal lights shall be additionally
installed on gantries for four-lane roads or wider or in areas with obstructed
visibility;
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
c) Lighting intensity and angle: light and lighting angle of
signal lights shall be sufficient to allow road vehicle operators to see the
signal from at least 100 m; red light emitted by signal lights shall not be
directed towards the railway.
3. Requirements of electric bells or loudspeakers:
a) Bells or loudspeakers shall sound when trains approach
railroad crossings for at least 60 seconds in case of automatic signals (for
railroad crossings fitted with automatic signals); 90 seconds in case of
automatic crossings and non-automatic crossing barriers; and 120 seconds in
case of non-automatic signals;
b) With respect to attended railroad crossings, bells or
loudspeakers shall be turned off when crossing barriers are fully deployed;
c) When bells and loudspeakers sound, volume measured at 15
m away, 1,2 m high from the ground shall range from 90 dB to 115 dB enable
vehicle operators to listen clearly.
4. Layout maps of signal lights and electric bells or
loudspeakers shall conform to Appendix IV hereof.
Article 20. Train stop signaling posts
1. Location of train stop signaling posts on railway:
a) Train stop signaling posts shall be from 100 m to 500 m
away from railroad crossings (from road shoulder on the same side). If there
are multiple attended railroad crossings nearby and distance between two
railroad crossings is less than 500 m; train stop signaling posts shall be
located on both ends of an area where the railroad crossings are located;
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
2. Minimum visibility of train stop signals shall be 800 m.
In case of geographical constraints, minimum visibility of railroad crossing
signals posts shall be 400 m.
3. Operation of railroad crossing signals:
a) Train stop signals shall be red in color and, when turned
on, shall require trains to stop;
b) If train stop signals is not turned on, trains operate
normally. In case of obstacles on railroad crossings that affect traffic
safety, railroad crossing attendants shall switch train stop signals to red;
c) Attended railroad crossings fitted with automatic rail
closing devices shall be required to include equipment that allows railroad
crossing attendants to promptly change the nearest train stop signals to red in
case of obstruction to traffic safety at railroad crossings.
Article 21. Equipment of railroad crossing guard posts
1. Railroad crossing guard posts shall be required to
include equipment below:
a) Telephone for contact with standby station personnel;
b) Equipment for controlling road signals;
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
d) Equipment for automatically informing railroad crossing
attendants of approaching trains;
dd) Equipment for controlling crossing barriers for cases
under Clause 3 Article 23 hereof;
e) Equipment capable of recording and storing communication
between station dispatchers and railroad crossing attendants;
g) Clocks.
2. Equipment under Clause 1 of this Article shall be ready
for normal operation.
3. In regard to railroad crossings of specialized railway
and railroad crossings whose useful life is less than 12 months, the placement
of equipment at railroad crossing guard posts shall be decided by competent
authority granting construction permission as well as railroad crossing
attendants are adequately informed of incoming trains in order to close
crossing barriers and prevent traffic accidents.
Article 22. Electric-powered signaling devices and safety
devices
1. In case of attended railroad crossings:
a) Electric-powered signaling devices and safety devices
shall be jointly controlled at railroad crossing guard posts;
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
2. In case of railroad crossings with automatic warning:
a) Road-side automatic signals shall provide clear and
timely signals regarding the status of crossing barriers in all weather
conditions;
b) If the devices are defective or otherwise unable to flash
in sequence, railway infrastructure enterprises or managers, users of railroad
crossings shall promptly repair and restore as soon as possible. At the same
time, safety of railroad crossings shall be achieved by warning signals
(flashing yellow lights) on road side and railroad crossing watchers;
c) Operation of devices at railroad crossings with automatic
warning schemes shall be monitored and supervised on a regular, continuous
basis via supervision system installed at railroad crossings with automatic
warning schemes.
Article 23. Attended crossing barriers
1. Roads on both sides of railway in the radius of railroad
crossings shall be fitted with crossing barriers to prevent road vehicles and
road users from entering the railway when trains are approaching. Crossing
barriers shall be at least 4 m away from the outermost rail. In case of
geographical constraints, crossing barriers shall be placed in a manner not
violating dimensional limits of railroad structures according to National
Technical Regulation on railroad operation.
2. Crossing barriers on each side of railway shall be moved
into railroad crossings from right to left when looking from outside of the
crossings. If there are multiple crossing barriers to be closed, the rightmost
barriers when looking from outside of the crossings shall be moved in first and
followed by other barriers. Crossing barriers shall block an entire road width
on each side once they have been fully deployed.
3. Crossing barriers can be fitted with electric motor to
assist crossing barrier attendants in closing, opening barriers;
manually-operated electric-powered boom barriers or automatic boom barriers are
also allowed.
4. Crossing barrier deployment time:
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
b) Crossing barriers shall not be closed more than 3 minutes
in case of class I, class II railroad crossings and not more than 5 minutes in
case of class III railroad crossings before trains approach railroad crossings;
except railroad crossings whose crossing barriers are in normally closed state.
Article 24. Crossing barrier with automatic warning
1. In case of roads on both sides of railway in the radius
of railroad crossing with automatic warning that are fitted with automatic
crossing barriers, the automatic crossing barriers shall be at least 4 m away
from the outermost rail. In case of geographical constraints, crossing barriers
shall be placed in a manner not violating dimensional limits of railroad structures
according to National Technical Regulation on railroad operation.
2. Barriers shall cover at most 1/2 or 2/3 of the road width
as long as the remaining unobstructed road section is at least 3 m in width and
on the left of lane leading up to railroad crossings.
3. Automatic barrier mechanisms and devices shall operate in
the order below:
a) When a train approaches railroad crossings, red light
signal on road and red light on boom barrier shall be automatically turned on,
bells or loudspeaker shall automatically be activated; after 7 to 8 seconds,
boom barrier starts to be lowered;
b) When the train clears of railroad crossings, boom barrier
shall automatically lift, lights on boom barrier and road signal shall be
automatically turned off when boom barrier is fully open.
4. Deployment time: roads on both side of railway leading up
to railroad crossings shall be entirely closed at least 40 seconds before
trains reach the railroad crossings.
Article 25. Requirements of sign placement when roads are
adjacent to and branching into railway
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
a) Depending on angle created by the branching segment and
railroad crossings, place either a sign that reads “Nơi đường sắt giao vuông
góc với đường bộ” (Perpendicular road-railroad crossing) or a sign that reads
“Nơi đường sắt giao không vuông góc với đường bộ” (Non-perpendicular road-railroad
crossing) on the side two junctions adjacent to the junction branching to
railroad crossings;
b) Depending on safety measures of railroad crossings,
either a sign that reads “Giao nhau với đường sắt có rào chắn” (Crossing
railroad with fences) or a sign that reads “Giao nhau với đường sắt không có
rào chắn” (Crossing without fences) on the right side of roads adjacent to
railway. Signs shall be 40 m to 240 m away from the branching points.
2. If length of branching segment leading up to railway is
10 m to 75 m:
a) Depending on angle created by the branching segment and
railroad crossings, place either a sign that reads “Nơi đường sắt giao vuông
góc với đường bộ” (Perpendicular road-railroad crossing) or a sign that reads
“Nơi đường sắt giao không vuông góc với đường bộ” (Non-perpendicular
road-railroad crossing) on the right side of branching section and 10 m away
from the outermost rail;
b) Depending on safety measures of railroad crossings, place
either a sign that reads “Giao nhau với đường sắt có rào chắn” (Crossing
railroad with fences) or a sign that reads “Giao nhau với đường sắt không có
rào chắn” (Crossing without fences) on right side of roads adjacent to railway
and 10 m to 200 m away from branching points.
3. If length of branching segment leading up to railway is
longer than 75 m, place signs in accordance with Article 18 hereof.
4. Surface of signs mentioned under Clause 1 and Point b
Clause 2 of this Article shall be perpendicular to the direction of traffic on
road adjacent to railway and unobstructed.
5. Location of signs mentioned under Clause 1 and Clause 2
of this Article shall conform to Section C of Appendix II hereof.
Article 26. Road signal lights when road junctions are
branching into railroad crossings and less than 75 m away from railroad
crossings
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
1. Install signal lights to coordinate traffic entering
railroad crossings.
2. When road signal light in railroad crossings is turned
on, signal light on road adjacent to railway and branching into railroad
crossings shall display in a manner corresponding road signal lights at
railroad crossings; in this case, construction of waiting lane is recommended
on road adjacent to railway.
3. In order to display in accordance with Clause 1 and
Clause 2 of this Article, establish connection between road traffic light and
road traffic light at railroad crossings.
Article 27. Sign placement on railroad crossings when road
intersecting with both railway and road adjacent to railway
If a road intersecting with both railway and road adjacent
to the railway, sign placement on the road shall conform to regulations below:
1. If a road enters railroad crossings without first
intersecting with another road, conform to Article 18 hereof.
2. If a roads first intersects with another road then enters
railroad crossings, conform to Article 25 hereof.
Article 28. Instruments, equipment, and attendants of railroad
crossings
1. Railroad crossings shall be adequately equipped with
instruments and equipment as per the law.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
3. Assignment of personnel at railroad crossings shall
conform to labor laws, adhere to management activities, ensure prompt and
accurate closing and opening of crossing barrier, and ensure traffic safety at
railroad crossings.
Article 29. Railroad crossing dossiers
Railroad crossing dossiers consist of:
1. Dossiers of each railroad crossing:
a) As-built dossiers of railroad crossing and other
structures whose construction has been permitted in the radius of railroad
crossing according to construction laws. In case of inadequate as-built
dossiers, entities under Article 58, Article 59, and Article 60 hereof shall be
responsible for producing dossiers on current railroad crossing conditions;
b) Construction permit of railroad crossings, decisions
bringing railroad crossings into use;
c) Schedule on technical status and background information
of railroad crossings;
d) Documents on traffic safety corridors at railroad
crossings according to regulations on management and protection of railroad
infrastructures, including structures and obstacles obstructing vision;
dd) Railroad crossing logs for monitoring operation of:
Railroad crossings, railroad crossing equipment, and signaling system;
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
2. Schedules on statistics of railroad crossings of each
railway line in commune, district, province are specified under Appendix V
hereof and posted on website of Vietnam Railway Administration, enterprises
providing railroad infrastructures, owners of railroad crossings.
Article 30. Railroad crossing management
1. Produce, update, store railroad crossing dossiers in
accordance with Article 29 hereof; update railroad crossing dossiers on
database of information system.
2. Examine and maintain operation of railroad crossings in
order to maintain traffic safety according to documents approved by competent
authority.
3. Organize and implement railroad crossing safety measures
in accordance with this Circular.
4. Manage and protect railroad crossing property, traffic
safety corridor at railroad crossings as per the law.
5. In regard to railroad crossings whose construction permit
or decision bringing railroad crossings into use is missing:
a) In case of railroad crossings on national railway: Owners
of specialized railroad crossings shall produce documents on current conditions
of railroad crossings and send to Vietnam Railway Administration for eligibility
for further operation of railroad crossings;
b) In case of public railroad crossings on specialized
railway related to national highway: Organizations managing, using, operating
railroad crossings shall produce documents on current conditions of railroad
crossings and send to Directorate for Road of Vietnam for eligibility for
further operation of railroad crossings;
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
Article 31. Road traffic in the radius of railroad crossings
Road users shall, upon crossing railroad crossings, comply
with road and railway traffic laws and:
1. Yield to railway vehicles.
2. Comply with signals of railroad crossing attendants and
signs in the radius of railroad crossings.
3. Stop to the right of direction of traffic in front of
stop marking (including priority vehicles) when stop signal is sent (in form of
flashing red lights), red flags, red signs, horns, bells, or loudspeakers are
ringing, crossing barriers are being moved or are already closed, railroad
crossing attendants give stop orders.
4. Unauthorized individuals are not allowed to open crossing
barriers that have been closed.
5. In regard to railroad crossings with signs, road users
shall stop in front of stop lines, listen to train horns, pay attention to any
incoming train from both sides and only proceed if they are certain that there
are no incoming trains and be liable if they cause accidents.
Article 32. Stopping, parking in the radius of railroad
crossings
1. Do not turn around, stop, or park between two “Dừng lại”
(Stop) lines at railroad crossings.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
If the nearest point of vehicles or cargos is less than 1,75
m away from the outermost point of the rail, vehicle operators shall take
measures to inform the train to stop before hitting the obstacles and
immediately bring vehicles and cargos outside of 1,75 m radius from the
outermost point of the rail. Measures for stopping trains before hitting the obstacles
are specified under Appendix VI hereof.
Article 33. Operation of overloaded vehicles, oversized
vehicles, and tracked vehicles in railroad crossings
1. Vehicle operators shall comply with road and railway
traffic laws and eligibility for vehicle operation within vehicle operation
permit issued by competent authority.
2. Prior to moving past railroad crossings, vehicle
operators shall take measures to ensure safety of railroad crossings, railway
traffic safety and inform railroad crossing attendants for guidance and
assistance.
Article 34. People herding livestock in railroad crossings
1. Prior to herding livestock across attended railroad
crossings, herders shall contact railroad crossings attendants to learn train
schedule and receive instructions.
2. Prior to heading livestock across unattended railroad
crossings, herders shall observe for railway vehicles approaching railroad
crossings and only herd livestock across railroad crossings if safety is met.
3. Herders shall herd their livestock on the right side of
the road. Herders shall be entirely liable if accident occurs as a result of
failure to comply with traffic rules at railroad crossings according to this
Circular.
Article 35 People operating trains in railroad crossings
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
Article 36. Stopping, parking trains within the radius of
railroad crossings
1. If trains must be stopped and/or parked on railroad
crossings, shunted, assembled, disassembled, train conductors or operators (if
trains are running on railway), station masters or station dispatchers (if
trains are in stations) shall take all measures to resolve traffic congestion.
2. If trains must be parked on railroad crossings, parking
duration shall not exceed 3 minutes in case of class I and class II railroad
crossings and 5 minutes in case of class III railroad crossings except for
railroad crossings according to regulations on resolving railway incidents,
accidents and analysis, statistic reports on railway incidents and accidents.
Article 37. Conditions for construction, renovation, and
upgrade of railroad crossings
1. Organizations requesting construction, renovation, and
upgrade of railroad crossings shall guarantee funding sources for renovation
and upgrade of railroad crossings as per the law.
2. Competent authority entitled to deciding on railroad
crossing construction projects shall identify funding sources for management,
maintenance, and safety measures of railroad crossings.
3. With respect to limited-use railroad crossings, in
addition to conditions under Clause 1 and Clause 2 of this Article,
construction, renovation, and upgrade of railroad crossings shall also require
that:
a) Use purpose of railroad crossings conforms to temporary traffic
arrangement approved by competent authority;
b) Use period of railroad crossings does not exceed 24
months;
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
4. With respect to public railroad crossings on national
railroad crossings with long-term useful life invested using state funding,
when construction of railroad crossings is finished, project developers shall
transfer railroad crossings to the Ministry of Transport for management,
maintenance, and operation as per the law. With respect to railroad crossings
built using other funding sources, organizations requesting construction of
railroad crossings shall guarantee funding for management, maintenance, and
safety measures of railroad crossings.
Article 38. Conditions for railroad crossing removal
1. Railroad crossings shall be removed if any of the two
conditions below is met:
a) Useful life of railroad under permit issued by competent
authority expires;
b) Railroad crossing is no longer used.
2. When removing public railroad crossings with long-term
useful life, organizations requesting removal of railroad crossings shall
produce alternative traffic arrangement.
3. Funding sources for railroad crossing removal:
a) Organizations requesting removal of railroad crossings
shall guarantee funding sources for removal and return railway segment in the
radius of railroad crossings to original conditions as per the law;
b) Competent authority deciding on removal of railroad
crossings shall identify funding sources for removal of railroad crossings.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
REGULATIONS ON CONSTRUCTION PERMIT ISSUANCE, RENEWAL,
AND REVOCATION, RAILROAD CROSSING REMOVAL
Article 39. Structures eligible for permit
1. Structures under Point b Clause 2 Article 12 of the Law
on Railway and regulations on management, protection of railway
infrastructures, including:
a) Structures serving national defense and security;
b) Traffic structures: bridges, overpasses, tunnels;
c) Irrigation structures: sewers, embankments; water
transport and distribution system;
d) Energy structures: electric poles, power lines;
dd) Technical infrastructures: water supply and drainage
pipes, telecommunication pipes, gasoline pipes, oil pipes, gas pipes, energy
pipes, chemical pipes.
2. Structures serving railroad crossings, renovation, and
upgrade of railroad crossings according to Article 37 hereof.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
4. New construction permit shall not be issued for railroad
crossings with signs on national railway.
Article 40. Rules for issuing, renewing construction permit
1. Construction permit shall only be issued to structures
under Article 39 hereof.
2. Structures to which construction permit is issued shall:
a) conform to planning approved by competent authority or conform
to agreement of People’s Committees of districts or higher regarding structure
location;
b) ensure structure scale and design dossiers approved by
competent authority;
c) adhere to technical regulations and standards applied;
d) ensure structure safety, railway traffic safety,
environmental protection, and fire safety.
3. Construction duration of structures to which construction
permit is issued shall adhere to overall schedule of projects approved by
competent authority.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
5. Structures to which construction permit is issued shall
promptly be relocated at request of competent authority.
6. Construction permit shall only be renewed if it has not
expired.
7. Structures exempt from construction permit requirement:
a) Structures serving renovation, upgrade, and repair of
railroad crossings, railway structures on national railway where execution plan
is approved by competent authority;
b) Structures serving repair of railroad crossings where
design plan does not alter railroad crossing class, safety devices of railroad
crossings, and width of road surface in railroad crossings.
Article 41. Entitlement to issuing, renewing, revoking,
cancelling permit to build, renovate, upgrade railroad crossings; deciding
removal of railroad crossings
1. The Vietnam Railway Administration shall:
a) issue, renew, revoke, cancel permit to build, renovate,
upgrade railroad crossings on national railway;
b) decide on removal of railroad crossings on national
railway.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
a) issue, renew, revoke, cancel permit to build, renovate,
upgrade railroad crossings on specialized railway related to national highway;
d) decide on removal of railroad crossings on specialized
railway related to national highway.
3. Agencies decentralized, authorized by People’s Committees
of provinces shall:
a) issue, renew, revoke, cancel permit to build, renovate,
upgrade railroad crossings on specialized railway related to provincial roads,
district roads, commune roads, local roads, and specialized road under their
management;
b) decide on removal of railroad crossings on specialized
railway related to provincial roads, district roads, commune roads, local
roads, and specialized roads under their management.
Article 42. Application for permit to build, renovate,
upgrade railroad crossings
Application for permit to build, renovate, upgrade railroad
crossings consists of:
1. Written application under Appendix VII hereof.
2. Original copies or certified true copies or copies and
original copies or legitimate electronic copies (when administrative procedures
are adopted electronically) of:
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
b) Decision approving technical design or construction
drawing design of railroad crossings;
c) Approved technical design or construction drawing design
of railroad crossings;
d) Railroad crossing construction plan and traffic safety
measures during construction approved by competent authority or accepted by
project developers.
Article 43. Procedures for issuing permit to build,
renovate, and upgrade railroad crossings
1. Project developers, managers and users of railroad
crossings that wish to build, renovate, or upgrade railroad crossings shall
submit registration directly or via post service or electronically to competent
authority under Article 41 hereof.
2. In case of direct submission, competent authority under
Article 41 hereof shall respond regarding composition of registration documents
in the same working day.
3. In case of submission via post service or electronic
medium, if registration documents are inadequate, competent authority under
Article 41 hereof shall provide guidelines on completion of registration
documents within 2 working days.
4. Within 2 working days from the date on which adequate
registration documents are received, competent authority shall send the
registration documents to relevant entities to consult:
a) Railway infrastructure enterprises and road authority (if
needed) for railroad crossings on national railway;
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
5. Within 5 working days from the date on which competent
authority send application for remarks, requested agencies and organizations
shall respond in writing. If requested agencies and organizations fail to
respond within the time limit mentioned above, they shall be considered to
approve registration documents and shall be held liable for failure to respond
in a timely manner.
6. Document processing time limit: 10 working days from the
date on which adequate documents are received.
7. Permit to build, renovate, and upgrade railroad crossings
shall conform to form under Appendix VIII hereof. If registration is rejected,
a written response stating reason for rejection shall be required.
8. In case of submission on electronic medium, project
developers, managers and users of railroad crossings that wish to build,
renovate, and upgrade railroad crossings shall produce registration documents
containing photocopies of documents under Article 42 hereof and follow
instructions on https://dichvucong.mt.gov.vn.
Article 44. Application for removal of railroad crossings
Application for removal of railroad crossings consists of:
1. Written application under Appendix IX hereof.
2. Original copies or certified true copies or copies and
original copies or legitimate electronic copies (when administrative procedures
are adopted electronically) of:
a) Commissioning record of structures, work items for
overpass, tunnels, or other railroad crossings acting as alternatives for
railroad crossings requested for removal; or
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
Article 45. Procedures for removing railroad crossings
1. Project developers, managers and users of railroad
crossings that wish to remove railroad crossings shall submit registration
directly or via post service or electronically to competent authority under
Article 41 hereof.
2. In case of direct submission, competent authority under
Article 41 hereof shall respond regarding composition of registration documents
in the same working day.
3. In case of submission via post service or electronic
medium, if registration documents are inadequate, competent authority under
Article 41 hereof shall provide guidelines on completion of registration
documents within 2 working days.
4. Within 2 working days from the date on which adequate
registration documents are received, competent authority shall send the
registration documents to relevant entities to consult:
a) Railway infrastructure enterprises and road authority (if
needed) for railroad crossings on national railway;
b) Owners of specialized railway and road authority (if
needed) for railroad crossings on specialized railway.
5. Within the first 5 working days from the date on which
competent authority sends application for remarks, requested agencies and
organizations shall respond in writing If requested agencies and organizations
fail to respond within the time limit mentioned above, they shall be considered
to approve registration documents and shall be held liable for failure to
respond in a timely manner.
6. Document processing time limit: 07 working days from the
date on which adequate documents are received.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
8. In case of submission on electronic medium, project
developers, managers and users of railroad crossings that wish to remove
railroad crossings shall produce registration documents containing photocopies
of documents under Article 44 hereof and follow instructions on https://dichvucong.mt.gov.vn.
Article 46. Application for renewal of permit to build,
renovate, upgrade railroad crossings
Application for renewal of permit to build, renovate,
upgrade railroad crossings consists of:
1. Written application using form under Appendix XI hereof.
2. Original copies or certified true copies or copies and
original copies or legitimate electronic copies (when administrative procedures
are adopted electronically) of:
a) General project schedule approved by competent authority;
b) Documents proving reason for renewal such as:
Record of transfer of railroad crossing construction,
renovation, upgrade premise for difficulties regarding construction premise; or
Damage verification records between project developers and
construction contractors in case natural disasters, emergencies affect railroad
crossing construction, renovation, upgrade schedule; or
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
Article 47. Procedures for renewing permit to build,
renovate, and upgrade railroad crossings
1. Project developers, managers and users of railroad
crossings that wish to renew permit to build, renovate, or upgrade railroad
crossings shall submit registration directly or via post service or
electronically to competent authority under Article 41 hereof.
2. In case of direct submission, competent authority under
Article 41 hereof shall respond regarding composition of registration documents
in the same working day.
3. In case of submission via post service or electronic
medium, if registration documents are inadequate, competent authority under
Article 41 hereof shall provide guidelines on completion of registration
documents within 2 working days.
4. Document processing time limit: 03 working days from the
date on which adequate documents are received.
5. Decision on renewal of permit of build railroad crossings
shall use form under Appendix XII hereof. If this decision is not issued, a
written response state the reason shall be required.
6. In case of submission on electronic medium, project
developers, managers and users of railroad crossings that wish to renew permit
to build, renovate, and upgrade railroad crossings shall produce registration
documents containing photocopies of documents under Article 46 hereof and
following instructions on https://dichvucong.mt.gov.vn.
7. Each permit shall only be renewed once and for no more
than 12 months; renewed permit shall not last longer than project execution
schedule approved by competent authority.
Article 48. Entitlement to issuing, renewing, revoking,
cancelling of construction permit for essential structures on land for railway
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
2. Agencies decentralized, authorized by People’s Committees
of provinces shall issue, renew, revoke, and cancel permit to build essential
structures on land for urban railway.
Article 49. Application for permit to build essential
structures on land for railway
Application for permit to build essential structures on land
for railway consists of:
1. Application form under Appendix XIII hereof.
2. Original copies or certified true copies or copies and
original copies or legitimate electronic copies (when administrative procedures
are adopted electronically) of:
a) Decision approving project or document assigning tasks to
project developers;
b) Decision approving technical design or technical drawing
design; photos of current condition (for renovating, upgrading structures);
c) Approved technical design or construction drawing design;
d) Legislative documents of competent authority deeming that
the structures cannot be placed outside of land for railway: Decision approving
planning or agreement of People’s Committees of districts or higher relating to
construction of structures on land for railway;
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
e) Construction plans, traffic safety measures, structure
safety measures.
Article 50. Procedures for issuing permit to build essential
structures on land for railway
1. Project developers that wish to build on land for railway
shall produce written application and submit directly or via post service or
electronically to competent authority under Article 48 hereof.
2. In case of direct submission, competent authority under
Article 48 hereof shall respond regarding composition of registration documents
in the same working day.
3. In case of submission via post service or electronic
medium, if registration documents are inadequate, competent authority under
Article 48 hereof shall provide guidelines on completion of registration
documents within 2 working days.
4. Within 2 working days from the date on which adequate
registration documents are received, competent authority shall send the
registration documents to relevant entities to consult:
a) Railway infrastructure enterprises when building on land
for national railway;
b) Enterprises providing urban railway services and
specialized authority according to decentralization of People’s Committees of
provinces when building on land for urban railway.
5. Within 5 working days from the date on which competent
authority send application for remarks, requested agencies and organizations
shall respond in writing. If requested agencies and organizations fail to
respond within the time limit mentioned above, they shall be considered to
approve registration documents and shall be held liable for failure to respond
in a timely manner.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
7. Permit to build shall use form under Appendix XIV hereof.
If this decision is not issued, a written response state the reason shall be
required.
8. In case of submission on electronic medium, project
developers that wish to build essential structures on land for railway shall
produce registration documents containing photocopies of documents under
Article 49 hereof and follow instructions on https://dichvucong.mt.gov.vn.
9. Owners of specialized railroad shall decide on procedures
for issuing permit to build on land for specialized railroad.
Article 51. Application for renewal of permit to build
essential structures on land for railway
Application for renewal of permit to build essential
structures on land for railway consists of:
1. Written application using form under Appendix XV hereof.
2. Original copies or certified true copies or copies and
original copies or legitimate electronic copies (when administrative procedures
are adopted electronically) of:
a) General project schedule approved by competent authority;
b) Documents proving reason for renewal such as:
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
Records of damage between project developers and
construction contractors in case natural disasters or emergencies affect
construction schedule;
Decision on revision to project investment guidelines or
decision on revision to construction investment program, project in case
project revision affects construction schedule.
Article 52. Procedures for renewing permit to build
essential structures in land for railway
1. If construction schedule under permit to build expires
before the structure is completely built, project developers shall produce
written application and submit directly or via post service or electronically
to competent authority under Article 48 hereof.
2. In case of direct submission, competent authority under
Article 48 hereof shall respond regarding composition of registration documents
in the same working day.
3. In case of submission via post service or electronic
medium, if registration documents are inadequate, competent authority under
Article 48 hereof shall provide guidelines on completion of registration
documents within 2 working days.
4. Document processing time limit: 03 working days from the
date on which adequate documents are received.
5. Decision on renewal of permit to build shall use form
under Appendix XVI hereof. If this decision is not issued, a written response
state the reason shall be required.
6. In case of submission on electronic medium, project
developers that wish to renew permit to build essential structures on land for
railway shall produce registration documents containing photocopies of
documents under Article 51 hereof and follow instructions on
https://dichvucong.mt.gov.vn.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
8. Owners of specialized railroad shall decide on procedures
for issuing permit to build on land for specialized railroad.
Article 53. Revocation and cancellation of permit to build,
renovate, upgrade railroad crossings and permit to build on land for railway
1. Cases where permit to build, renovate, upgrade railroad
crossings; permit to build on land for railway (hereinafter collectively
referred to as “permit”) are revoked:
a) The permit is not issued in a law-compliant manner;
b) Project developers fail to organize construction or
execute construction in a manner compliant with their permit. Project
developers then fail to rectify the violations according to request of
competent authority in a period equivalent to 1/3 of construction schedule in
the permit from the date on which competent authority discovers the violations;
c) Project developers violate regulations on management,
protection of railway traffic infrastructure, railway traffic safety, and
environmental protection at construction sites;
d) Project developers fail to initiate construction process
within 12 months from the date on which they obtain permit.
2. After 10 working days from the date on which decision on
permit revocation is issued, competent authority under Article 41 and Article
48 hereof shall promulgate decision declaring cancellation of the permit while
notifying agencies, entities related to permit compliance.
Chapter IV
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
Article 54. Responsibilities of Vietnam Railway
Administration
1. Exercise responsibilities of railway authority in
managing railroad crossings on national railway and construction on land for
national railway.
2. Organize inspection, supervision of management,
maintenance, and protection of railroad crossings implemented by railway
infrastructure enterprises for railroad crossings on national railway according
to this Circular.
Article 55. Responsibilities of Directorate for Road of
Vietnam
In regard to public railroad crossings on specialized
railway related to national highway:
1. Manage and maintain operation of road structures outside
of radius of railroad crossings; visibility of road vehicle operators.
2. Organize inspection, supervision of management,
maintenance, and protection of railroad crossings implemented by owners of
specialized railway for railroad crossings on national railway according to
this Circular.
Article 56. Responsibilities of local road authority
1. Comply with decentralization and authorization of
People’s Committees of provinces in regard to public railroad crossings on
specialized railway related to provincial roads, district roads, commune roads,
urban roads under their management in:
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
b) Cooperate with railway infrastructure enterprises or
managers, users of specialized railway, local governments in removing railroad
crossings that lack building permit;
2. Manage, maintain operation of road structures outside of
railroad crossing radius; visibility of road vehicle operators for public
railroad crossings related to provincial roads, district roads, commune roads,
and local roads under their management.
Article 57. Responsibilities of People’s Committees of all
levels
1. Educate the general public; prevent, deter, and promptly
take actions against violations of railway traffic safety corridor.
2. Manage land within railway traffic safety corridors and
traffic safety corridors at railroad crossings according to railway laws.
3. Cooperate with road authority, railway infrastructure
enterprises, managers and users of railroad crossings in:
a) inspecting railroad crossings in order to request
competent authority to renovate, upgrade, or remove railroad crossings in
accordance with this Circular;
b) proposing safety measures for public railroad crossings
conforming to this Circular.
4. Take charge and cooperate with Vietnam Railway
Administration, Directorate for Road of Vietnam, railway infrastructure
enterprises, managers, users of railroad crossings, local road authority in
clearing traffic safety corridors at railroad crossings.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
1. Within 5 working days from the date on which
commissioning of public railroad crossings, specialized railroad crossings on
national railway is conducted, national railway infrastructure enterprises shall
receive the structures and introduce railroad crossings into use.
2. Manage, maintain, and retain operation of public railroad
crossings on national railway in accordance with Clause 1, Clause 2, Clause 3,
and Clause 4 Article 30 hereof.
3. Allocate railroad crossing attendants for public railroad
on national railway according to approved national railway infrastructure
maintenance plan.
4. On an annual basis, take charge and cooperate with road
authority and local government in inspecting, producing repair plan for public
railroad crossings on national railway and request competent authority to
renovate, improve, upgrade railroad crossings or alter safety devices of public
railroad crossings on national railway in accordance with this Circular.
5. Regularly inspect, detect, promptly propose and cooperate
with local government in clearing traffic safety corridors at railroad
crossings on national railway.
6. Take charge and cooperate with local government in
improving traffic safety at dangerous public railroad crossings on national
railway.
7. Produce dossiers on public railroad crossings on national
railway in accordance with Article 29 hereof.
8. Request project developers, constructing entities of
railroad crossings, essential structures built on land for national railway to
comply with their permit, structure safety measures, traffic safety measures,
and environmental protection during construction process. If there are safety
risks found during construction process, request project developers to
temporarily suspend construction process to rectify; report to licensing
authority as per the law.
9. Transfer construction premise, participate in
commissioning of railroad crossing construction, construction on land for
national railway, receive as-built dossiers for management and maintenance as
per the law.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
11. Take charge and cooperate with managers, users of
railroad crossings and local government in barricading, removing railroad
crossings, and returning railway infrastructures after decision on railroad
crossing removal is issued.
12. Comply with reporting regulations:
a) Report name: Statistical report on railroad crossings and
construction on land for railway;
b) Reports shall include: The use, operation, protection of
railroad crossings, dossiers on railroad crossing under this Circular for
railroad crossings on national railway; construction on land for national
railway; propositions and recommendations (if any).
c) Reporting entities: Railway infrastructure enterprises;
d) Report recipient: Vietnam Railway Administration;
dd) Report submission and receipt method: physical documents
and connected document management system of Vietnam Railway Administration;
e) Report submission deadline: before March 15 of each year;
g) Reporting frequency: once per year;
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
i) Report form under Appendix V hereof.
Article 59. Responsibilities of managers, users of
specialized railroad crossings
1. Manage, maintain, organize safety devices, and retain
technical conditions of railroad crossings under their management throughout
use process under this Circular.
2. Assign attendants for railroad crossings under their
management and use.
3. Promptly implement repair solutions in order to ensure
safety for railroad crossings under their management and use, and traffic
safety when any damage is found.
4. Produce dossiers on railroad crossings under their management
and use in accordance with Article 29 hereof.
5. If managers and users of specialized railroad crossings
fail to adequately comply with Clause 1, Clause 2, Clause 3, or Clause 4 of
this Article, railway infrastructure enterprises (for railroad crossings on
national railway) or owners of specialized railway (for railroad crossings on
specialized railway) shall decide on temporary suspension of railroad crossing
operation. In this case, managers and users of specialized railroad crossings
shall compensate for damage caused by their fault.
Article 60. Responsibilities of owners of specialized
railway
1. With respect to public railroad crossings on public
railway:
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
b) Assign railroad crossing attendants;
c) Give feedback and assume legal responsibility for
feedback regarding construction, renovation, and upgrade of railroad crossings;
d) issue decision bringing railroad crossings into use
within 5 working days from the date on which railroad crossing commissioning is
complete;
dd) produce dossiers on railroad crossings in accordance
with Article 29 hereof.
2. Decide on construction, renovation, and upgrade of
specialized railroad crossings on specialized railway; construction on land for
specialized railway.
Article 61. Responsibility of project developers of railroad
crossings, essential structures built on land for railway
1. Prior to approving construction investment projects,
project developers shall consult competent authority under Article 41 and
Article 48 hereof and owners of specialized railway regarding construction
location and scale if construction takes place on land for specialized railway.
2. Prior to commencing construction, project developers
shall consult organizations below regarding construction plan, duration of
barricade for construction purposes, traffic safety measures:
a) Railway infrastructure enterprises for structures related
to national railway structures and land for national railway;
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
c) Owners of specialized railway for structures related to
specialized railway structures and land for specialized railway;
d) Relevant road authority.
3. Adopt procedures for receiving transferred construction
premise prior to commencing construction.
4. Upon completion of construction process, deliver the
sites and as-built dossiers to organizations under Clause 2 of this Article.
5. Maintain stable technical conditions and guarantee
funding sources for management, maintenance of structure sections located on
land for railway.
6. Ensure structure safety, railway traffic safety,
environmental protection throughout construction process; performance
maintenance throughout operation; develop timely reinforcement plans to
maintain structure safety, railway traffic safety upon discovering or receiving
information about structure damage.
7. Relocate or renovate structures without seeking
compensation upon being requested by competent authority; demolish structures
upon expiry (for structures with expiry under permit to build).
8. Compensate for damage caused by their fault as per the
law.
Chapter V
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
Article 62. Entry into force
This Circular comes into force from December 1, 2023 and
replaces Circular No. 25/2018/TT-BGTVT dated May 14, 2018 and Circular No.
07/2022/TT-BGTVT dated May 31, 2022 of the Minister of Transport.
Article 63. Transition clauses
1. With respect to existing specialized railroad crossings
with signs on national railway, owners of specialized road shall gradually
upgrade safety devices of railroad crossings in order of priority in order to
improve traffic safety. If safety devices of railroad crossings have not been
improved, owners of specialized road shall organize guard duty in railroad
crossings that are susceptible to traffic accidents or at high risk of traffic
accidents.
2. With respect to existing railroad crossings that have not
met requirements under this Circular, during renovation and upgrade of such
railroad crossings, project developers shall gradually improve angle created by
road and railway, road profile, road slope, add more railroad crossing safety
devices, expand railroad crossing guard posts. Prior to renovation and upgrade
of railroad crossings, traffic safety measures shall be implemented to protect
people and vehicles traversing railroad crossings.
3. With respect to existing railroad crossings with
automatic warning and without automatic barrier, install automatic barriers to
improve traffic safety.
4. With respect to existing railroad crossings utilizing
manually-operated barriers, replace with electric-powered barriers or
electric-powered and manually-operated barriers, boom barriers or automatic
barriers in order to improve safety quality at railroad crossings, increase
traffic safety, and reduce number of attendants required at railroad crossings.
Article 64. Responsibility for implementation
Chief of the Ministry Office, Chief of Ministry
Inspectorate, Directors, Director of Directorate for Road of Vietnam, Director
of Vietnam Railway Administration, Directors of Departments of Transport of
provinces and central-affiliated cities, heads of relevant agencies,
organizations, and individuals are responsible for the implementation of this
Circular./.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
PP. MINISTER
DEPUTY MINISTER
Nguyen Danh Huy
APPENDIX I
RAILROAD
CROSSING CLASSES
(Attached to Circular No. 29/2023/TT-BGTVT dated September 29 of 2023 of the Minister
of Transport)
Railroad
crossing class
With
either or both of following elements: design traffic flow rate, cross-product
Railroad
intersects
Cross-product
(A)
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
- Road of at least 3.000 in
vehicle flow rate
-
- Urban road
Greater
than 20.000
II
- Road of 200 to 3.000 in vehicle
flow rate
-
- District road or commune road of
less than 200 in vehicle flow rate
-
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
From
5.000 to 20.000
III
- Uncategorized road
Less
than 5.000
- Urban road
Note:
Cross-product is the product
obtained by multiplying the average daily number of trains and the average
daily number of vehicles:
A = Nt
x Nx
Where:
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
Nt: Average daily number
of trains travelling through the crossing, according to train schedule or
planning during road design.
Nx: Average daily number
of cars equivalent travelling through the crossing.
Where statistical data are used,
relevant road authority must issue their verification.
Where actual vehicle count is used,
vehicle counting shall be conducted within 6 months, once per month on the 5th,
the 6th, and the 7th of each month where vehicles are
counted from 5 a.m. to 9 p.m. on the first two days and from 12 a.m. of the
previous day to 12 a.m. of the following day on the final day. Average data
collected over 6 months shall then be consolidated. Vehicles can be counted
manually or automatically.
Factor for conversion from other
vehicle types to cars:
Conversion
factor from vehicle types to cars
Terrain
Type
of vehicle
Bicycle
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
Car
Double-axle
truck and bus below 25 seats
Tri-axle
truck or more and large bus
Towing
vehicle, towing bus
Plain
and hill
0,2
0,3
1,0
2,0
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
4,0
Mountain
0,2
0,3
1,0
2,5
3,0
5,0
Note:
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
- In respect of roads where lanes
dedicated to non-motorized vehicles are separate from other lanes, bicycle
count will not be converted.
APPENDIX II
SAFETY DEVICE
ARRANGEMENT AT RAILROAD CROSSING
(Attached to Circular No. 29/2023/TT-BGTVT dated September 29 of 2023 of the Minister
of Transport)
A. Guard measure at attended
railroad crossing (depicting one side of railroad crossing):

Note:
1. “Horn” sign.
2. Railroad crossing warning sign
post.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
4. Location of electric lights and
sirens.
5. Sign No. W.210 “Giao nhau với
đường sắt có rào chắn” (Railway crossing with barrier).
6. Traffic cone.
7. Stationary fences.
8. Crossing boom barrier:
Where road width ≥ 7,0m, it is
permissible to arrange 2 boom barriers on each side of the road leading to
railroad crossing, in which case closing of the boom barriers shall be
implemented accordingly to prevent road traffic from entering the crossing.
In difficult circumstances, railroad
crossing boom barriers shall be placed outside of dimensional limits of railway
structures.
9. Stop line (marking 7.1).
10. “Stop” sign unless stop signal
has been installed on roads in railroad crossing or railroad crossing is
located within range of signals for station entry, station exit, or signals of
shunting yards, block signals for railway with automatic rail closing device,
or other safety signals when signals above are less than 800 away from railroad
crossings.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
B. Guard measure at unattended
railroad crossing (depicting one side of railroad crossing):
1. Railroad crossing with automatic
warning and automatic boom barrier:

Note:
1. “Horn” sign.
2. Location of electric lights and
sirens.
3. Sign No. W.210 “Giao nhau với
đường sắt có rào chắn” (Railway crossing with barrier).
4. Traffic cones or fences with
guard rails instead of traffic cones.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
6. Speed humps.
7. Speed bumps (if any).
8. Automatic boom barrier (in
difficult circumstances, boom barriers shall be located outside of dimensional
limits of railway structures).
Illustration above depicts
arrangement of safety devices at railroad crossing with automatic warning and
automatic boom barrier on one side of the crossing; arrangement of safety
devices on the other side of the crossing shall be similar.
2. Railroad crossing with automatic
warning and without automatic boom barrier:

Note:
1. “Horn” sign.
2. Location of electric lights and
sirens.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
4. Traffic cones or fences with
guard rails instead of traffic cones.
5. Stop line (marking 7.1).
6. Speed humps.
7. Speed bumps.
Illustration above depicts
arrangement of safety devices at railroad crossing with automatic warning and
without automatic boom barrier on one side of the crossing; arrangement of
safety devices on the other side of the crossing shall be similar.
3. Railroad crossing with signs:

Note:
1. “Horn” sign.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
3. Sign No. W.211a “Giao nhau với
đường sắt không có rào chắn” (Railway crossing without barrier).
4. Traffic cones or fences with
guard rails instead of traffic cones.
5. Stop line (marking 7.1) combined
with “STOP” line.
6. Stop sign (Sign No. R.122) in
combination with supplementary sign that reads “Dừng lại quan sát trước khi qua
đường ngang” (Observe before crossing).
7. Speed humps.
8. Speed bumps.
Illustration above depicts
arrangement of safety devices at railroad crossing with signs on one side of
the crossing; arrangement of safety devices on the other side of the crossing
shall be similar.
C. Sign location in case of parallel
railroad crossing (depicting one side of the crossing)
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.

Note:
1. Sign No. W242a,b “Nơi đường sắt
giao vuông góc với đường bộ” (Perpendicular railway crossing) or Sign No.
W243a,b,c “Nơi đường sắt giao không vuông góc với đường bộ” (Non-perpendicular
railway crossing).
2. Sign No. W.210: “Giao nhau với
đường sắt có rào chắn” (Railway crossing with barrier) in respect of railroad
crossing with attendants or railroad crossing with automatic warning, with
automatic boom barrier; sign No. W.211a: “Giao nhau với đường sắt không có rào
chắn” (Railway crossing without barrier) in respect of railroad crossing with
automatic warning, without automatic boom barrier or railroad crossing with
signs.
3. Warnings and signals of railroad
crossing are not depicted in the illustration above but are implemented
depending on safety device arrangement under Section A, Section B of this
Appendix.
2. 10 m to 50 m in length from junction
to railway:

Note:
1. Sign No. W242a,b “Nơi đường sắt
giao vuông góc với đường bộ” (Perpendicular railway crossing) or Sign No.
W243a,b,c “Nơi đường sắt giao không vuông góc với đường bộ” (Non-perpendicular
railway crossing).
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
3. Warnings and signals of railroad
crossing are not depicted in the illustration above but are implemented
depending on safety device arrangement under Section A, Section B of this
Appendix.
APPENDIX III
PLACEMENT
OF SIDE ROAD
(Attached to Circular No. 29/2023/TT-BGTVT dated September 29 of 2023 of the Minister of Transport)

Note:
- Width of side road is 3,5 m or 3 m
in case of difficult circumstances.
- Where the side road cannot be
implemented as a stand-alone road, the side road shall be located on reinforced
shoulder if road shoulder is of sufficient width. Where width of reinforced
shoulder is not sufficient to accommodate reinforced shoulder, reinforced
shoulder shall be expanded so that width of reinforced shoulder achieves 3,5 m
in width and width of earthened shoulder achieves 0,5 m in width. (on this
section, bicycles and non-motorized vehicles are allowed on the side road in
addition to motor vehicles).
- Transition segment to the side
road shall be 35 m away from the start of the side road and expands gradually
at a ratio of 1:10 (with the length of the expansion section is 70 m).
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
APPENDIX
IV
DIAGRAM
OF LIGHT SIGNALS AND ELECTRIC BELLS OR LOUDSPEAKERS
(Attached to Circular No. 29/2023/TT-BGTVT dated September 29 of 2023 of the Minister
of Transport)
A. Attended railroad crossing:
1. Where boom barrier is not used

Note:
1. Concrete foundation.
2. Base of post.
3. Body of post.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
5. Two red light apparatuses.
6. “Perpendicular railway crossing”
sign or “Non-perpendicular railway crossing” sign.
7. Bell housing or loudspeaker
housing.
(Where two signalling elements are
installed on opposite sides of a post corresponding to directions of the road
leading to railroad crossing, these elements shall be connected to each other).
2. Where boom barrier is used

Note:
-The foundation, base, body, and
elements below shall be similar to when boom barrier is not used.
- Signalling elements on boom
barriers shall be as described below.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
B. Unattended railroad crossing
1. Where boom barrier is not used

Note:
1. Concrete foundation.
2. Base of post.
3. Body of post.
4. “Stop and observe before
crossing” sign.
5. Display apparatuses for two red
lights and one yellow light.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
7. Bell housing or loudspeaker
housing.
(Where two signalling elements are
installed on opposite sides of a post corresponding to directions of the road
leading to railroad crossing, these elements shall be connected to each other).
2. Where boom barrier is used

Note:
-The foundation, base, body, and
elements below shall be similar to when boom barrier is not used.
- Signalling elements on boom
barriers shall be as described below.
APPENDIX V
LIST OF
RAILROAD CROSS
(Attached to Circular No. 29/2023/TT-BGTVT dated September 29 of 2023 of the Minister
of Transport)
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
(Until
…… (month) of …… (year))
No.
Railway
line
Number
of railroad crossings
Number
of railroad crossings with traffic safety risks where safety measures are put
in place
Note
Attended
Automatic
warning
Sign
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
By
railway infrastructure trading enterprise
Boom
barrier
Sliding
barrier
With
boom barrier
Without
boom barrier
(1)
(2)
(3)
(4)
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
(6)
(7)
(8)
(9)
(10)
I
In …………….. Province or City
1
Railway line
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
2
Railway line
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
Sum:
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
II
In …………….. Province or City
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
Railway line
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
…
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
Sum:
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
Total:
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
Compiler
(Signature and full name)
LEGITIMATE REPRESENTATIVE OF
RAILWAY INFRASTRUCTURE TRADING ENTERPRISE
(Signature,
full name, seal)
B. Crossing management number of
each railway line
1. Railway line: ……………………………
(By ……… (month) of ……… (year))
No.
Name
of railroad crossing
Railway
kilometric point at crossing
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
Location
Elements of railroad
crossing
Elements of road at
railroad crossing
Sight distance at
crossing (m)
Decision
on crossing establishment
Useful
life of crossing
Annual
number of accidents at crossing
Operation
of barrier equipment at crossing
State
of crossing dossiers
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
Province
(City)
District
Commune
(Ward)
Railroad
crossing class
Angle
crossing (degree)
Railroad
radius Rds; road radius Rdb at crossing (m)
Service
nature of crossing
Safety
devices at crossing
Warning
schemes at crossing
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
Road
surface structure inside railway
Road
surface structure from outermost rail to the end of tapered section
Road
surface structure of remaining section
Width
of road surface (m)
Road
gradient within vicinity of crossing (%)
Railway
Road
Even
direction
Odd
direction
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
Rightward
of railway
Right
side
Left
side
Right
side
Left
side
(1)
(2)
(3)
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
(15)
(16)
(17)
(18)
(19)
(20)
(21)
(22)
(23)
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
(25)
(26)
(27)
(28)
(29)
(30)
1
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
2
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
3
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
Compiler
(Signature and full name)
LEGITIMATE REPRESENTATIVE OF
RAILWAY INFRASTRUCTURE TRADING ENTERPRISE
(Signature,
full name, and seal)
Instructions
on how to fill the list:
(7) Railroad crossing class: Specify
whether railroad crossing is class I, class II, or class III.
(8) The angle at which railroad
intersects road (degree).
(9) Curve radius of railway at the
crossing (if any).
(10) Properties of the appendix:
Public use (CC) or specialized use (CD).
(11) Guard measure (attended, automatic
warning (CBTD), sign (BB)); sliding barrier (DC)/boom barrier (CC).
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
(13) Road intersecting railway; for
example (DT.265 either leads to Tu Ky Pagoda or Thanh Khe Commune).
(14) Road surface structure within
vicinity of railway “Reinforced concrete slab (TD) or asphalt slab (BTN)”.
(15) Road surface structure from the
outermost rail to each side consists of 1 m or 2 m of “Reinforced concrete slab
(TD) or asphalt concrete slab (BTN)”.
(16) Road surface structure of remaining
section of “asphalt (BTN) or concrete (BTXM)”.
(17) Width of roadway of road section
in vicinity of railroad crossing (m).
(18) Gradient of road where crossing
is located on curved railway (CT a%) or where gradient violates crossing
regulations (VP a%).
(26) Specify useful life of
crossing (long term, limited term. Where useful life of crossing has expired,
state reason).
(27) Specify number of accidents and
time of accidents at crossing.
(28) Specify operating conditions of
barrier equipment.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
(30) Specific recommendations and
propositions pertaining to: renovation, upgrade; replacement of crossing
barrier, and other issues of crossing.
C. Data pertaining to construction
on railway land
(From ……………… (date) to …………………
(date))
No.
Name
of structure
Location
License
number
Commencement
date
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
Investor
Note
In
license
In
practice
In
license
In
practice
I
Railway line ………
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
1
...
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
2
...
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
...
...
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
Compiler
(Signature and full name)
LEGITIMATE REPRESENTATIVE OF
RAILWAY INFRASTRUCTURE TRADING ENTERPRISE
(Signature,
full name, and seal)
APPENDIX VI
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
Where a road vehicle breaks down or
is involved in an accident and thus unable to evacuate from railroad crossing
or where goods fall over in railroad crossing in a manner that the vehicle or
the goods are less than 1,75 m away from the outermost rail, vehicle operator shall
take actions to inform oncoming train to stop as follows:
1. Where a train is approaching, the
vehicle operator shall immediately go in the direction of oncoming train and
signal the oncoming train to stop using red flags or reddish cloth during daytime
or red light directed at the oncoming train. Where red flag or red cloth or red
light is not available, the vehicle operator shall clench their fists or hold
any object and wave in a circular motion in the direction of the oncoming train
during daytime; wave portable light (of any color other than green) or fire in
a circular motion in the direction of the oncoming train.
2. Where whether an approaching
train is uncertain and where two other people who are not the vehicle operator
are present, each person who is not the vehicle operator shall go along
railroad in both directions and stay on the right side of each direction and,
once they are 500 m to 800 m away from the crossing, issue signals under
paragraph 1 above towards any oncoming train while standing 2 m away from the
outermost rail. Where crossing is close to railway station, the vehicle
operator may request other people to inform the station after setting up safety
measures under paragraph 3 below.
3. Where no other people are
present, the vehicle operator shall plant two wooden or bamboo stakes (do not
use stakes of metal or other hard materials) and tie a shirt or a piece of
cloth (during daytime) or a light source or fire (during nighttime) to the
stakes in the middle of railway, at least 500 m away from railroad crossing in
a way that the stakes are at least 1 m high above the rail to inform oncoming
railway vehicle to stop.
4. In addition to the aforementioned
measures, the vehicle operator must actively and rapidly evacuate vehicle or cargo
out of railway. Where obstacles have been evacuated to 1,75 m away from the
outermost rail, where the vehicle operator has made sure that the railroad is
not obstructed or damaged, and where the vehicle operator has made sure that
cargo and vehicles can no longer enter safety distance of railroad, the vehicle
operator shall dismantle warning signals that they have erected then continue
to evacuate the obstacles away from railway.
APPENDIX VII
APPLICATION
FOR RAILROAD CROSSING CONSTRUCTION, RENOVATION, UPGRADE PERMIT
(Attached to Circular No. 29/2023/TT-BGTVT dated September 29 of 2023 of the Minister
of Transport)
...(1)…
...(2)…
-------
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
No. ………/.………
……………(Location and date)
APPLICATION
FOR RAILROAD CROSSING CONSTRUCTION, RENOVATION, UPGRADE PERMIT
AT ………
(3) ………
To: ………
(4) ………
Pursuant to the Law on Railroad
dated June 16, 2017;
Pursuant to Circular No. /2023/TT-BGTVT
dated of 2023 of the Minister of Transport on railroad crossing and permit for
construction on railroad ground;
Pursuant to …… (5) ……
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
Hereby applies for railroad
construction, renovation, upgrade permit as follows:
1. Purpose: ……
2. Useful life: (long-term, specify
starting date and ending date in case of limited term)
3. Under …………… (6) ……………… Project
4. Location: ……… (7) ………
5. Estimated people, vehicle density
…… (8) ……
6. Class of crossing: ………………………
7. Primary technical elements:
a) Railway:
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
- Railway longitudinal section ……
(10) ……
- Railway base …… (11) ……
b) Road:
- Road cross section …… (12) ……
- Road cross section …… (13) ……
- Road longitudinal section …… (14)
……
- Road base: …… (15) ……
c) Angle of crossing …… (16) ……
8. Sight distance:
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
- Of railroad vehicle operator
(train driver) …… (18) ……
9. Distance to the nearest railroad
crossing …… (19) ……
- Direction of origin of kilometric
point …………
- Direction of end of kilometric
point …………
10. Guard measure: (Attendant,
automatic warning) …………
11. Safety devices: ……… (20) ………
12. Other issues (if any).
...(2) …… hereby undertakes to:
- Incur all costs for construction,
management, maintenance, guard measures (if any); implement site preparation in
road margin in railroad crossing vicinity; place directional traffic devices
and maintain traffic order and security in this area.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
Failure to meet the aforementioned
commitments will result in ……… (2) ……… being held accountable as per the law.
Address: ………
Phone number: ……………
POWER AND POSITION OF SIGNER
(Signature of
competent person, seal/digital signature of agency, organization)
Full name
Instructions
on how to fill in the Application
(1) Superior agency or agency of
applicant (if any).
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
(3) Kilometric point and name of
railway line.
(4) Competent authority issuing the
permit.
(5) Written construction approval
issued by competent authority.
(6) Full name of construction
project containing railroad crossing for which permit is applied.
(7) Kilometric point, name of
railway line, name of commune, district, province.
(8) Expected people and vehicle
density per 24 hours after construction, upgrade, renovation.
(9) Whether the railway line is
straight or curved (curve radius, curve direction according to kilometric
point).
(10) Gradient (‰) of railway,
whether the rail travels uphill or downhill according to kilometric point.
(11) Width of railway base, whether
railway base is cut or fill or neither, fill height or cut depth.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
(13) Length of straight section,
curve radius of road from either side of railway.
(14) Gradient (%) of road from
center line (or edge of rail) towards either side.
(15) Width of road base, whether
road base is cut or fill or neither, fill height or cut depth.
(16) Angle created by road and
railway in degree.
(17) Driving sight distance
depending on road grade under TCVN 4054-2005, specify value by standing on each
side of railroad crossing and looking towards railway on each side of the
railroad crossing.
(18) Distance to the railroad
crossing, in meters, at which the driver of a train approaching from the
starting point of kilometric point and from the opposite direction can see the
railroad crossing.
(19) Distance to the nearest
railroad crossing from both directions.
(20) Protective equipment of
railroad crossing attendants: Red flags, horns, flares, clocks, other equipment
present at railroad crossing guard posts (this section is left empty in case of
railroad crossing with automatic warning).
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
RAILROAD
CROSSING CONSTRUCTION, RENOVATION, UPGRADE PERMIT
(Attached to Circular No. 29/2023/TT-BGTVT dated September 29 of 2023 of the
Minister of Transport)
...(1)…
...(2)…
-------
SOCIALIST REPUBLIC OF VIETNAM
Independence - Freedom - Happiness
----------------
No. ………/.………
……………(Location and date)
PERMIT
(RAILROAD CROSSING CONSTRUCTION, RENOVATION, UPGRADE)
AT ………
(3) ………
Pursuant to the Law on Railroad
dated June 16 of 2017;
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
Pursuant to document approving permission
to build, renovate, upgrade railroad crossing No. ………/…… dated ……………… ;
Considering application for railroad
crossing construction, renovated, upgrade permit submitted by …… (4) ……… on
……………(date)
Article 1. Hereby permits:
- ...(4)...
- Represented by: …………………; title:
…………………………
- Address: …………………………………
- Phone: ……………………………………
Article 2. To built, renovate, upgrade:
1. Railroad crossing class: ………, guard
measure: ……………
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
- Angle created by railway and road:
………
- Width of railroad crossing : ………
m.
- Railway at the crossing:
+ Plan view: ……………………
+ Longitudinal section: ………
+ Superstructure design: …………
- Road at the crossing:
+ Plan view: ……………………
+ Longitudinal section: ………
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
- Type of barrier (if any):
………………………
- Communication and signalling
systems at crossing (if any): ………
- Fences, traffic cones, signs, road
markings, ………………
- Drainage system: …………………
- Guard post (if any): …………………
- Other issues: …………………………
Article 3. Expenditure on annual guard measure
implementation, management, operation, and maintenance shall be incurred by
…………
Article 4. Following completion of all work
items and equipment of railroad crossing, the Investor shall carry out
commissioning and hand over the structures in accordance with construction
laws.
Article 5. Permit effectiveness and
construction time
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
2. Construction takes place from
…………… (date) to …………… (date).
Article 6. Organizing implementation
POWER AND POSITION OF SIGNER
(Signature of
competent person, seal/digital signature of agency, organization)
Full name
Instructions
on how to fill in the Permit:
(1) Superior of competent authority
issuing the permit (if any).
(2) Competent authority issuing the
permit. (3) Kilometric point and name of railway line.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
(6) Authority approving design
dossiers.
APPENDIX IX
APPLICATION
FOR RAILROAD CROSSING REMOVAL
(Attached to Circular No. 29/2023/TT-BGTVT dated September 29 of 2023 of the Minister
of Transport)
...(1)…
...(2)…
-------
SOCIALIST REPUBLIC OF VIETNAM
Independence - Freedom - Happiness
----------------
No. ………/.………
……………(Location and date)
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
AT ………
(3) ………
To: ………
(4) ………
Pursuant to the Law on Railroad
dated June 16 of 2017;
Pursuant to Circular No. /2023/TT-BGTVT
dated of 2023 of the Minister of Transport on railroad crossing and permit for
construction on railroad ground;
Pursuant to …… (5) ……
...(2) ……… hereby requests ……… (4)
……… to remove railroad crossing of …… (6) …… class; of which …… (7) …… acts as
safety devices; created by intersection between …… (8) …… railway and …… (9) ……
road.
… (2) …… hereby undertakes to incur
expenditure on removing and returning railway section in the crossing to its
original state.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
Instructions
on how to fill in the Application:
(1) Superior of applicant for
railroad crossing removal.
(2) Applicant for railroad crossing
removal.
(3) Location, kilometric point, name
of railway line.
(4) Competent authority issuing
decision on railroad crossing removal.
(5) Reasons for removal.
(6) Class of railroad crossing:
class I, class II, class III.
(7) Guard measure (attended;
unattended: automatic warning, warning signs).
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
(9) Road, for example: national
highway No. …… provincial road No. …… connecting district with … public affair
road.
APPENDIX X
DECISION
ON RAILROAD CROSSING REMOVAL
(Attached to Circular No. 29/2023/TT-BGTVT dated September 29 of 2023 of the
Minister of Transport)
...(1)…
...(2)…
-------
SOCIALIST REPUBLIC OF VIETNAM
Independence - Freedom - Happiness
----------------
No. ………/.………
……………(Location and date)
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
On
removal of railroad crossing at … (3) … Km of …… railway line
...(2)...
Pursuant to the Law on Railroad
dated June 16 of 2017;
Pursuant to Circular No. /2023/TT-BGTVT
dated of 2023 of the Minister of Transport on railroad crossing and permit for
construction on railroad ground;
Considering request of ……………… (4)
………………………… ; .
At request of Mr./Mrs./Ms. ………………,
HEREBY
DECIDES:
Article 1. Annul ……… railroad crossing at ……
(3) …… Km of …… railway line from ……… (date).
Reason for removal: …… (5) ……
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
Article 3. Individuals and heads of relevant
entities are responsible for the implementation of this Decision./.
POWER AND POSITION OF SIGNER
(Signature of
competent person, seal/digital signature of agency, organization)
Full name
Instructions
on how to fill in the Decision
(1) Superior of competent authority
issuing the decision (if any).
(2) Competent authority issuing
decision on railroad crossing removal.
(3) Kilometric point and name of
railway line.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
(5) Reasons for railroad crossing
removal.
APPENDIX XI
APPLICATION
FOR EXTENSION OF RAILROAD CROSSING CONSTRUCTION, RENOVATION, UPGRADE PERMIT
(Attached to Circular No. 29/2023/TT-BGTVT dated September 29 of 2023 of the
Minister of Transport)
...(1)…
...(2)…
-------
SOCIALIST REPUBLIC OF VIETNAM
Independence - Freedom - Happiness
----------------
No. ………/.………
……………(Location and date)
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
To: ………
(4) ………
Pursuant to the Law on Railroad
dated June 16 of 2017;
Pursuant to Circular No. /2023/TT-BGTVT
dated of 2023 of the Minister of Transport on railroad crossing and permit for
construction on railroad ground;
Pursuant to Construction permit No.
…… dated ……… issued by ……(4)…… to ……(2)……
…(2)… hereby applies for extension
of railroad construction, renovation, and upgrade period due to ……(5)……
…(2)…… hereby undertakes to adhere
to the permit, decision on permit extension, and relevant provisions of the
law.
Address: ………
Phone number: ……………
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
POWER AND POSITION OF SIGNER
(Signature of
competent person, seal/digital signature of agency, organization)
Full name
Instructions
on how to fill in the Application
(1) Superior of applicant for
extension of railroad crossing construction, renovation, and upgrade permit.
(2) Applicant for extension of
railroad crossing construction, renovation, and upgrade permit.
(3) Kilometric point and name of
railway line.
(4) Competent authority issuing
decision on extension of railroad construction permit.
(5) Reasons for extending the
permit.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
DECISION
ON EXTENSION OF RAILROAD CROSSING CONSTRUCTION, RENOVATION, UPGRADE PERMIT
(Attached to Circular No. 29/2023/TT-BGTVT dated September 29 of 2023 of the
Minister of Transport)
...(1)…
...(2)…
-------
SOCIALIST REPUBLIC OF VIETNAM
Independence - Freedom - Happiness
----------------
No. ………/.………
……………(Location and date)
DECISION
On
extension of railroad construction permit
...(2)...
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
Pursuant to Circular No. /2023/TT-BGTVT
dated of 2023 of the Minister of Transport on railroad crossing and permit for
construction on railroad ground;
Pursuant to Construction permit No.
…… dated ……… issued by ……(4)…… to ……(2)……
Considering application for
extension of railroad crossing construction, renovation, upgrade permit No. ………
dated ……… issued by ……(4)……
HEREBY
DECIDES:
Article 1. Extend railroad construction,
renovation, upgrade permit No. ………… issued by ……(2)…… to ……(4)…… as follows:
- Extend railroad construction,
renovation, and upgrade period to ………… (date).
- Due to ……(5)……
Article 2. Other details and requirements to
investor, construction entities shall retain as per Permit No. ……… dated …………
Article 3. Effectiveness of decision
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
Article 4. Organizing implementation
POWER AND POSITION OF SIGNER
(Signature of
competent person, seal/digital signature of agency, organization)
Full name
Instructions
on how to fill in the Decision
(1) Superior of competent authority
issuing decision extending permit (if any).
(2) Competent authority issuing
decision extending the permit.
(3) Kilometric point and name of
railway line.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
(5) Reasons for extending railroad
construction, renovation, upgrade permit.
APPENDIX XIII
APPLICATION
FOR CONSTRUCTION PERMIT FOR STRUCTURES ON RAILWAY LAND
(Attached to Circular No. 29/2023/TT-BGTVT dated September 29 of 2023 of the Minister
of Transport)
...(1)…
...(2)…
-------
SOCIALIST REPUBLIC OF VIETNAM
Independence - Freedom - Happiness
----------------
No. ………/.………
……………(Location and date)
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
...(3)…
To: ………
(4) ………
Pursuant to the Law on Railroad
dated June 16 of 2017;
Pursuant to Circular No. /2023/TT-BGTVT
dated of 2023 of the Minister of Transport on railroad crossing and permit for
construction on railroad ground;
Pursuant to:
...(2) …… represented by: …………;
title: …………, hereby applies for construction permit for essential structures on
railway land as follows:
- Name of structure/work item: ……
(3) ……
- Under …………… (5) ……………… Project
- At ……… (6) ………
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
- Construction scale: ……(9)……
- Construction starts from
……………(date) to …………… (date) inclusive.
- ...(2) …… hereby undertakes to:
+ Relocate or renovate structure at
their discretion without claiming compensation at request of competent
authority; finalize procedures under relevant provisions of the law so as to
enable the structure to be finished within effective period of the Permit;
+ Demolish the structure at their
discretion and incur demolition costs upon expiry of useful life (for temporary
structures);
+ Adopt railway safety measures,
railway traffic safety and environmental protection measures;
+ Commence construction in
accordance with approved design dossiers and adhere to the Permit.
Failure to meet the aforementioned
commitments will result in ……… (2) ……… being held accountable as per the law.
Address: ………
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
POWER AND POSITION OF SIGNER
(Signature of
competent person, seal/digital signature of agency, organization)
Full name
Instructions
on how to fill in the Application
(1) Superior agency or agency of
applicant (if any).
(2) Applicant for permit.
(3) Name of structure or work item
for which permit is applied, kilometric point and name of railway line; for
example: “Clean water pipes penetrating railroad at km 5+555 of Hanoi - Ho Chi
Minh City railway line”.
(4) Authority issuing construction
permit.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
(6) Kilometric point, name of
railway line, name of district, province.
(7) Counseling organization for
design dossiers.
(8) Authority approving design
dossiers.
(9) Scale of structure, work item
(parts that are located on railway land) for which permit is applied.
APPENDIX XIV
CONSTRUCTION
PERMIT FOR STRUCTURES ON RAILWAY LAND
(Attached to Circular No. 29/2023/TT-BGTVT dated September 29 of 2023 of the
Minister of Transport)
…(1)…
…(2)…
-------
SOCIALIST REPUBLIC OF VIETNAM
Independence - Freedom - Happiness
----------------
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
……………(Location and date)
CONSTRUCTION
PERMIT FOR STRUCTURES ON RAILWAY LAND
…(3)…
Pursuant to the Law on Railroad
dated June 16 of 2017;
Pursuant to Circular No. /2023/TT-BGTVT
dated of 2023 of the Minister of Transport on railroad crossing and permit for
construction on railroad ground;
Pursuant to:
Considering application No. ………
dated ………… submitted by ……(4)……
Article 1. Hereby permits:
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
- Represented by: …………………; title:
…………………………
- Address: …………………………………
- Phone: ……………………………………
Article 2. To:
- Name of structure: ……(3)……
- Under …………… (5) ……………… Project
- Location: ……(6)……
- Construction scale (of the part
located on railway land): ……(7)……
Article 3. Responsibilities of permit
holder and relevant agencies, organizations:
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
2. ...
Article 4. Permit effectiveness and
construction time:
1. This permit comes into force from
…………… (date) to …………… (date).
2. Construction takes place from
…………… (date) to …………… (date).
POWER AND POSITION OF SIGNER
(Signature of
competent person, seal/digital signature of agency, organization)
Full name
Instructions
on how to fill in the Permit
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
(2) Competent authority issuing the
permit.
(3) Summarized name of structure or
work item for which permit is applied, kilometric point and name of railway
line; for example: “Clean water pipes penetrating railroad at km 5+555 of Hanoi
- Ho Chi Minh City railway line”.
(4) Applicant for permit.
(5) Construction project that
includes structure or work item for which construction permit is applied.
(6) Kilometric point, name of
railway line, name of district, province.
(7) Construction scale of the part
located on railway land.
(8) Required responsibilities for
applicant to which construction permit is granted and relevant agencies,
organizations.
APPENDIX XV
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
...(1)…
...(2)…
-------
SOCIALIST REPUBLIC OF VIETNAM
Independence - Freedom - Happiness
----------------
No. ………/.………
……………(Location and date)
APPLICATION
FOR EXTENSION OF CONSTRUCTION PERMIT FOR STRUCTURES ON RAILWAY LAND
…(3)...
To: ………
(4) ………
Pursuant to the Law on Railroad
dated June 16 of 2017;
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
Pursuant to Construction permit No.
…… dated ……… issued by ……(4)…… to ……(2)……
…(2)… hereby applies for extension
of construction permit:
Construction completion date: ………………
Reasons for extension: …(5)…
...(2) … hereby undertakes to adhere
to the Permit, decision on extension to construction permit, and relevant law
provisions.
Address: ………
Phone number: ……………
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
Instructions
on how to fill in the Application
(1) Superior authority of applicant
for construction permit (if any).
(2) Applicant for permit.
(3) Summarized name of structure or
work item the permit construction of which is applied for extension; for
example: “Clean water pipes penetrating railroad at km 5+555 of Hanoi - Ho Chi
Minh City railway line”.
(4) Competent authority extending
construction permit.
(5) Reasons for extending permit.
APPENDIX XVI
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
…(1)…
…(2)…
-------
SOCIALIST REPUBLIC OF VIETNAM
Independence - Freedom - Happiness
----------------
No. ………/.………
……………(Location and date)
DECISION
Extension
of construction permit for structures on railway land
...(3)...
Pursuant to the Law on Railroad
dated June 16 of 2017;
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
Pursuant to construction permit
dated No. ……………
Considering application for
extension of construction permit No. …… dated …and sent by ...... (4) ......
HEREBY
DECIDES
Article 1. To extend Construction
permit … (3) … issued by … (2) … to … (4) … as follows:
Construction completion date: ………………
Reasons for extension: …(5)…
Article 2. Other details and requirements
applicable to organization, individual whose construction permit is extended
Article 3. Effectiveness of the Decision
This Decision comes into force from
……… (date) to ……… (date).
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.
POWER AND POSITION OF SIGNER
(Signature of
competent person, seal/digital signature of agency, organization)
Full name
Instructions
on how to fill in the Decision
(1) Superior of competent authority extending
the permit (if any).
(2) Competent authority extending
the permit.
(3) Summarized name of structure or
work item, kilometric point and name of railway line; for example: “Clean water
pipes penetrating railroad at km 5+555 of Hanoi - Ho Chi Minh City railway
line”.
(4) Applicant for permit.
(5) Reasons for extending permit.
...
...
...
Hãy đăng nhập hoặc đăng ký Thành viên
Pro tại đây để xem toàn bộ văn bản tiếng Anh.