MINISTRY OF
TRANSPORT
--------
|
SOCIALIST
REPUBLIC OF VIETNAM
Independence - Freedom - Happiness
----------------
|
No.
24/2016/TT-BGTVT
|
Hanoi, September
15, 2016
|
CIRCULAR
ON
THE ECONOMIC - TECHNICAL NORMS FOR OPERATION, DEPLOYMENT AND MAINTENANCE OF
AUTOMATIC IDENTIFICATION SYSTEM
Pursuant to the Government’s Decree No.
107/2012/ND-CP dated December 20, 2012 on the functions, missions, authority and
organizational structure of the Ministry of Transport;
At the request of the Head of Department of
Transport infrastructure and the Head of Vietnam Maritime Administration;
Minister of Transport promulgates the Circular
on the economic - technical norms for operation, deployment and maintenance of
the automatic identification system .
Article 1. This Circular is enclosed with the economic - technical
norms for operation, deployment and maintenance of the automatic identification
system (AIS).
Article 2. This Circular comes into force as of November 01, 2016.
Article 3. Chief of Office of the Ministry, Chief inspector of the
Ministry, heads of departments and agencies, Head of Vietnam Maritime
Administration, heads of organizations and individuals concerned shall be
responsible for implementing this Circular./.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
MINISTER
Truong Quang Nghia
ECONOMIC
- TECHNICAL NORMS FOR OPERATION, DEPLOYMENT AND MAINTENANCE OF AUTOMATIC
IDENTIFICATION SYSTEM
(Enclosed
to the Circular No. 24/2016/TT-BGTVT dated September 15, 2016 by Minister of
Transport)
Table of contents
CHAPTER I. APPLICATION
I. General introduction
II. Legal basis
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
IV. Content of norms
V. Application
CHAPTER II. ECONOMIC - TECHNICAL NORMS FOR OPERATION,
DEPLOYMENT AND MAINTENANCE OF AUTOMATIC IDENTIFICATION SYSTEM
I. TASKS
1. Operation and deployment of AIS data center
a) Operation of equipment, transmission line,
power source
b) Software operation
c) Deployment of AIS information
2. Operation of AIS receiving station
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
b) Software operation
II. NORMS FOR CONSUMPTION
1. Labor norm
2. Norms for consumption of material and fuel
a) Norm for consumption of electricity
b) Norm for consumption of fuel
c) Norm for consumption of material
d) Norm for use of production instruments
dd) Norm for transmission lines
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
3. Norm for spare parts
CHAPTER III. ECONOMIC - TECHNICAL NORMS FOR MAINTENANCE
OF AUTOMATIC IDENTIFICATION SYSTEM
I. TASKS
1. Preparation
2. Pre-maintenance equipment inspection
3. Maintenance
4. Post-maintenance performance inspection
5. Finishing
II. NORMS FOR CONSUMPTION
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
2. Firewall
3. Switch
4. Router
5. Computers for supervision, deployment and
processing
6. 7.5kVA generator
7. 2kVA generator
8. VHF antenna: 10m - 35m
9. AIS receiver
10. Air conditioner: 9,000 BTU - 18,000 BTU
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
12. Uninterruptible power supply (UPS): 3kVA -
10kVA (Maintenance cycle: 06 months)
Chapter I
GENERAL
I. General introduction
1. Automatic identification system (AIS) is a
system that receives, stores and furnishes the identification information,
location and itinerary of vessels fitted with AIS (referred to as the AIS).
Pursuant to the 1974 SOLAS Convention (rev. 2002), AIS is required on every
vessel of 300 GT and over embarking on international voyage, every freighter of
500 GT and over not undertaking transnational voyage and passenger vessels of
all sizes. At present, various countries demand the installation of AIS not
only on vehicles defined in the SOLAS Convention but also on others such as
drilling rigs, fishing vessels, inland watercrafts, etc.
An AIS is basically composed of:
a) AIS equipment: technical
components fitted on marine vessels, drilling rigs, fishing vessels, inland
watercrafts, navigable channel dredging crafts, marker buoys, marine navigation
light, etc. to transmit and receive AIS packets of information. AIS equipment
shall operate uninterruptedly in conformity with relevant technical standards
and regulations;
b) AIS receiving station: the onshore
technical facility that receives AIS packets transmitted from the AIS
equipment, stores temporarily and relays such packets to an AIS data center;
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
d) AIS packet: the encrypted data
transmitted from the AIS equipment. The packet contains the data on vessel(s)
such as ship identification information, speed, direction, location, etc.;
dd) AIS data: the information
processed and provided by an AIS data center, which basically includes the
vessel’s identification code, name, location, timestamp, direction, speed,
itinerary, etc.
2. An AIS produces and provides AIS data services
in the following manner:
a) Receive AIS packets from the vessels fitted with
AIS. The receiving zone is limited to the VHF radio range that extends from the
location of the AIS receiving station;
b) Analyze, process and store data in the AIS data
center in at least 03 years;
c) Provide the vessels’ identification data,
location, itinerary and relevant information to users;
d) Provide an access interface for users to monitor
and manage vessels online via an electronic map over the Internet. Enable users
to seek a vessel’s voyage log at their discretion.
II. Legal basis
1. Labor Code dated June 18, 2012 and guiding documents.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
3. Circular No. 25/2014/TT-BTC dated February 17,
2014 by Minister of Finance on the universal method for pricing of goods and services.
4. Circular No. 26/2015/TT-BLDTBXH dated July 14,
2015 by Minister of Labor - Invalids and Social affairs on guidelines for the
determination of salaries in prices of state-funded public products and
services.
5. Circular No. 28/2014/TT-BGTVT dated July 29,
2014 by Minister of Transport on the procedure for dredging and maintenance of
navigable channels under the state-funded management and use by the Ministry of
Transport.
III. Abbreviations
1. IMO: International Maritime Organization
2. SOLAS: International Convention for the Safety
of Life at Sea
3. AIS: Automatic Identification System
4. LRIT: Long Range Identification and Tracking
5. VHF: Very High Frequency
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
1. The economic - technical norms for operation,
deployment and maintenance of the AIS consist of the labor norm and the norms
for consumption of material and fuel, transmission line, software subscription
and spare parts of the AIS with the aim of sustaining the provision of AIS data
services (referred to as the services).
2. Labor norm: the cost of direct labor necessary
for completing an amount or phase of technology amid the operation, deployment
and maintenance of machines and equipment of the AIS. The cost of labor is the
amount of work days in which workers directly operate, deploy and maintain the
system. The labor level defined in the norm shall be the average level of the
workers directly engaged in the tasks.
3. Norm for consumption of electricity: the cost in
electric power determined by installed power, quantity and uptime of each
machine or equipment of the AIS according to the statistics on operational
conditions.
4. Norm for consumption of fuel: the cost in fuel
and lubricant determined by installed power, quantity and operational level of
electric generators of the AIS.
5. Norm for consumption of material for operation,
deployment and maintenance: the cost in material and apparatus for operation,
deployment and maintenance of the AIS.
6. Norm for use of production instruments: the cost
in instruments for operation and deployment of the AIS in adherence to its
designed functionalities.
7. Norm for transmission line: the cost in quantity
and speed of transmission lines that connect the AIS data center with AIS
receiving stations and telecommunications network for the provision of the
services.
8. Norm for software subscription: the cost in
software copyright for which subscription is taken annually in order to
maintain the full functionalities of the software.
9. Norm for spare parts: the cost in spare parts as
replacements for machines and equipment of the AIS in order to maintain the
stable 24/7 operation of the AIS.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
The economic - technical norms for operation,
deployment and maintenance of the AIS apply to automatic identification systems
deployed for managing, examining and supervising the crafts that dredge and
maintain navigable channels. Such norms shall be the basis of the estimation
and finalization of expenses for the provision of AIS data services.
Chapter II
ECONOMIC - TECHNICAL
NORMS FOR OPERATION AND DEPLOYMENT OF AUTOMATIC IDENTIFICATION SYSTEM
I. TASKS
1. Operation and deployment of AIS data center
a) Operation of equipment, transmission line
and power source:
- Operate servers, deployment and supervising computers,
data storage equipment;
- Operate the physical media for Internet
connectivity and networking hardware;
- Operate the electrical system and ancillary
equipment;
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
b) Software operation:
- Administer the operating system on servers,
supervision computers, deployment computers and data storage equipment;
- Operate the database management system;
- Operate administrative applications;
- Operate software;
- Update software;
- Grant and administer service accounts.
c) Provision of AIS data:
- Furnish the AIS data to competent authorities
upon request;
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
2. Operation of AIS receiving station
a) Operation of equipment, transmission line,
power source
- Operate AIS receivers and processing computers;
- Operation of physical media for Internet
connectivity and networking equipment;
- Operate electrical system and ancillary
equipment;
- Perform industrial cleaning.
b) Software operation
- Operate software in the AIS receiving station.
II. NORMS FOR CONSUMPTION
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
The labor norm of an AIS is defined in Table 1
below.
Table 1
No.
Task
Title (*)
Description
Cost of labor
(workload/day)
Level
Workload/shift
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
(1)
(2)
(3)
(4)
(5)
(6) = (4) x
(5)
(7)
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
OPERATION
I
AIS data center
1
Technical supervision
Technical
controller
(University
degree or higher)
1
2
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
4/5
2
Operation of equipment, transmission line, power
source
Technician
(University
degree or higher, class II)
1
3
3
6/8
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Software operation
Technician
(University
degree or higher, class II)
1
3
3
6/8
4
Provision of AIS data
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
(College
degree or higher)
1
2
2
5/5
II
AIS receiving station
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Operation of equipment, transmission line, power
source and software in an AIS receiving station
Technician
(University
degree or higher, class II)
1
3
3
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
B
SUPPORT AND ADMINISTRATION
1
Ancillary work
Facilitator
= 10% x [labor cost in section I on AIS data
center + (Section II on AIS receiving station x number of AIS receiving
stations)]
9/12
2
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Worker
= 10% x [labor cost in section I on AIS data
center + (Section II on AIS receiving station x number of AIS receiving
stations) + Facilitator]
6/8
(*) Pursuant to the Circular No. 26/2015/TT-BLDTBXH
dated July 14, 2015 by Minister of Labor - Invalids and Social affairs on
guidelines for the determination of salaries in prices of state-funded public
products and services.
2. Norms for consumption of material and fuel
a) Norm for consumption of electricity
Norm for consumption of electricity of the AIS (on
1-year basis) is determined in Table 2 below.
Table 2
No.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Unit
Total quantity
Power (kW)
Availability
Uptime
Power consumed/year (kWh)
Annual loss (kWh)
Total power consumed/year (kWh)
Quantity
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Power/day (kW)
Quantity
Hour/day
Power/day (kW)
(1)
(2)
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
(4)
(5)
(6)
(7)
(8) = (5) * (6) * (7) * 10%
(9)
(10)
(11) = (5) * (9) * (10) * 80%
(12) = ((8)+(11)) * 365
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
(14) = (12) + (13)
I
AIS Data center
37,929
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
37,929
1
Server
Set
4
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
1
24
1.104
3
24
26.496
10,074
504
10,578
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Deployment and
supervision computer
Set
2
0.32
1
24
0.768
1
24
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
2,523
126
2,649
3
Transmission line
equipment
Set
2
0.005
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
2
24
0.192
70
4
74
4
VPN equipment
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
1
0.02
1
24
0.384
140
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
147
5
Router
Set
2
0.21
1
24
0.504
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
24
4.032
1,656
83
1,739
6
Switch
Set
2
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
1
24
1.260
1
24
10.080
4,139
207
4,346
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Firewall
Set
1
0.25
1
24
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
1,752
88
1,840
8
Data storage
equipment
Set
1
0.35
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
1
24
6.720
2,453
122
2,575
9
Air conditioner
18,000 BTU
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
1
2.6
1
12
24.960
9,110
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
9,566
10
Auxiliary equipment
(fire alarm, regulator, UPS, lighting, etc.)
1
0.6
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
24
11.520
4,205
210
4,415
II
One AIS
receiving station
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
11,373
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
AIS receiver (with
antenna)
Set
2
0.005
1
24
0.012
1
24
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
39
2
41
2
Processing computer
Set
2
0.32
1
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
0.768
1
24
6.144
2,523
126
2,649
3
VPN equipment
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
1
0.02
1
24
0.384
140
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
147
4
Transmission line
equipment
Set
2
0.005
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
24
0.192
70
4
74
5
Air conditioner
9.000 BTU
Set
1
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
1
12
12.480
4,555
228
4,783
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Auxiliary equipment
(fire alarm, regulator, UPS, lighting, etc.)
1
0.5
1
24
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
3,504
175
3,679
b) Norm for consumption of fuel
Norm for consumption of fuel of the AIS (on 1-hour
basis) is determined in Table 3 below.
Table 3
No.
Item
Quantity
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Rated amount
Fuel (l/hour)
Lubricant (%)
(1)
(2)
(3)
(4)
(5)
(6)
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
AIS data center
7.5kVA generator
1
6
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
1.8
2
AIS receiving station
2kVA generator for one AIS receiving station
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
1.6
1.15
1.8
Note: The rated amount of lubricant consumed is
proportional to, in percentage, the rated amount of fuel consumed.
c) Norm for consumption of material
The cost of material for operation and deployment
is 10% of the sum of electric power cost and fuel cost;
d) Norm for use of production instruments
The cost of production instruments is 7% of the
total cost of labor by statutory pay rate for operation, deployment and
maintenance;
dd) Norm for transmission lines
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Table 4
No.
Channel
Specification
Quantity
Note
1
Internet leased line for the AIS data center
30 Mbps
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
2
FTTH internet line for the AIS data center
30 Mbps
01
3
FFTH internet line for 01 AIS receiving station
20 Mbps
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
e) Norm for annual software subscription
The norm for annual software subscription to
maintain the operation of the system is defined in Table 5 below.
Table 5
No.
Item
Unit
Rated cost/year
Note
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
One-year license of network security software for
a firewall device
License
1
2
One-year license of antivirus software for a
server or computer
License
1
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
One-year license of digital map for an
application server
License
1
3. Norm for spare parts
It is the quantity of spare parts required as equipment
replacements for the AIS to maintain uninterrupted and stable 24/7 operation.
The norm for spare parts (on 1-year basis) is defined in Table 6 below.
Table 6
No.
Description
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Rated cost/year
Note
1
Server
Central processing unit
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
0.33
Hard disk drive
Item
0.33
RAM
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
0.33
Power supply unit
Item
0.33
2
Data storage equipment
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Central processing unit
Item
0.33
Hard disk drive
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
0.33
RAM
Item
0.33
Power supply unit
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
0.33
3
Supervision and deployment computers
Hard disk drive
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
0.33
Screen
Item
0.33
Power supply unit
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
0.33
4
VHF antenna
Item
0.5
5
Coaxial antenna cable
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
30
6
Coaxial antenna cable connector
Item
0.5
7
Coaxial antenna cable lightning arrestor
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
0.33
8
AC 220V/DC 13.8V - 20A converter
Item
0.33
9
12V 7Ah UPS battery
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
0.33
10
12V 7Ah battery for AIS receiving station and
electric generator
Item
0.33
2 AIS spare parts may be replaced
with equivalents.
Chapter III
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
I. TASKS
Maintenance tasks are defined according to the
technology line, specifications and manufacturer’s maintenance guidelines for
AIS equipment. The tasks include:
1. Preparation
a) Prepare apparatus necessary for maintenance
work;
b) Gather the literature on maintenance, including
the diagram, catalogue and maintenance forms;
c) Prepare the premises and safety gears for
maintenance work.
2. Pre-maintenance equipment inspection
a) Examine the functionalities of the equipment via
the system;
b) Initiate test applications on the equipment to
verify conditions prior to maintenance;
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
3. Maintenance
a) Clean and examine the equipment powered off;
b) Verify and adjust parameters of the equipment
powered on;
c) Replace broken components and parts (if any).
4. Post-maintenance performance inspection
a) Test-run the control system;
b) Examine the equipment’s functionalities by
deploying the system in reality.
5. Finishing
a) Reassemble the equipment;
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
c) Input all details and result of the maintenance
work in relevant forms and in the log, report to the supervisor.
II. NORMS FOR CONSUMPTION
1. Servers and data storage
equipment (Maintenance cycle: 06 months)
I. Tasks
a) Preparation
- Gather the written materials on maintenance;
- Elaborate and assign the tasks of maintenance;
- Prepare measuring devices, measurement tool
extension base, material, spare parts, written materials, premises and safety
gears for maintenance work;
- Install and run alternative servers that
substitutes those under maintenance.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Re-examine the operational conditions of servers
and software installed such as the operating system and other essential
applications;
Back up the essential data;
Back up the current configurations to an external
drive for recovering from post-maintenance issues;
Log all conditions of the equipment prior to
maintenance.
c) Maintenance
This procedure applies to functional servers such
as application servers, database servers, backup servers, data storage
equipment, etc. Since the servers are composed of identical hardware but
different software, the maintenance work progresses as follows:
- Turn of the server via shutdown command; unplug
the power cord and cables from the server;
- Label the cables unplugged for identification;
- Remove the server from the rack then place it at
the maintenance position;
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
d) Server hardware maintenance:
- Disconnected from power:
+ Clean the exterior of the screen and the case;
+ Disassemble the modules inside the case, clean
the RAID controller card, NIC, keyboard and mouse with a special cleaning
solution and cloth. Examine the cooling fan of the CPU to maintain its
functionality;
+ Remove the front bezel from the screen, clean the
circuit board and screen;
+ Remove the optical disk drive and tap drive,
clean each peripheral with a soft brush and vacuum cleaner.
+ Examine the “offline” conditions of the mainboard
to detect damage; use a digital meter to check if the soft cables connecting
segments are loose, bent or broken; examine and, if necessary, replace the CMOS
battery;
+ Reassemble every component in reverse order of
removal and connect cables to the mainboard;
+ Reinstall RAM, CPU and power supply unit.
Reconnect the server to power.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
+ Turn on the server;
+ Use a digital meter to measure voltage at power
supply points on standard electrical circuits;
+ Complete the maintenance work and log the entire
process in the log;
+ Shut it down then reassemble the entire set.
dd) Software maintenance
- Examine the operating system and software in use
through the event log. Reinstall the operating system if relevant incidents
frequently occur;
- Examine and reinstall the applications if found
poorly functional;
- Use the software specialized in cleaning
unnecessary files during the process of operation.
e) Post-maintenance performance inspection
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- Insert the set into the rack and connect it to
other devices.
g) Finishing
- Review the completed tasks and recheck the
performance of servers and peripherals;
- Evaluate the equipment’s performance after
maintenance by viewing the system’s indicator charts. Collate such data with
the pre-maintenance variables to detect variations;
- Input all details and result of the maintenance
work in relevant forms, report to the supervisor;
- Complete the maintenance work and log the entire
process in the log;
- Clean the maintenance area, put away the
measuring devices and written materials in regulated places.
1.2. Norm
a) Labor norm (workload)
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- Engineer at level 5/8: 4.23
- Engineer at level 3/8: 5.75
- Technician at level 5/7: 2.15
b) Norm for consumption of material
- The cost of material for maintenance work is 10%
of the cost of labor by statutory pay rate for maintenance work.
2. Firewall equipment
(Maintenance cycle: 06 months)
2.1. Tasks
a) Preparation
- Peruse the literature and diagrams of the
equipment and processes;
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- Prepare measuring devices, material, spare parts,
written materials, premises and safety gears for maintenance work;
- Prepare other firewall equipment as replacement
during the process of maintenance.
b) Pre-maintenance equipment inspection
- Examine the conditions of the equipment prior to
maintenance;
- Back up the current configurations to an external
drive for recovering from post-maintenance issues;
- Log all conditions of the equipment prior to
maintenance.
c) Maintenance
- Verify the configuration, check loopholes,
analyze and assess the security level and devise network protection solutions;
- Set up other equipment as temporary replacement
during the process of maintenance;
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- Label the cables unplugged for identification;
- Remove the equipment from the rack then place it
at the maintenance position;
- Put on the electrostatic discharge wrist strap
and examine the grounding before disassembling the inside components;
- Disassemble the equipment according to the
manufacturer’s guideline;
- Clean the circuit board, check the looseness of
jacks and pins, examine the fan, repair and replace components if necessary;
- Clean the equipment and its power supply unit
with a soft brush and vacuum cleaner;
- Plug in the cables in original state, turn on the
power and examine the ports’ indicator lights;
- Connect the equipment to the local area network
to check if the equipment functions normally and exchanges data;
- Insert the equipment into the rack and connect it
to other devices;
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- Reconfigure the equipment according to the actual
situation;
- Complete the maintenance work and log the entire
process in the log.
d) Post-maintenance performance inspection
- Examine the general condition of the equipment
before reinstalled;
dd) Finishing
- Review the completed tasks and recheck the
performance of the firewall equipment and peripherals;
- Assess the equipment’s performance after
maintenance by viewing the system’s indicator charts. Collate such data with
the pre-maintenance variables to detect variations;
- Input all details and result of the maintenance
work in relevant forms, report to the supervisor;
- Complete the maintenance work and log the entire
process in the log;
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
2.2. Norm
a) Labor norm (workload)
- Engineer at level 7/8: 0.2
- Engineer at level 3/8: 0.6
- Technician at level 5/7: 1.2
b) Norm for consumption of material
- The cost of material for maintenance work is 10%
of the cost of labor by statutory pay rate for maintenance work.
3. Switch (Maintenance cycle:
06 months)
3.1. Tasks
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- Peruse the literature and diagrams of the
equipment and processes;
- Elaborate and assign the tasks of maintenance;
- Prepare measuring devices, material, spare parts,
written materials, premises and safety gears for maintenance work;
- Set up other switches as temporary replacement
for those under maintenance.
b) Pre-maintenance equipment inspection
- Examine the conditions of the equipment prior to
maintenance;
- Back up the current configurations to an external
drive for recovering from post-maintenance issues;
- Log all conditions of the equipment prior to
maintenance.
c) Maintenance
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- Switch off the equipment, unplug the power cord
and cables, remove the equipment from the rack and place it at the maintenance
position;
- Label the cables unplugged for identification;
- Put on the electrostatic discharge wrist strap
and examine the grounding before disassembling the inside components;
- Disassemble the equipment according to the
manufacturer’s guideline;
- Clean the circuit board, check the looseness of
jacks and pins, examine the fan, repair and replace components if necessary;
- Clean the equipment and its power supply unit
with a soft brush and vacuum cleaner;
- Clean all ports of the switch;
- Plug the cables into the switch in their original
state, turn on the power and examine the ports’ indicator lights;
- Connect the equipment to the local area network
to check if the equipment functions normally and exchanges data;
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- Connect the equipment with a computer by the
(original) rollover cable to examine the switch’s configuration. Collate the
configurations of the switch, its ports and VLANs with the variables formerly
logged to detect variations that may occur;
- Complete the maintenance work and log the entire
process in the log.
d) Post-maintenance performance inspection
- Examine the general condition of the equipment
before reinstalled;
dd) Finishing
- Review the completed tasks and recheck the
performance of the switch and its peripherals;
- Assess the equipment’s performance after
maintenance by viewing the system’s indicator charts. Collate such data with
the pre-maintenance variables to detect variations;
- Input all details and result of the maintenance
work in relevant forms, report to the supervisor;
- Complete the maintenance work and log the entire
process in the log;
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
3.2. Norm
a) Labor norm (workload)
- Engineer at level 7/8: 0.20
- Engineer at level 3/8: 0.60
- Technician at level 5/7: 1.20
b) Norm for consumption of material
- The cost of material for maintenance work is 10%
of the cost of labor by statutory pay rate for maintenance work.
4. Router (Maintenance cycle:
06 months)
4.1. Tasks
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- Peruse the literature and diagrams of the
equipment and processes;
- Elaborate and assign the tasks of maintenance;
- Prepare measuring devices, material, spare parts,
written materials, premises and safety gears for maintenance work;
- Set up other routers as temporary replacement for
those under maintenance.
b) Pre-maintenance equipment inspection
- Examine the conditions of the equipment prior to
maintenance;
- Back up the current configurations to a computer
for recovering from post-maintenance issues;
- Log all conditions of the equipment prior to
maintenance.
- Set up other equipment as temporary replacement
during the process of maintenance.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- Power off then remove the equipment from the rack
then place it at the maintenance position;
- Put on the electrostatic discharge wrist strap
and examine the grounding before disassembling the inside components;
- Disassemble the equipment according to the
manufacturer’s guideline;
- Clean the circuit board, check the looseness of
jacks and pins, examine the fan, repair and replace components if necessary;
- Clean the equipment and its power supply unit
with a soft brush and vacuum cleaner;
- Plug the cables into the router in their original
state, turn on the power and examine the ports’ indicator lights;
- Connect the equipment to the local area network
to check if the equipment functions normally and exchanges data;
- Insert the equipment into the rack and connect it
to other devices;
- Connect the equipment with a computer by the
(original) rollover cable to examine the router’s configuration.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- Complete the maintenance work and log the entire
process in the log.
d) Post-maintenance performance inspection
- Examine the general condition of the equipment
before setting the system in normal operation;
- Assess the equipment’s performance after
maintenance by viewing the system’s indicator charts. Collate such data with
the pre-maintenance variables to detect variations.
dd) Finishing
- Review the completed tasks and recheck the
performance of the routers and their peripherals;
- Assess the equipment’s performance after
maintenance by viewing the system’s indicator charts. Collate such data with
the pre-maintenance variables to detect variations;
- Input all details and result of the maintenance
work in relevant forms, report to the supervisor;
- Complete the maintenance work and log the entire
process in the log;
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
4.2. Norm
a) Labor norm (workload)
- Engineer at level 7/8: 0.20
- Engineer at level 3/8: 0.60
- Technician at level 5/7: 1.20
b) Norm for consumption of material
- The cost of material for maintenance work is 10%
of the cost of labor by statutory pay rate for maintenance work.
5. Computers for supervision,
deployment and processing (Maintenance cycle: 06 months)
5.1. Tasks
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- Gather the literature on maintenance and the
relevant samples;
- Elaborate and assign the tasks of maintenance;
- Prepare the premises, instruments and material
such as dissemble tools, multi-purpose meter, soft brush, industrial cleaning
solution, measuring instruments, standby computers, external memory drives and
tapes for maintenance work.
b) Pre-maintenance equipment inspection
- Examine the entire computer, indicator lights and
operating system;
- Set up other computers as temporary replacement
during the process of maintenance;
- Examine the remote management of the computer by
running the software;
- Log all conditions of the equipment prior to
maintenance.
c) Maintenance
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
+ Use the software from Acronis (or equivalents) to
perform backup in an appropriate order;
+ Save all files of the system into an external
drive.
- Computer software
+ Log on to the system with the administrator
account, restart Windows to check if errors occur during the startup process.
If possible, use the logging feature of Windows (Administrative Tools > Event
Viewer) to detect errors and solutions; reinstall the operating system if such
errors cannot be rectified.
+ Examine and reinstall the applications if found
poorly functional;
+ Access the software on the remote management
computer, verify and log the configurations of the entire system;
+ Send remote commands to the peripherals, check if
such peripherals execute the commands, examine the alert feature for errors
preconfigured on the remotely controlled peripherals;
+ Update the antivirus software and network
security applications, scan for viruses and network loopholes;
+ Run the applications that clean up broken files
and optimize the system.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
+ Computer tower:
● Close the running applications and shut down the
equipment in the appropriate order;
● Unplug the power cord and cables connected to
external peripherals such as printer, network devices, speaker, keyboard,
mouse, etc.
● Use a dedicated disassemble tool kit to remove
the panels of the CPU, wear an electrostatic discharge wrist strap during the
disassembling process to avoid damaging the interior components;
● Disconnect the case’s power supply unit from the
mainboard and perform the industrial cleaning process, examine and, if
necessary, replace the fan(s), remove dust and replace the moisture absorber
bag(s), measure the output voltage of the power supply unit to maintain the
voltage level of the power supplied to the mainboard;
● Remove the hard disk drive and CD drive, clean
the bays;
● Clean the mainboard, check if the fan of the
processor is broken. Examine, weld or replace the electronic components found
damaged;
● Reassemble the components and connect cables onto
the mainboard, refit the panels of the case, power on the computer. If there
are error-warning beeps, the case shall be opened and the components and cables
are separately examined.
+ LCD screen:
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
● Remove the rear housing, and remove dust from the
interior with a soft brush and vacuum cleaner;
● Reassemble the cable and power cord, switch on
the screen, check if the images are finely displayed.
+ Complete the maintenance work and log the entire
process in the log.
d) Post-maintenance performance inspection
- Initiate the self-test applications of the
central processing unit to verify the equipment’s conditions after maintenance
and the operating system’s functioning;
- Examine the general condition of the peripherals
before reinstalled.
dd) Finishing
- Review the completed tasks and recheck the
performance of the equipment after maintenance;
- Assess the equipment’s performance after
maintenance by viewing the system’s indicator charts. Collate such data with
the pre-maintenance variables to detect variations;
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- Complete the maintenance work and log the entire
process in the log;
- Clean the maintenance area, put away the
measuring devices and written materials in regulated places.
5.2. Norm
a) Labor norm (workload)
- Engineer at level 5/8: 0.50
- Engineer at level 4/8: 2.00
- Technician at level 5/7: 1.50
b) Norm for consumption of material
- The cost of material for maintenance work is 10%
of the cost of labor by statutory pay rate for maintenance work.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
6.1. Test run of electric generators (Test
run cycle: once per week)
a) Tasks
- Preparation
+ Peruse the literature and manuals on the
equipment’s usage and operation;
+ Prepare the load to run the test of the electric
generator (with multi-speed motors);
+ Prepare the generator test run log.
- Pre-test equipment inspection
+ Check the levels of fuel, lubricant and motor coolant,
check the meters (if available) and the generator's functioning in normal
conditions;
+ Examine the exterior of the accumulators and
their terminals;
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
+ Disconnect all load from the generator’s output,
connect the test load to the generator;
+ Check and handle unsafe risks that may ensue
during the generator’s startup.
- Test run of electric generator
+ Switch off the generator’s CB;
+ Start up the generator with the relevant button
or by hand. Shut down the generator in emergency if anomalies are detected;
+ Check the variables shown on the control panel
and meters (voltage, current, frequency, fuel level, lubricant level, etc.);
+ Run the generator without load in 10 minutes,
read the variables shown on the control panel and meters during this period;
+ Switch on the generator’s CB for its test run
under load;
+ Adjust the motor’s speed (i.e. load output) at
various levels in 15 minutes to observe the variables shown on the control
panel and meters;
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
+ Shut down the generator with the STOP button;
+ Total duration of test run: 30 minutes
- Finishing
+ Detach the test load from the generator,
reconnect the intended load in original state;
+ Recheck the contacts with power source, circuit
breakers’ state and automatic transfer switch system;
+ Log the generator’s test run.
b) Norm
- Labor norm (workload)
+ Technician at level 5/7: 0.125
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
+ The cost of fuel for test run shall be equal to
the duration of the test run multiplied by the fuel consumption level specified
in Table 3, section 2.2., Part II - Norm for consumption, Chapter 2.
.2. Electric generator maintenance (Maintenance
cycle: once per year)
6.2.1. Tasks
a) Preparation
- Peruse the literature and diagrams of the
equipment and processes;
- Elaborate and assign the tasks of maintenance;
- Prepare measuring devices, material, spare parts,
maintenance forms, premises and safety gears for maintenance work.
b) Pre-maintenance equipment inspection
- Examine the status of the lights on the
generator’s panel;
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- Log the operative condition and variables
collected from the generator’s test run.
c) Maintenance
- Shut down, clean and disassemble the generator
for maintenance;
+ Motor maintenance:
● Check the cleanliness (sediment, water and
impurities) and level of the motor lubricant, fuel and coolant, replace or
refill them (if necessary);
● Examine and adjust the accumulator charger’s belt
and motion pulleys, tighten screw nuts (if necessary);
● Examine and tighten the straps of water pipes,
fuel pipes and lubricant pipes. If leakage is detected, pipes must be replaced
to avoid damage to the generator;
● Examine and change the filters of cooling
lubricant and fuel oil at periodic intervals (250 hours or 06 months);
● Examine, clean and, if necessary, adjust the
overheat protection unit, air filtering unit and shock absorber;
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
● Examine and clean the connection points of the
ignition motors’ cables, clean the points connecting the accumulator and the
ignition motor;
● Input the maintenance result into relevant forms.
+ Maintenance of electricity generation
component:
● Examine the functionalities of the control panel
and display by pushing the test button, resolve issues that may ensue;
● Use standard meter(s) to check and adjust the
AVR, exciter and measuring parts;
● Measure and calibrate the electrical insulation
of wires and covers according to the technical standards, impregnate and dry
the coils if necessary;
● Clean the equipment and its location entirely,
apply the anti-rust and color paint(s) on the equipment, tighten screw nuts and
power cord's contact;
● Examine, clean and refit the rotor and stator;
● Run the test, examine and adjust the parameters
if necessary;
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
● Input the maintenance result into relevant forms.
+ Maintenance of automatic transfer switch
(ATS):
● Disconnect the ATS entirely from the power grid
and electric generator;
● Check the contactor's automatic and manual
connection and disconnection with the power grid and the generator's output;
● Examine and calibrate the equipment’s display and
measurement;
● Examine and clean the contact points in the
junction boxes and the entire ATS.
+ Maintenance of the fuel storage and supply
system;
● Clean and examine entirely the fuel storage and
supply system, resolve leakage and damage if detected;
● Open all valves conveying fuel from the tank to
the machine and vice versa to release gas, sediments and water from the pipes.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
● Clean the entire machine room;
● Examine the lighting system, lightning protection
system, grounding system and fire fighting system, resolve issues if detected.
d) Post-maintenance performance inspection
- Run the generator in automatic and manual mode to
examine its conditions after maintenance.
dd) Finishing
- Close the generator’s door, clean the maintenance
area, put away the equipment and measuring devices in regulated places;
- Input all details and result of the maintenance
work in relevant forms, report to the supervisor;
- Complete the maintenance work and log the entire
process in the log.
6.2.2. Norm
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- Engineer at level 7/8: 0.25
- Engineer at level 5/8: 4.0
- Technician at level 5/7: 6.67
b) Norm for consumption of material
- The cost of material for maintenance work is 10%
of the cost of labor by statutory pay rate for maintenance work.
7. 2kVA generator
7.1. Test run of power generators (Test
run cycle: once per week)
a) Tasks
- Preparation
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
+ Prepare the load to run the test of the power
generator (with multi-speed motors);
+ Prepare the generator test run log.
- Pre-test equipment inspection
+ Check the levels of fuel, lubricant and motor
coolant, check the meters (if available) and the generator's functioning in
normal conditions;
+ Examine the exterior of the accumulators and
their terminals;
+ Check the working mode of automatic transfer
switches, open the circuit breakers’ contacts, disconnect the load;
+ Disconnect all load from the generator’s output,
connect the test load to the generator;
+ Check and handle the unsafe risks, if ensuing,
during the generator’s startup.
- Test run of electric generator
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
+ Start up the generator with the relevant button
or by hand. Shut down the generator in emergency if anomalies are detected;
+ Check the variables shown on the control panel
and meters (voltage, current, frequency, fuel level, lubricant level, etc.);
+ Run the generator without load in 10 minutes,
read the variables shown on the control panel and meters during this period;
+ Switch on the generator’s CB for its test run
under load;
+ Adjust the motor’s speed (i.e. load output) at
various levels in 15 minutes to observe the variables shown on the control
panel and meters;
+ Switch of the generator’s CB to disconnect the
test load, continue the generator’s no-load operation in 5 minutes;
+ Shut down the generator with the STOP button;
+ Total duration of test run: 30 minutes.
- Finishing
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
+ Recheck the contacts with power source, circuit
breakers’ state and automatic transfer switch system;
+ Log the generator’s test run.
b) Norm
- Labor norm (workload)
+ Technician at level 5/7: 0.125
- Norm for consumption of fuel
+ The cost of fuel for test run shall be equal to
the duration of the test run multiplied by the fuel consumption level specified
in Table 3, section 2.2., Part II - Norm for consumption, Chapter 2.
7.2. Electric generator maintenance (Maintenance
cycle: once per year)
a) Tasks
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
+ Peruse the literature and diagrams of the
equipment and processes;
+ Elaborate and assign the tasks of maintenance;
+ Prepare measuring devices, material, spare parts,
maintenance forms, premises and safety gears for maintenance work.
- Pre-maintenance equipment inspection
+ Examine the status of the lights on the
generator’s panel;
+ Run a test to verify the generator’s functioning
before maintenance;
+ Log the operating condition and variables
collected from the generator’s test run.
- Maintenance
Shut down, clean and disassemble the generator for
maintenance;
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
● Check the cleanliness (sediment, water and impurities)
and level of the motor lubricant, fuel and coolant, replace or refill them (if
necessary);
● Examine and tighten the straps of water pipes,
fuel pipes and lubricant pipes. If leakage is detected, pipes must be replaced
to avoid damage to the generator;
● Examine and change the filters of cooling
lubricant and fuel oil at periodic intervals (250 hours or 06 months);
● Examine, clean and, if necessary, adjust the
overheat protection unit, air filtering unit and shock absorber;
● Input the maintenance result into relevant forms.
+ Maintenance of electricity generation
component:
● Examine the functionalities of the control panel
and display by pushing the test button, resolve issues that may ensue;
● Use standard meter(s) to check and adjust the AVR,
exciter and measuring parts;
● Measure and calibrate the electrical insulation
of wires and covers according to the technical standards, impregnate and dry
the coils if necessary;
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
● Examine, clean and refit the rotor and stator;
● Run the test, examine and adjust parameters if
necessary;
● Examine the generator’s load bearing in
comparison with technical specifications (upon the shutdown of the power grid);
● Input the maintenance result into relevant forms.
+ Maintenance of the fuel storage and supply
system;
● Clean and examine entirely the fuel storage and
supply system, resolve leakage and damage if detected;
● Open all valves conveying fuel from the tank to
the machine and vice versa to release gas, sediments and water from the pipes.
+ Cleaning of the machine room:
● Clean the entire machine room;
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- Post-maintenance performance inspection
+ Run the generator in automatic and manual mode to
examine its conditions after maintenance.
- Finishing
+ Clean the maintenance area, put away the
equipment and measuring devices in regulated places;
+ Input all details and result of the maintenance
work in relevant forms, report to the supervisor;
+ Complete the maintenance work and log the entire
process in the log.
b) Norm
- Labor norm (workload)
+ Engineer at level 7/8: 0.25
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
+ Technician at level 5/7: 4.0
- Norm for consumption of material
+ The cost of material for maintenance work is 10%
of the cost of labor by statutory pay rate for maintenance work.
8. VHF antenna: 10 m - 35 m
(Maintenance cycle: 01 year)
8.1. Tasks
a) Preparation
- Prepare measuring devices, material, spare parts,
written materials, premises and safety gears for maintenance work;
- Elaborate and assign the tasks of maintenance.
b) Pre-maintenance equipment inspection
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- Log the conditions and parameters of the gears
fitted on the antenna.
c) Maintenance
- Remove dust from the antenna’s base and guy
ropes. Clear obstacles in 2-meter radius from (09) anchors;
- Use a tester to measure the ground resistance
value of the antenna’s lightning protection system. A value less than 10 ohms
is acceptable. Such measurement shall occur thrice at various positions.
- Maintenance of four guying levels
+ Maintain each guying level in the following
manner:
+ Replace the main guy ropes with mock wires (03
per mast), take down the main guy ropes (03 per mast);
+ Examine screw nuts, use a cutter to remove rusty
screw nuts that are not removable. Remove 06 high-frequency porcelain
insulators (06 screw nuts on each);
+ Clean, de-rust and lubricate turnbuckles, screw
nuts and guy ropes to prevent rust. Replace rusty and broken turnbuckles and
screw nuts;
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
+ Reinstall the guy ropes.
- Maintenance of antenna mast
+ Clean, de-rust and repaint the corrosive and
rusty joints and parts of the mast. Use a cutter or dissemble tool to severe or
discard irremovable rusty screw nuts and replace them;
+ Examine the contact of the mast and grounding
wires. Clean and refit the wires.
- Maintenance of lightning arrestor and antenna
mountings on the mast
+ Clean and examine the lightning protection
system, wires and grounding structure.
- Align the mast.
+ Observe the inclination and torsion of the mast
from various angles with measuring ropes, the tension and looseness of guy
ropes.
d) Post-maintenance performance inspection
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
dd) Finishing
- Clean the maintenance area, put away the
equipment and measuring devices in regulated places;
- Input all details and result of the maintenance
work in relevant forms, report to the supervisor;
- Complete the maintenance work and log the entire
process in the log;
8.2. Norm
a) Labor norm (workload)
- For an antenna mast of 10 to 20 m in height
+ Engineer at level 5/8: 6.0
+ Technician at level 5/7: 17.0
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
+ Engineer at level 5/8: 9.50
+ Technician at level 5/7: 28.5
b) Norm for consumption of material
- The cost of material for maintenance work is 10%
of the cost of labor by statutory pay rate for maintenance work.
9. AIS receiver (Maintenance
cycle: 06 months)
9.1. Tasks
a) Preparation
- Dispose other equipment or system(s) as replacement
for those under maintenance;
- Elaborate and assign the tasks of maintenance;
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- Gather the literature on maintenance and the
relevant samples;
- Prepare the premises and safety gears for
maintenance work.
b) Pre-maintenance equipment inspection
- Examine the functionalities of the equipment via
the actual deployment of AIS data;
- b) Initiate test applications of the AIS test box
to verify the equipment's conditions prior to maintenance;
- Log the conditions and variables collected from
the AIS test box.
c) Maintenance
- Disconnect the equipment from electric power.
Unplug cables on the equipment;
- Label the cables unplugged for identification;
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- Remove the AIS receiver from the rack then place
it at the maintenance position;
- Disassemble the equipment, conduct basic cleaning
of each component.
- Clean and examine the equipment powered off;
+ Clean circuit boards and their connectors with a
special cleaning oil;
+ Clean the jacks of the antenna cable and LAN
cable (or RS232 cable) on the equipment;
+ Replace the jacks of RJ45 cable(s), LAN cable(s) and,
if available, RS232 cable(s) that are rusty, broken, etc.
+ Detect changes in the color of components and
circuit boards (if any).
- Verify the parameters when the power is supplied.
+ Re-plug the cables into the equipment;
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
+ Use a multi-purpose meter to check if the voltage
level at pin 1 and pin 3 of the IC 2 on the circuit board is 5V and 3.3V,
respectively;
+ Check if the green and yellow lights on the
Ethernet card are flashing;
+ Check the signal lights A and B;
+ Refit the equipment’s cover.
d) Post-maintenance performance inspection
- Initiate test applications of the AIS test box to
verify the equipment's conditions after maintenance;
- Examine the functionalities of the equipment via
the actual deployment of AIS data.
dd) Finishing
- Insert the AIS receiver in its original state in
the rack;
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- Complete the maintenance work and log the entire
process in the log; Input all details and result of the maintenance work in
relevant forms, report to the supervisor;
- Clean the maintenance area, put away the
measuring devices and written materials in regulated places.
9.2. Norm
a) Labor norm (workload)
- Engineer at level 5/8: 1.00
- Technician at level 5/7: 1.00
b) Norm for consumption of material
- The cost of material for maintenance work is 10%
of the cost of labor by statutory pay rate for maintenance work.
10. Air conditioner: 9,000 BTU
- 18,000 BTU (Maintenance cycle: 06 months)
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
a) Preparation
- Peruse the literature and diagrams of the
equipment and processes, study the relevant samples;
- Elaborate and assign the tasks of maintenance;
- Prepare measuring devices, material, spare parts,
written materials, premises and safety gears for maintenance work;
b) Pre-maintenance equipment inspection
- Run a test to verify the generator’s functioning
before maintenance;
- Log the operating condition and variables
collected from the generator’s test run.
c) Maintenance
- Indoor unit maintenance:
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
+ Examine and clean the control circuit board and
sensor heads;
+ Examine, clean and lubricate the ball bearing of
the fan’s middle shaft;
+ Use meter(s) to check the voltage and current
levels of each phase;
+ Reassemble the components.
- Outdoor unit maintenance:
+ Remove the unit’s cover, clean components and
repaint rusty parts;
+ Examine gas pipe(s) and connectors to detect
leakage. Replace them if necessary;
+ Tighten the pipe clamp;
+ Reassemble all components.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
d) Post-maintenance performance inspection
- Turn on the air conditioner to verify its
conditions after maintenance;
- Use the control panel to check the equipment’s
functionalities.
e) Finishing
- Clean the maintenance area, put away the
measuring devices and written materials in regulated places;
- Input all details and result of the maintenance
work in relevant forms, report to the supervisor;
- Complete the maintenance work and log the entire
process in the log.
10.2. Norm
a) Labor norm (workload)
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- Technician at level 5/7: 1.00
b) Norm for consumption of material
- The cost of material for maintenance work is 10%
of the cost of labor by statutory pay rate for maintenance work.
11. AC 220V/DC 13.8V - 20A
converter (Maintenance cycle: 06 months)
11.1. Tasks
a) Preparation
- Peruse the literature and diagrams of the equipment
and processes, study the relevant samples;
- Elaborate and assign the tasks of maintenance;
- Prepare measuring devices, material, spare parts,
written materials, premises and safety gears for maintenance work;
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
b) Pre-maintenance equipment inspection
- Check the indicators of voltage level and
current, busbars, coil surface;
- Use meter(s) to measure voltage, ampere, input
and output currents of each phase of the voltage regulator and power supply;
- Switch to the backup voltage regulator then close
the circuit breaker to power it up to supply power to the entire system;
- Check if busbars in the voltage regulation
function for later maintenance. Shut down the voltage regulator and power
supply to carry out maintenance;
- Log all conditions of the equipment prior to
maintenance.
c) Maintenance
- Cleaning:
+ Remove the cover of the voltage regulator and
clean (primary and secondary) coils, busbars, controller board and motor(s);
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- Measure and adjust the output voltage level of
the regulator:
+ Check if the voltage level between the live wire
and neutral wire reaches 220V; if not, adjust the resistance to maintain the
voltage into the controller IC;
+ If the digital meter shows the voltage level at
220V but the regulator’s indicator meter displays a lower or higher variable,
calibrate the second meter mechanically by turning its adjusting screw(s).
Change the meter if such adjustment is ineffective.
- Examine and replace carbon brushes (busbars):
+ Examine, adjust or replace the carbon brushes’
springs of found feeble;
+ Examine carbon brushes and their surface in
contact with the coils to check if wear and dents are evenly spaced. Replace
carbon brushes or smoothen their surface if wear is excessive or wear and dents
are not evenly spaced.
- Examine the supply of power to the controller
board:
+ Measure the supply voltage for and operating
voltage into the controller circuit;
+ Adjust the voltage level metered to maintain the
nominal voltage level.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- Examine and tighten screws that convey voltage
into and out of the contactors to avoid sparks upon synchronization.
- Close the circuit breaker to power up the
operating regulator, then measure the input and output voltage levels check if
busbars are tilted or the fans and regulator emit unusual sound. If the test
result is satisfactory, switch off the circuit breaker to disconnect the
regulator from electric power.
dd) Finishing
- Reassemble the equipment;
- Clean the maintenance area, put away the
equipment and measuring devices in regulated places;
- Input all details and result of the maintenance
work in relevant forms, report to the supervisor;
- Complete the maintenance work and log the entire
process in the log.
11.2. Norm
a) Labor norm (workload)
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- Technician at level 5/7: 3.10
b) Norm for consumption of material
- The cost of material for maintenance work is 10%
of the cost of labor by statutory pay rate for maintenance work.
12. Uninterruptible power
supply: 3kVA - 10kVA (Maintenance cycle: 06 months)
12.1. Tasks
a) Preparation
- Peruse the literature and diagrams of the
equipment and processes, study the relevant samples;
- Elaborate and assign the tasks of maintenance;
- Prepare measuring devices, material, spare parts,
written materials, premises and safety gears for maintenance work;
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
b) Pre-maintenance equipment inspection
- Examine the UPS unit’s conditions in operation,
reboot the UPS unit to normal mode if it is in other modes;
- Test the UPS unit’s load to verify its capacity
for backing up the system;
- Review the input and output voltage levels of the
UPS unit, its indicator lights and handle issues if warnings ensue.
- Log the equipment’s conditions and parameters
prior to maintenance.
c) Maintenance
- Cleaning:
+ Set up another UPS unit as replacement for that
under maintenance;
+ Shut down and disassemble the UPS unit;
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
+ Reassemble the components in correct state.
- Examine the quality of accumulators:
+ Clean the accumulators, check if circuit boards
and jacks are in correct positions before running and measuring it;
+ Measure the voltage level of the accumulators and
replace those with technically unsatisfactory level of voltage;
+ Use a mock load and meter to specify the
accumulators’ capacity by discharge time.
- Examine bypass board, inverter board, rectifier
and warning light(s) on the unit and replace broken components, if detected, on
the controller board.
- Examine the power intake component to maintain
the supply voltage for bypass contactors, output contactors and fan(s) while
measuring the UPS unit’s output and input voltage levels.
d) Post-maintenance performance inspection
- Recheck the levels of input and out voltage, the
accumulators’ voltage and signal lights on circuit boards;
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- Put the UPS unit in use to verify its load
capacity after maintenance.
dd) Finishing
- Reassemble the equipment;
- Clean the maintenance area, put away the
equipment and measuring devices in regulated places;
- Input all details and result of the maintenance
work in relevant forms, report to the supervisor;
- Complete the maintenance work and record the
entire process in the log.
12.2. Norm
a) Labor norm (workload)
- Engineer at level 5/8: 2.35
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
b) Norm for consumption of material
- The cost of material for maintenance work is 10%
of the cost of labor by statutory pay rate for maintenance work.