THE
PRIME MINISTER OF GOVERNMENT
-------
|
SOCIALIST
REPUBLIC OF VIET NAM
Independence - Freedom - Happiness
----------
|
No.
87/2006/QD-TTg
|
Hanoi,
April 20, 2006
|
DECISION
APPROVING THE MASTER PLAN ON
SOCIO-ECONOMIC DEVELOPMENT OF LAI CHAU PROVINCE IN THE 2006-2020 PERIOD
THE PRIME MINISTER
Pursuant to
the December 25, 2001 Law on Organization of the Government;
At the proposal of the People's Committee of Lai Chau province in Report No.
578/TTr-UBND of October 12, 2005, and Document No. 10/UBND-TH of January 9,
2006, and the Ministry of Planning and Investment in Official Letter No.
1532/BKH/TD&GSDT of March 10,2006, regarding the master plan on
socioeconomic development in the 2006-2020 period,
DECIDES:
Article
1.- To approve the master plan on socioeconomic development of Lai Chau
province in the 2006-2020 period, with the following principal contents:
I.
DEVELOPMENT VIEWPOINTS:
To tap to the
utmost internal resources, combined with supports of the central government and
the whole country, speed up economic growth, gradually narrow the development
gap with other provinces in the region and ensure conformity with the process
of international economic integration.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Economic
development must be harmoniously combined with the settlement of such pressing
social issues as hunger eradication and poverty reduction, sedentarization,
raising of public knowledge, training of cadres, especially grassroots cadres,
ethnic minority cadres and female cadres; to properly implement ethnicity
policies, assist ethnic minority inhabitants in having a stable life, escaping
from the particularly difficult state and enjoying a gradually improved
material and spiritual life.
To associate
the province's socio-economic development objectives with the performance of
national strategic tasks in the province, namely, to build the political system
strong, build up and strengthen defense and security, build the great unity
block among ethnic minorities living in the province, firmly protect national
independence, sovereignty and territorial integrity in connection with building
a border of peace, friendship, cooperation and long-lasting stability.
II.
DEVELOPMENT OBJECTIVES
1. General objectives
To accelerate
economic growth; markedly improve socio-economic infrastructure; bring into
full play strengths of a border-gate province, its natural resources, minerals,
hydropower, land and climate for development of various economic activities; to
concentrate on hunger eradication and poverty reduction, basically complete
sedentarization work; to conserve and develop cultural identities of ethnic
minorities, improve the people's material and spiritual life; to ensure defense
and security, political stability and firmly protect sovereignty over the
national boundary.
In the
2006-2010 period, to accelerate economic growth, basically lift Lai Chau out of
the state of particular difficulty, narrow the development gap between the
province and other provinces in the region and the whole country. By 2020, the
province will be out of the state of underdevelopment.
2.
Orientations for development of branches and domains
a/ Economic
branches and domains
- Economically,
to achieve average per-capita GDP (according to current prices) of VND 7
million (two times over 2005, equal to 45% of the country's average) by 2010;
and of VND 24.8 million by 2020 (equal to 60-65% of the country's average).
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2006-2010
period
2006-2020
period
GDP
14-15%
12.6%
Agriculture,
forestry, fisheries
5-6%
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Industry,
construction
26-27%
18%
Services
17-18%
13.7%
To restructure
economy along the line of quickly increasing industry-construction and service
ratios and reducing agriculture and forestry ratios:
Economic
structure
2010
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Agriculture,
forestry, fisheries - industry -service
32-35-33%
20-45-35%
To increase
budget revenues in the locality, striving for over VND 160 billion by 2010 and
over VND 500 billion by 2020.
To quickly
increase the province's export value, striving for the total value of USD 10
million/year by 2010 and over USD 30 million by 2020.
- Regarding
agriculture and rural development.
To vigorously
step up economic restructuring within agriculture, choose plant varieties and animal
species that are the locality's strengths for prioritized development toward
commodity production connected with processing industry and major local and
export markets.
+ Cultivation:
To develop food
production, striving to ensure food security in the locality. To promote
intensive cultivation, increase crops, extensively apply widely technologies
and advanced cultivation techniques to production in order to increase rice and
maize yields. To establish concentrated high-yield food production zones in
areas where conditions permit. By 2010, total food output shall surpass 150,000
tons and average per capita food output reach about 400 kg per year; by 2020,
these targets shall be over 165,000 tons and about 370 kg per year
respectively.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
+ Husbandry:
To supply
high-quality animal breeds, provide veterinary services, and mobilize locals to
change their husbandry practices. Livestock herds shall increase by over 6%
throughout the period, particularly 6-7% in the 2006-2010 period. To increase
the numbers of buffalo and cow herds: by 2010, there will be 111,500 buffaloes,
20,700 cows, and annually 8-10 thousand tons of buffaloes and cows in live
weight supplied to the market.
To develop
aquaculture, exploit existing water surface areas, develop more ponds and
lakes; to proceed to concentrated, large-scale aquaculture when Son La, Lai
Chau, Huoi Quang, Ban Chat hydropower reservoirs are completely built.
+ Forestry:
To protect and
develop existing forests, striving to increase forest coverage to 45% by 2010
and over 60% by 2020 from 37.5% in 2005, in order to promote the functions of
headwater protective forests and regulate water sources for hydropower
projects. To select a tree structure which promotes headwater protection and
brings about high economic benefits. To associate afforestation with zoning off
for tending and regeneration of existing forests, establish material areas for
the development of paper, chipboard and household furniture industries. To
conserve primitive forests and establish a nature conservation zone on the
southwest side of Hoang Lien Son mountain range.
To adopt proper
policies on investment in particularly disadvantaged highland and border
communes facing shortage of agricultural land to help them switch to live on
afforestation and tending and protection of protective forests.
To strive to
plant 10,000 new hectares of forests in the 2006-2010 period and 30,000 new
hectares of forests in the 2011-2020 period. To zone off for tending and
regeneration an additional area of 200,000 ha of forests, mostly in Muong Te
and Sin Ho districts.
+ Rural construction:
To elaborate a
planning on population redistribution and sedentarization for ethnic minority
people to stabilize and improve their lives, with priority given to population
redistribution in areas meeting with a shortage of residential and production
land or having particularly difficult living conditions, areas facing high
risks of land slide, and Vietnam-China border areas. Coupled with the
construction of irrigation projects and places for resettlement shall be the
reclamation of at least 5,000 ha of wet rice fields and terraced fields in the
2006-2020 period, with 3,000 ha in the 2006-2010 period alone.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
To develop
trades, effectuate rural economic restructuring, establish new craft villages
and agricultural and forestry farms.
- Regarding
industries-construction
To concentrate
on developing industries in which the province has strengths, such as
hydropower generation, processing of agricultural and forest products,
production of construction materials, mineral exploitation, traditional
handicrafts, and industrial establishments that serve the resettlement programs
for hydropower projects.
+ Energy
(hydropower) industry
To orient the
building of Lai Chau, Ban Chat and Huoi Quang hydropower plants. To survey,
plan and formulate mechanisms and policies to attract enterprises to invest in
building small- and medium-sized hydropower projects.
+ Mining
industry
To encourage
enterprises to survey, prospect and invest in exploiting and processing
minerals in gold, rare earth, copper, lead and zinc mines, and organize the
exploitation and gathering of minerals in smaller mines in the locality.
+ Construction
material production industry
To orient the
establishment of Muong So industrial park (cement production, mineral
processing and construction material production) and certain industrial
clusters. To research, explore, exploit and process black, colored and white
marbles for construction and export. To exploit sand, rock and gravel to meet
the province's construction demands. To build tunnel brick factories and cement
factories to meet civil construction demands and hydropower projects in the
province.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
To raise the
production and business efficiency of Lai Chau paper plant; to set orientations
for increasing the capacity and improving the quality of products of tea
factories, and set up agricultural product processing establishments in
concentrated production areas.
+ Other
industries
To set
orientations for developing the engineering of hand-held tools suitable to
local production practices and encourage the private sector to invest in
building mechanical workshops in Lai Chau town.
- Regarding
trade-services
To accelerate
the development of services to account for a higher ratio in the province's
GDP.
To
synchronously develop the system of trade centers in towns, townships and
centers of commune clusters, giving, first of all, priority to building several
markets in border areas. To ensure the supply of essential goods for
highlanders and stabilize market prices.
To develop
holiday tourism, eco-tourism and ethnic cultural tourism in combination with
the preservation and promotion of ethnic cultural identities, turning tourism
into an important industry and a driving force for socio-economic development
in the province, materializing the policy direction on hunger eradication and
poverty reduction and firm preservation of security, defense, social order and
safety. Tourist activities shall be directed toward exploiting the potential of
the Hoang Lien Son mountain pass peak, Tien Son cavern, Tien Binh thermal
spring, Tac Tinh waterfall and Dong Pao lake in close connection with developing
restaurants and hotels in Tarn Duong town; to develop Lai Chau town into a
tourist center of the province; to properly organize tours and tourist routes,
especially international travel services to attract Chinese visitors coming
through Ma Lu Thang border gate; to invest in developing Sin Ho plateau into a
holiday tourist resort, a place for ecological research, pharmaceutical
materials, flowers, bonsai, tropical fruit trees and peculiar ethnic cultural
traits in the province; to invest in embellishing and building a tourist
complex of Le Loi King stele and the Van Long mountain pass relic area in
association with eco-tourism in the reservoirs of Son La and Lai Chau
hydropower plants and cultural traits of ethnic minorities in Muong Te.
Transport
services: To develop cargo and passenger transport services along
inter-provincial and intra-provincial transport routes and, when conditions
permit, international transport services, exploit waterway transport routes
after the hydropower reservoirs are completely built.
b/ Regarding
infrastructure development
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
In 2006, there
will be motorways to 100% of commune centers and by 2010 and 2020 there will be
70% and 100% respectively rural roads useable in all seasons in the year.
To attach
importance to building a diversion road of national highway 4D running through
Lai Chau town; upgrading sections of national highway 4D running through towns
and townships, national highway 32, stage II; flood-sheltering sections of
national highway 12, provincial highway 127, and national highway 279. To
attach importance to building interconnected roads, upgrading provincial and
district roads linking to national roads. To continue investing in rural roads
running to the centers of communes without motorways. To renovate, upgrade and
ensure rural roads usable in all seasons in the year.
For waterways
and port system: To survey and build several ports along Da river, such as Pac
Ma, Po Lech, Nam Hang, Chan Nua and Pa Ha ports for developing waterway
transport after the big hydropower projects are completely built in the
locality.
- Irrigation
To prioritize
investment in irrigation development, step by step meeting demands for water
for agriculture, industrial production and daily life.
- Daily-life
water supply and electricity supply.
+ To develop
the system of daily-life water supply: To invest in upgrading and building new
clean water supply systems for towns, townships and industrial clusters. To
continue with investment in building daily-life water supply systems for rural
areas, with priority given first to upland villages and villages facing
shortage of daily-life water. By 2010, clean water will be provided for over
80% of urban population and 30% of rural population and, by 2020, the needs of
all the population will be basically met.
+ To develop
the electricity grid: By 2010, the national electricity network will reach 100%
of communes and electricity will be available to 80% of households. By 2020,
electricity will be available to meet the needs of all the population.
- Development
of the urban system.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
In the
2011-2020 period, to continue renovating and upgrading the townships of Than
Uyen, Than Thuoc, Sin Ho and Muong Te; to build new townships of Nam Tarn
(lowland Sin Ho), Huoi Luong (Muong Te) in parallel with the relocation and
resettlement for the building of hydropower projects and the adjustment of the administrative
boundaries of some districts. To upgrade Lai Chau town into grade-Ill urban
center and a city by 2015.
c/ Social
domains
- Regarding
education and training
To consolidate
and maintain the results of primary education universalization and illiteracy
eradication; to achieve the standards of primary education universalization
among the eligible age group by 2008; complete junior secondary education
universalization by 2009; complete senior secondary education universalization
by 2015. Annually, the number of pupils drawn to school will increase by 4.47%;
by 2010, there will be 20,087 preschool pupils, 49,994 primary pupils, 27,610
junior secondary school pupils and 10,611 senior secondary school pupils.
To set
orientations for expanding boarding schools for ethnic minority pupils, develop
semi-boarding schools where pupils are fed by locals in centers of commune
clusters and communes. To speed up the implementation of the program on
building school buildings and classrooms solid, expanding existing junior and
senior secondary schools and building new ones to meet the requirements of
junior secondary education universalization in the 2006-2010 period and the
requirements of senior secondary education universalization in the 2011-2015
period. To increase teaching and learning equipment under the general education
renewal program. To invest in building dwelling houses for education
administrators and teachers, particularly in schools situated in deep-lying,
remote and border areas.
To set
orientations for preparing conditions for building soon such training schools
as community colleges, a provincial politics school, a vocational training
school, a provincial military school and politics training schools in
districts, towns, etc., for training grassroots cadres, particularly ethnic
minority cadres, female cadres, and raising the ratio of trained laborers. To
raise the percentage of trained laborers to 25% by 2010 and to over 45% by
2020.
- Regarding
public healthcare
By 2010, 50% of
communes will have health stations up to national standards as set by the
Ministry of Health; to strive to achieve five medical doctors per 10,000
population and 50% of communes having medical doctors. By 2020, there will be
over 90% of commune health stations meeting national standards and 10 medical
doctors per 10,000 population.
To consolidate
and expand the network of medical establishments and community healthcare. To
basically control malaria and tuberculosis epidemics and effectively prevent
HIV/AIDS. To reduce the malnutrition rate among under-five children to 20% by
2010 and reduce the underweight rate among newborns to under 5%, ensuring that
over 96% of children are fully immunized. To expand health insurance and forms
of healthcare for ethnic minority people in deep-lying and remote communes.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
- Regarding
population development
To carry out
family planning and reproductive health programs with a view to improving
population quality. The average population growth rate will be 2.2% per year in
the 2006-2010 period, of which the natural growth rate will be 1.8% and the
mechanical growth rate, 0.4%, the population will be 368,000 by 2010 and
445,000 by 2020.
To encourage
inhabitants from elsewhere to settle and build new homeland in Lai Chau in
accordance with the province's planning and plan, including those from lowland
areas and non-agricultural households from the areas of the Son La hydropower
reservoir in Dien Bien, and from Son La, etc., so as to have more human
resources for the province's socio-economic development.
- Regarding
culture and information
To improve
cultural-information benefits, preserve and promote cultural values of ethnic
minority groups in combination with combating backward habits that hinder
development. All communes will have telephone lines and commune post-cultural
points where locals can have access to newspapers, books and information. To
set orientations for investing in building provincial libraries, cultural
centers and museums, district libraries and cultural houses, and commune
cultural houses. To renovate and embellish historical and cultural relic areas,
conserve cultural heritages in the hydropower reservoir areas. To build village
cultural institutions suitable to the cultural tradition of every ethnic
minority. Annually, 100% villages and street quarters will register to be
cultured units, of which at least 50% will be recognized to meet district-level
or provincial-level standards. By 2010 and 2020, 50% and 70% of villages will
respectively achieve the title of cultured village.
To extensively
develop mass physical training and sports activities, paying attention to
traditional sports of ethnic minority groups. To step by step build and promote
high-achievement sports, strive to win medals in regional and national ethnic
minority sports tournaments. To set orientations for building sport training
and competition facilities in towns and townships, while all communes and wards
will have land areas or places reserved for physical training and sport
activities.
To build the
provincial television station and radio station so as to expand their
broadcasting coverage, and develop television wave-receiving stations in
villages where electricity conditions permit.
- Information:
By 2010, 100% of communes will have Internet at their centers; 100% of
townships will be covered with mobile phone waves. By 2020, the information
technology use needs of all inhabitants shall be basically meet. By 2010, over
90% of households will be able to listen to the radio and over 80% of
households watch television. Radio and television programs broadcast in ethnic
minority languages will be longer. By 2020, the radio and television needs of
all inhabitants will be basically met. The entire-province post and
telecommunications network and the telephone network from the province to
communes will be further modernized.
- Regarding
hunger eradication and poverty reduction and employment
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Annually,
4,000-4,500 new jobs will be created. Labor restructuring will be accelerated
to create more jobs and increase social productivity along the line of
industrialization and modernization. The rural labor time proportion will
increase to 78-80% and the unemployment rate in urban areas will drop to under
3%. Labor quality will be improved to help increase the economy's productivity
and efficiency.
d/ Regarding
relocation and resettlement for the building of big national hydropower
projects in the locality.
In the
2006-2012 period, 9,000 households residing in the to-be-inundated areas of Son
La and other hydropower projects will be relocated, of which 6,000-7,000 will
be completely relocated in the 2006-2010 period. In the immediate future, to
concentrate on properly organizing relocation and resettlement work for the
building of Son La hydropower project according to the planning already
approved by the Prime Minister. At the same time, to prepare conditions for the
resettlement in service of the building of Ban Chat, Huoi Quang and Lai Chau hydropower
projects.
e/ Spatial and
territorial development planning
Orientations
for development of three economic areas will be as follows:
- The
motivating economic area along national highways 32 and 4D (covering Lai Chau
town, and Phong Tho, Tarn Duong and Than Uyen districts): To develop border
gate trade, service and other economic activities, develop the production of
agricultural and forest commodities and the agricultural and forest product
processing industry with tea, rice, cardamon, buffalo and cow meat, milk as
major commodities, mineral exploitation and processing and production of
building materials, etc.
- The Da river
forest-agricultural eco-economic area (covering two districts of Muong Te and
lowland communes of Sin Ho district): To zone off for tending and protection
existing natural forests, strongly develop the planting of protective forests,
rearing of buffaloes and cows, and production of pharmaceutical materials; to
make use of rivers, national highway 12 and provincial highway 127 for
developing transport services, eco-tourism and forestry product-processing
industry. To make plans for developing the rearing, exploitation and processing
of aquatic resources, and efficiently exploit water surface areas of hydropower
reservoirs.
- The economic,
eco-tourism, ethnic culture and high-quality agriculture area in Sin Ho
plateau: To develop this area into a resort for eco-tourism and cultural
tourism in association with development of a high-quality agriculture and the
growth of herbs, flowers and tropical fruit trees.
f/ Adjustment
of administrative boundaries
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
In the
2011-2015 period, to study, divide and adjust the administrative boundaries of
Muong Te, Sin Ho and Than Uyen districts so as to have
a stable number of seven districts and one town.
g/ To build and
incrementally modernize working offices of Party and mass organizations and
state agencies.
In the
2006-2010 period: To prioritize the building of a system of working offices of
provincial-level Party and mass organizations and state agencies in Lai Chau
town, of district-level agencies in Phong Tho and Tarn Duong townships; to set
orientations for building solid working offices for communes where new offices
have not been built yet. In the 2011-2020 period, to continue renovating,
upgrading and expanding deteriorated offices with working areas of under 70% of
the standard or limit set for the use of working offices.
III.
IMPLEMENTATION SOLUTIONS:
- To
scrutinize, adjust and supplement the plannings of branches and domains and the
plannings of economic areas; to improve the quality of construction plannings,
etc., serving as a basis for socio-economic development and defense and
security maintenance. To properly perform investment planning and preparation
work.
- To develop
human resources, prioritize training of local cadres, female cadres and ethnic
minority cadres, involve village patriarchs and chiefs in motivating the people
to properly implement policy directions and policies of the Party and State. To
adopt special preferential policies for cadres working in border communes and
particularly disadvantaged communes. To set up a provincial vocational training
center to help improve the quality of trained laborers, particularly those
working in cottage industries and handicrafts and agricultural and forestry
product processing. To increase numbers of educational staff, healthcare
workers, border guards and agricultural, forestry and fishery extension cadres.
- To formulate
mechanisms and policies to attract investment, trade promotion programs, etc.
- To step up
the application of scientific and technological advances. To adopt preferential
policies to attract talented persons.
To mobilize
resources for investment:
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
- Investment
capital from enterprises and the population is estimated to account for 40-45%
in the investment capital structure. In order to increase this capital source,
it is necessary to carry out administrative reform, simplify procedures in the
investment domain and take measures to encourage the people and enterprises to
invest in carrying out and expanding production and business activities in the
province.
- The
province's investment capital demand in the 2006-2020 period will far exceed
its resources and capabilities. Therefore, Lai Chau province should work out
capital mobilization plans for each period, arrange and select priority
projects and apply specific and proper measures to attract investment capital,
ensuring the achievement of set objectives.
- To strengthen
and expand production relations after the models of household economy, farm
economy and cooperative economy. To enhance the role of state economy in
ensuring the supply of consumer goods, input factors and gathering and sale of
products for farmers. To accelerate the equitization and transformation of
ownership of state enterprises managed by the province. To encourage and
facilitate private enterprises and cooperatives in the production and
processing of agricultural and forestry products.
- To
scrutinize, supplement and promulgate mechanisms and policies for development.
- To enhance management,
exploitation and efficient use of natural resources in association with
environmental protection.
- To
consolidate defense and security.
- To build the
political system and the contingent of cadres at all levels capable of meeting
the requirements of their tasks.
IV.
PROGRAMS AND PROJECTS PRIORITIZED FOR INVESTMENT RESEARCH
- Programs
prioritized for development: (1) hunger eradication and poverty reduction
program; (2) socioeconomic development program; (3) program on resettlement
for the building of Son La and other hydropower projects; (4) border-gate
economic development program; (5) human resource training and political system
quality improvement program; (6) defense and security maintenance program.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Article 2.- The approved master plan shall serve as the
basis for the elaboration, submission for approval and materialization of
specialized plannings (construction planning, land use planning and plan and
other specialized plannings) and investment projects in the province according
to regulations.
Article
3.- The People's Committee of Lai Chau province is hereby assigned to base
itself on the province's socio-economic development objectives, tasks and
orientations stated in the approved master plan and coordinate with concerned
ministries and branches in directing the elaboration, submission for approval
and implementation of the following contents according to regulations:
- Formulating a
planning on development of the system of urban centers and population areas,
construction planning, land use planning and plan, branch and domain
development plannings, with a view to ensuring comprehensive and coordinated
development.
- Studying,
formulating, promulgating or submitting to competent state agencies for
promulgation (for issues beyond its jurisdiction) mechanisms and policies
suitable to the province's development requirements in each period in order to
attract and mobilize resources for the materialization of the master plan.
Article
4.- Ministries, ministerial-level agencies and Government-attached agencies
are hereby assigned to assist the People's Committee of Lai Chau province in
studying and formulating the above-said plannings; at the same time study,
formulate and submit to competent state agencies mechanisms and policies in
response to the socio-economic development requirements of Lai Chau province in
each period in order to mobilize and efficiently use resources, stimulate and
attract investment to ensure the proper materialization of the province's
socio-economic development objectives, tasks and orientations defined in the
master plan report. To step up investment in building projects which are of
certain scope and nature significant to the province's development and in which
investment has been decided. To study, adjust and add to branch development
plannings and investment plans related projects which are expected to be
invested in as stated in the master plan report.
Article
5.- This Decision takes effect 15 days after its publication in "CONG
BAO."
Article
6.- The president of the People's Committee of Lai Chau province,
ministers, heads of ministerial-level agencies, and heads of
Government-attached agencies shall have to implement this Decision.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
APPENDIX
LIST OF PROGRAMS AND PROJECTS
PRIORITIZED FOR INVESTMENT RESEARCH IN THE 2006-2010 PERIOD
(Promulgated together with the Prime Minister's Decision No. 87/2006/QD-TTg of
April 20, 2006)
Serial number
Names of investment projects
Location
Design capacity
Investment capital (VND billion)
Capital sources
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
A
Industries
1
Ban Chat
hydropower project
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
220 MW
3,140
Domestic
capital & loan
2004-2010
2
Lai Chau
hydropower project
Muong Te
1,200 MW
24,000
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2010-2020
3
Building of
some small hydropower projects in some districts
1-30 MW
100
Enterprise
capital
2005-2020
4
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Phong Tho
35,000
tons/year
600
Domestic
capital
2006-2009
5
Lai Chau town
tunnel brick factory
Lai Chau town
25 mil.
bricks/year
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
-
2006-2010
6
Lowland Sin
Ho tunnel brick factory
Sin Ho
15 mil.
bricks/year
3
-
2006-2010
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Tarn Duong
tunnel brick factory
Tarn Duong
15 mil.
bricks/year
3
-
2006-2010
8
Than Uyen
tunnel brick factory
Than Uyen
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
3
-
2006-2010
B
Agriculture,
forestry, fisheries
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
1
Development
of Tarn Duong tea area in association with development of Lai Chau town
Tarn Duong - Lai
Chau town
5
2005-2010
2
Development
of Than Thuoc tea area in association with Ban Chat hydropower project
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
5
2005-2010
3
Development
of fruit trees
5
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2005-2010
4
Project on
development of paper material area along national highways 12, 4D and 32
Within
province
5
2006-2015
5
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
5
Before and after 2010
6
High-quality
beef cow development project
Within
province
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2005-2010
7
Project on
high-yield intensive cultivation in Binh Lu rice field, Than Uyen
Binh Lu
5
2005-2010
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Communication
1
Upgrading of
national highways 12, 32,4D and 279
Within
province
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
800
WB, govt,
bonds
2005-2020
2
National
highway 4D's bypass section through Lai Chau town
Section
through Lai Chau town
10 km
450
Govt, bonds
-Ministry of Transport
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
3
Pa Tan - Hua
Bum - Muong Te - Pac Ma road (Transport Ministry)
Pa Tan -Muong
Nhe
166 km
400
Govt, bonds
-Ministry of Transport
2006-2010
4
Pa Tan -
Phong Tho - Bat Sat (Lao Cai) road
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
80 km
200
Govt, bonds
-Ministry of Transport
2008-2012
5
Muong Kim -
Muong La road
Within
province
40 km
150
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2005-2010
6
Upgrading of
Ta Ghenh - Nam Pay road
Ta Ghenh -Nam
Pay
10 km
31
ODA (DIC)
2005-2007
7
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Sin Ho
45 km
66.2
TDC& other
capital
2005-2008
8
Upgrading of
Chieng Chan -Sin Ho - Nam Loong road
Sin Ho
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
9
Upgrading of
Khong Lao -Dao San - Si Lo Lau road
Phong Tho
72 km
144
2006-2008
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Upgrading of
Seo Leng - Pa Khoa - Noong Hoe - Pu Sam Cap road
Seo Leng - PuSam
Cap
59 km
118
Govt, bonds
2006-2007
11
Than Thuoc -
Nam Can - Nam So - Noong Heo road
Than Uyen
-Sin Ho
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
100
Govt, bonds
2006-2008
12
Upgrading of
Lai Chau town -Ban Hon - Binh Lu road
Lai Chau town
- Tarn Duong
23 km
34
Resettlement
capital & other capital
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
13
Upgrading of
Muong So -Then Sin - Tarn Duong road
Phong Tho
-Tarn Duong
29 km
58
14
Bum Na - Pa
Ve Su road
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
20
17
ODA (JBIC)
2005-2010
15
Da river -
Nam Mann road
Muong Te
70
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2005-2015
16
Road to Mu Ca
commune center
Muong Te
17 km
34
WB3
2005-2015
17
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Sin Ho
41 km
70
2005-2015
18
Nam Cuoi -
Nam Han road
Sin Ho
25 km
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Resettlement
capital
2005-2010
19
Nam Khao - Ta
Tong road
Muong Te
26 km
30
2005-2015
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Nong Heo -
Nam Coong -Nam Cuoi road
Sin Ho
36 km
60
Resettlement
capital
2005-2015
21
Ta Ngao - Nam
Nguyen -Nam Ngap road
Sin Ho
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
60
Resettlement
capital
2005-2015
22
Ma Lu Thang -
Ma Ly Chai road
Phong Tho
25 km
55
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
23
Nam Ty - Nam
Cay road
Muong Te
50
2005-2015
24
Ta Ngao - Nam
Chan - Pa Ha cluster road
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
20 km
50
2005-2015
25
National
highway 12 - Nam Ban commune center road
Sin Ho
16 km
45
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2005-2015
26
Nam Doong -
Pu Dao road
Sin Ho
13 km
15
Resettlement
capital
2005-2007
27
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Ka Lang -Thu
Lum
24.4 km
30
Govt, bonds
2006-2008
28
Road to Ka
Lang commune center
Ka Lang Pac
Ma -
24.2 km
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Govt, bonds
2006-2007
29
Nam Lan - La
Pe road
Nam Lan-LaPe
20 km
21
Govt, bonds
2006-2007
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Muong Te - Pa
U road
Muong Te -PaU
22.4
28
Govt, bonds
2006-2007
31
Upgrading and
asphalting several provincial highway sections, district roads, rural roads
and roads to commune centers
Within
province
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
400
ADB, WB
2005-2020
D
Irrigation
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
1
Hoang Ho
reservoir (Sin Ho township)
Sin Ho town
70
27
Govt, bonds
2006-2007
2
Nam Mung 1
irrigation system and Pa Khoa reservoir
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
150 ha, 2 crops,
320 ha, 1 crop. Daily life water for 2,500 inhabitants
32
Govt, bonds
2006-2007
3
Nam Ma Dao
reservoir
Sin Ho
70
27
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2006-2007
4
Dong Pao reservoir
Ban Hon
800
120
Govt, bonds
2006-2007
5
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Than Uyen
700
60
Govt, bonds
2006-2007
6
Muong Than
irrigation complex
Than Uyen
1,700
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Govt, bonds
2006-2007
7
Than Thuoc
irrigation complex
Than Uyen
385
19
Govt, bonds
2006-2007
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Binh Lu
irrigation complex
Tarn Duong
1,770
208
Govt, bonds
2006-2008
9
Phong Tho
irrigation complex
Phong Tho
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
70
Govt, bonds
2006-2008
10
Dao San
irrigation complex
Phong Tho
460
84
Govt, bonds
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
11
Lowland Sin
Ho irrigation complex
Sin Ho
710
80
Govt, bonds
2006-2008
12
Muong Mo -
Nam Hang irrigation complex
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
440
37
Govt, bonds
2006-2008
13
Other repair
and upgrading projects
Within
province
50
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2006-2015
E 1
Urban
infrastructure, trade and tourism Urban infrastructure
1
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Lai Chau town
1,000 ha
1235
2005-2010
2
Phong Tho
township urban infrastructure
Phong Tho
60 ha
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2005-2010
3
Tarn Duong
township urban infrastructure
Tarn Duong
60 ha
105
2005-2010
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Sin Ho
township urban infrastructure
Sin Ho
30 ha
50
2005-2010
5
Muong Te
township urban infrastructure
Muong Te
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
50
2005-2015
6
Than Uyen
township urban infrastructure
Than Uyen
30 ha
50
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
7
Binh Lu
townlet urban infrastructure
Tarn Duong
10 ha
20
2006-2010
8
Muong So
townlet urban infrastructure
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
10 ha
20
2008-2015
9
Than Thuoc
township urban infrastructure
Than Uyen
10 ha
20
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2010-2015
10
Other urban
infrastructure
60 ha
120
2010-2020
11
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Lai Chau town
30
After 2010
II
System of
public offices
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
1
Provincial
agencies' office building (block)
Lai Chau town
34,130 m2
310
2006-2008
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Tam Duong
district agencies' office building (block)
Tam Duong
2,200 m2
50
2006-2007
3
Phong Tho district
agencies' office building (block)
Phong Tho
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
50
2006-2007
4
Provincial
conference -cultural center
Lai Chau town
5,000 m2
52
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
5
Tam Duong
district cultural center
Tam Duong
3,000 m2
15
2006-2007
6
Phong Tho
district cultural center
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
3,000 m2
15
2006-2007
7
Commune
office buildings
Within
province
23,450 m2
105
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2006-2015
8
Upgrading and
repair of district office buildings
Within
province
2,000 m2
50
2015-2020
III
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
1
Provincial
trade center
Lai Chau town
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2005-2010
2
Border-gate
economic zone infrastructure
Phong Tho
43 ha
140
2002-2008
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Ma Lu Thang
border-gate market
Phong Tho
10,000 m2
5
2007-2008
4
Lai Chau town
market
Lai Chau town
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
13
2005-2007
5
Township
markets in 6 districts of the province
6 districts
VNDIObil./ market
60
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
IV
Tourism
infrastructure
1
Lai Chau town
lake - park
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
40
2005-2010
2
Lai Chau town
entertainment center
Lai Chau town
20
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
After 2010
3
Hoang Lien
Son mountain pass tourist resort
Tam Duong
20
2006-2010
4
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Tam Duong
50
After 2010
5
Dong Pao lake
- Hon village eco-tourist resort
Tarn Duong
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
After 2010
6
Sin Ho
plateau eco-tourist resort
Sin Ho
20 ha
40
After 2010
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Tourist
infrastructure of Le Loi King historical relic and Da river reservoir
cultural area
Sin Ho
20 ha
8
2007-2010
F
Culture,
Social Affairs (healthcare, education, etc.)
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
I
Healthcare
infrastructure
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
1
Provincial
general hospital town
Lai Chau
300 beds
230
2005-2010
2
Sin Ho
general hospital
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
50 beds
40
2005-2015
3
Tarn Duong
district general hospital
Tarn Duong
50 beds
40
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2005-2015
4
Phong Tho
general hospital
Phong Tho
50 beds
40
2005-2010
5
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Lai Chau town
50 beds
40
2005-2010
6
Upgrading of
Muong Te general hospital
Muong Te
50 beds
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2007-2010
7
Upgrading of
90 health stations up to standards
Whole
province
5 beds/ station
45
2016-2020
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Traditional
medicine hospital
Lai Chau town
50 beds
30
After 2010
9
Specialized
tuberculosis hospital
Lai Chau town
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
20
2005-2015
10
Regional
general hospital and
Within
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
hospitals of
to be-divided districts
province
50
After 2010
II
Education
and training infrastructure
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
1
Provincial
ethnic minority boarding school
Lai Chau town
500 students
15
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2006-2007
2
Tarn Duong
district ethnic minority boarding school
Tarn Duong
200 students
4
2006-2007
3
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Phong Tho
200 students
4
2006-2007
4
System of
general education schools
Whole
province
2,400 students
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2006-2010
5
System of
preschools
Whole
province
500 pupils
30
2006-2010
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Provincial
politics school
Lai Chau town
300 students
15
2006-2008
7
Continuing
education center
Lai Chau town
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
10
2006-2008
8
Community
college
Lai Chau town
500 students
20
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
9
Provincial
military school
Lai Chau town
300 students
10
2006-2008
10
Building
schools solid outside program 159
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
150
After 2010
11
Provincial
vocational training school
Lai Chau town
500 students
12
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
After 2010
12
Community
learning centers in communes
Whole
province
40
2008-2015
III
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
1
Provincial
radio broadcasting and transmission center
Lai Chau town
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
After 2010
2
Program on
broadcasting coverage in dead spots
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Provincial
children and youth cultural palace
Lai Chau town
15,000 m2
25
After 2010
4
Building of
children and youth palaces in districts
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
60
After 2010
5
Cultural and
sport houses in districts
500 m2
25
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
6
Lai Chau town
cinema
Lai Chau town
150 seats
20
2005-2010
7
Provincial
museum
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
10
2008-2010
8
Provincial
library
Lai Chau town
800 m2
20
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2005-2010
9
Lai Chau
newspaper printing factory
Lai Chau town
18
2008-2010
10
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
200 m2/ library
27
After 2010
11
Lai Chau
physical training and sport center
Lai Chau town
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2008-2010
12
Cultural -
information -physical training and sport facilities in to be-divided
districts
500 m2
50
After 2010
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Drug
detoxification centers in districts
12
2006-2010
G
Industrial
park infrastructure
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
1
Phong Tho
industrial park
Phong Tho
150 ha
60
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
H
Projects
on relocation of inhabitants from hydropower reservoir areas
1
Project on
relocation of inhabitants from Son La hydropower reservoir area
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2005-2010
2
Project on
relocation of inhabitants from Lai Chau hydropower reservoir area
Muong Te
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
After 2010
3
Project on
relocation of inhabitants from Huoi Quang hydropower reservoir area
Within
province
2006-2010
4
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Within
province
2005-2010
Notes:
The locations, land areas, total amounts and sources of investment capital of
the above-listed projects will be calculated, selected and specifically
determined at the stage of formulation and submission for approval of
investment projects, depending on the demands for and capabilities of balancing
and mobilizing resources in each period.-