To:
The Prime Minister
Following the Prime Minister’s
direction regarding additions to the wind power development planning
(hereinafter referred to as “the Planning”), the Ministry of Industry and Trade
would like to report on the following matters:
I. Wind power
development objectives and policies
I.1. Wind power development
objectives in revised Power Planning VII
According to the revised Power
Planning VII, wind power capacity shall reach approximately 800 MW in 2020,
approximately 2.000 MW in 2025 and approximately 6.000 MW in 2030.
I.2. Policies
- The Prime Minister has
promulgated Decision No. 37/2011/QD-TTg dated June 29, 2011 on provision of
assistance in development of wind power projects in Vietnam (hereinafter
referred to as “Decision No. 37/2011/QD-TTg) and Decision No. 39/2018/QD-TTg
dated September 10, 2018 amending a number of Articles of Decision No.
37/2011/QD-TTg (hereinafter referred to as “Decision No. 39/2018/QD-TTg).
- The Ministry of Industry and
Trade has promulgated Circular No. 02/2019/TT-BCT dated January 15, 2019 on
wind power project development and power purchase agreement for projects
thereof (hereinafter referred to as “Circular No. 02/2019/TT-BCT”) that came
into force on February 28, 2019.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Based on incentive policies for
wind power project development and with the aim of transparency, some basic
criteria applicable to appraisal and approval of proposed additions to the
Planning include:
- Feasibility of the plan for
connection with the national power grid.
- Wind potential at the site of
the proposed project.
- Suitability of the proposed
project with the local land use plan and planning, with a focus on avoiding use
of forest land (especially natural forest) and mines and reserves of minerals
(such as titan).
- Land use efficiency of the
proposed project.
- Financial capacity and
experience of the investor of the proposed project.
III. Revised
orientations of strategy for national energy development by 2030 with a vision
towards 2045 regarding wind power development and review of wind power
development size based on planning milestones
III.1. Revised orientations of
strategy for national energy development by 2030 with a vision towards 2045
regarding wind power development
On February 11, 2020, the
Politburo promulgated Resolution No. 55-NQ/TW on orientations of strategy for
national energy development by 2030 with a vision towards 2045 (hereinafter
referred to as “Resolution No. 55”), which specifies the circumstances and
causes; direction viewpoints, objectives and visions; and main tasks and
solutions for the energy sector. This document shall act as the beacon for
regulatory bodies, mass organizations, socio-political organizations and
relevant parties to perform and cooperate in their tasks.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
1. Direction viewpoint:
“…prioritize utilization of renewable energy, new energy and clean
energy".
2. Main tasks and solutions:
“Devise breakthrough policies and mechanisms to encourage robust development of
renewable energy sources, which will provide alternatives to fossil fuels.
Prioritize wind and solar energy for electricity generation…. Establish and
develop a number of renewable energy centers in suitable regions”; “Encourage
development of rooftop and floating solar panels. Formulate assistance policies
and breakthrough mechanisms for development of offshore wind energy in
connection with implementation of Vietnam’s marine strategy”.
III.2. Calculation of wind
power development size by 2025 and 2030
According to updates on the
progress of power source projects included in the revised Power Planning VII,
most thermal power projects are 1-2 year(s) behind schedule, especially
coal-fired power projects in the South scheduled to complete in 2018-2021 such
as Long Phu I, Song Hau I, Song Hau II; Long Phu III; O Mon III and IV, power
plants fired by gas from Ca Voi Xanh field (unable to determine the time upon
which gas from Block B and Ca Voi Xanh fields reaches shore), etc. In addition,
Vietnam has decided to suspend investing in Ninh Thuan nuclear power plant
until 2030. As equilibrium equation calculations predict power shortage in the
South, it is necessary to calculate and incorporate new power sources to ensure
sufficient power supply nationwide.
Multiple directions for power
source development have been proposed to balance demand and supply in the
upcoming period such as renewable energy development (especially wind and solar
power); power import from neighboring countries; acceleration of thermal power
projects and addition of new thermal power sources, especially proposed
LNG-to-power projects.
According to the overall report on
the revised Power Planning VII made by the Institute of Energy in February
2020, capacity needed for 2021 - 2030 demand and supply balance for both basic
and advanced options is forecasted as follows:
Table
1: Capacity proportion for 2021 - 2030, basic option
Item/year
Installed capacity (MW)
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
2020
2025
2030
2020
2025
2030
Total national power
demand
42080
63471
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Total installed
capacity
59090
104824
145568
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Total installed capacity
(without wind and solar, pumped-storage)
51410
81944
110028
Reserve capacity
(without wind and solar, pumped-storage)
22.2%
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
21.4%
In which:
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Coal
19637
38842
48932
33.2%
37.1%
33.6%
Power from gas
domestically generated + imported from Malaysia via pipes
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
10514
10774
12.1%
10.0%
7.4%
New LNG-to-power
projects
0
1500
12750
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
1.4%
8.8%
Existing thermal plants
shifting to LNG
0
1883
4213
0.0%
1.8%
2.9%
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
1610
575
108
2.7%
0.5%
0.1%
Imported
920
3370
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
1.6%
3.2%
4.0%
Large hydropower plants
with capacity of more than 30MW
17766
19116
19211
30.1%
18.2%
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Small hydropower plants
3800
4900
6000
6.4%
4.7%
4.1%
Wind (*)
1010
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
10090
1.7%
5.8%
6.9%
Solar (*)
6670
14450
20050
11.3%
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
13.8%
Biomass and other types
of renewable energy
544
1244
2244
0.9%
1.2%
1.5%
Pumped-storage
(pump-storage plants + battery storage)
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
2400
5400
0.0%
2.3%
3.7%
Table 2: Capacity proportion
for 2021 - 2030, advanced option
Item/year
Installed capacity (MW)
Capacity proportion (%)
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
2025
2030
2020
2025
2030
Total national power
demand
44224
68367
100215
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Total installed
capacity
60090
116699
169498
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
51410
82319
120458
Reserve capacity
(without wind and solar, pumped-storage)
16.2%
20.4%
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
In which:
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Coal
19637
38842
52962
32.7%
33.3%
31.2%
Power from gas domestically
generated + imported from Malaysia
7133
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
10024
11.9%
8.7%
5.9%
New LNG-to-power
projects
0
1500
18000
0.0%
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
10.6%
Thermal plants using
LNG
0
2258
5063
0.0%
1.9%
3.0%
Oil
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
950
108
2.7%
0.8%
0.1%
Imported
920
3370
5796
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
2.9%
3.4%
Large hydropower plants
with capacity of more than 30MW
17766
19116
19211
29.6%
16.4%
11.3%
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
3800
4900
6000
6.3%
4.2%
3.5%
Wind (*)
1010
11630
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
1.7%
10.0%
10.8%
Solar (*)
7670
20350
25250
12.8%
17.4%
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Biomass and other types
of renewable energy
544
1244
2544
0.9%
1.1%
1.5%
Pumped-storage (pump-storage
plants + battery storage)
0
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
5400
0.0%
2.1%
3.2%
(*)
Large amounts of wind and solar power are added
to the 2021-2023 period to cover thermal power projects falling behind
schedule.
With the abovementioned power
production, in 2025, additional wind power needed for the basic option is
6.030MW and for the advanced option is 11.630MW.
The advanced option may be
regarded as a plan for development of sufficient reserve sources of power in
case of high demand, unfavorable weather conditions or late completion of other
power projects.
IV. Update on
Planning revision and proposed additions to the Planning
IV.1. Wind power projects added
to the Planning and put into operation
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
IV.2. Proposed additions to the
Planning
As of March 15, 2020, besides
projects already added to the Planning, the Ministry of Industry and Trade has
received proposals for approximately 250 wind power projects with a total
capacity of 45.000 MW to be added to the Planning from provincial People’s
Committees, which are classified based on their geographical locations as
follows:
1. North Central Coast (including
Ha Tinh, Quang Binh and Quang Tri): 51 proposed projects with a total capacity
of 2.919 MW.
2. South Central Coast (including
Binh Dinh, Phu Yen, Ninh Thuan and Binh Thuan): 10 proposed projects with a
total capacity of 4.193 MW (793 MW if excluding Thang Long Wind offshore
project).
3. Central Highlands (including
Kon Tum, Gia Lai, Dac Lac, Dac Nong and Lam Dong): 91 proposed projects with a
total capacity of 11.733,8 MW.
4. Southeast (Ba Ria - Vung Tau):
2 proposed projects with a total capacity of 602,6 MW.
5. Mekong Delta (including Tien
Giang, Ben Tre, Tra Vinh, Hau Giang, Soc Trang, Bac Lieu and Ca Mau): 94
proposed projects with a total capacity of 25.541 MW.
Total number of projects and
capacity of each region and province are provided for in Appendix 1.
V. Proposed
wind power capacity to be added to the Planning by 2025
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
As 4.800MW of wind power capacity
has been added to the Planning, the remaining wind power capacity to be added
to the Planning by 2025 is 1.230MW for the basic option and 6.830MW for the
advanced option.
Wind energy promotion is one of
the main and suitable directions provided for by the Politburo in Resolution
No. 55. On the other hand, short-term power shortage (2021 - 2024) is imminent
while large thermal power projects continue to fall behind schedule or have yet
to finalize their schedules, demand may rise and weather conditions might
become unfavorable. Thus, the advanced option should be selected.
VI. Capacity of
electrical grid infrastructure of provinces proposing wind power projects of
high capacity
Results of assessment of capacity
of regional electrical grids by 2025 (especially for North Central Coast,
Central Highlands, South Central Coast and Mekong Delta) by the Institute of
Energy (February 2020) are as follows:
V.1. North Central Coast
16 wind power projects with a
total capacity of 638 MW of Quang Tri have been officially added to the
Planning while 2.612 MW of wind power are pending approval. All of these wind
power projects are located in the mountainous areas to the West of Quang Tri
and planned to be put into operation before November 2021.
Calculation results show that the
regional 110-220kV electrical grids are relatively capable of accommodating
power generated by local power sources in normal operating mode. However, if
either of the transformers of the Lao Bao 220kV substation (2x250MVA) encounters
a problem, the other transformer will be overloaded. Quang Tri is capable of
accommodating a maximum of 570 MW of additional wind power capacity (in normal
operating mode).
Ha Tinh has proposed Ha Tinh HBRE
Wind Farm project with a capacity of 120MW while Quang Binh has proposed
B&T Wind Farm project with a capacity of 252MW, both of which can be
accommodated by local electrical grids.
Thus, total wind power capacity
that can be added to the Planning from this region is approximately 941MW. List
of projects capable of being accommodated is provided for in Appendix 2.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
In Binh Dinh and Phu Yen, there
are quite a lot of solar power projects, and 04 wind power projects are being
proposed to be added to the Planning with a total capacity of 331 MW.
Calculations reveal that it would be difficult to incorporate more capacity
from wind power projects as the 220kV electrical grids of this area are quite
weak.
Ninh Thuan and Binh Thuan are the
fastest to boost development of renewable energy sources in Vietnam. In
2018-2019, approximately 2. 391 MW of solar power and 200 MW of wind power from
this area were put into operation. In addition, approximately 1. 000 MW of wind
power and almost 600 MW of solar power have been added to the Planning but are
not yet put into operation. Trung Nam solar power plant with a capacity of
450MW has also just been added to the Planning (energized together with Thuan
Nam 500kV substation).
Binh Thuan proposes Thang Long
Wind project (Ke Ga), an offshore wind power project with a capacity of
3.400MW, to be added to the Planning. As only wind power sources put into
operation before December 2021 are considered, this project, put into operation
in 2022 - 2027, is not qualified.
Calculations done for wind power projects
located in Ninh Thuan show that, at the end of 2021, only when all transmission
grids added to the Planning with the approval of the Prime Minister are put
into operation (especially Thuan Nam 500kV substation and transmission lines)
while the Di Linh - Duc Trong 220kV transmission line is separated will the
local electrical grids be capable of accommodating an additional 340MW from
wind power sources and Trung Nam solar power plant (Thuan Nam) (in normal
operating mode).
List of projects in this region
capable of being accommodated is provided for in Appendix 3.
V.3. Central Highlands
13 wind power projects in Central
Highlands, with a total capacity of 368MW, have been approved as new additions
to the Planning, while total capacity of wind power projects pending approval
is 11.733,8 MW. In which, 71,3% of capacity (8. 368MW) are from wind power
projects located in Gia Lai, 23% (2. 683MW) are from those located in Dak Lak
and 3,9% (460MW) are from those located in Dak Nong. Kon Tum and Lam Dong propose
only 1-2 project(s) with a capacity of 153,5MW and 69MW.
According to calculation results,
in adverse operating conditions (noons during flood season, Central Highlands
power sources operating at full capacity), Pleiku 2 500kV substation (2x450MVA)
and Dak Nong 500kV substation (2x450MVA) already operate at full load in normal
operating mode. Therefore, with only the wind power sources officially added to
the Planning, there are already many risks to the operation of electrical grids
of Central Highlands in 2021.
Available options to increase wind
power capacity for Central Highlands by 2021:
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
If both Dak Nong and Pleiku 2
500kV substations have their capacity raised to 2x900MVA in 2021, 1.150 MW of
wind power can be added to electrical grids of Central Highlands.
2. Option 2: raise the capacity of
Dak Nong and Pleiku 2 500kV substations to 2x900MVA; and build a 41-km Chu Se -
Pleiku 2 220kV transmission line:
If the 41-km Chu Se - Pleiku 2
220kV transmission line (AC500 or 2xAC330 cross section) is finished early, an
additional 250MW can be accommodated, increasing the total additional capacity
for Gia Lai and Dak Lak to approximately 1.400MW for 220kV grids. The Chu Se -
Pleiku 2 transmission line is a part of the Pleiku 2- Krong buk double-circuit
transmission line, which has been added to the Planning (2016-2020) and the
feasibility study report of which is being formulated. Thus, in order to
accelerate construction of this transmission line, suitable measures must be
taken to ensure it is put into operation in synchronization with wind power
projects in 2021.
If the second circuit of the Doc
Soi - Quang Ngai 220kV transmission line is put into operation in 2021, an
additional 200MW can be accommodated in Gia Lai.
Capacity of wind power projects
(such as Ia Pet - Dak Doa project (200MW) and Ia Nam project (400MW)) can be
accommodated if they are connected with 500kV grids. Projects shall be grouped
together to utilize shared electrical grid infrastructure.
List of proposed projects is
provided for in Appendix 4.
V.4. Mekong Delta
1. Currently, 32 wind power
projects have been added to the Planning with a total capacity of approximately
2.000MW. If taking electrical grids approved to be added to the Planning by the
end of 2021, electrical grids of Ben Tre, Tra Vinh and Ca Mau can accommodate
power sources. For Soc Trang and Bac Lieu, some 110kV transmission lines (put
into operation in 2021) shall be renovated sooner than as stated in the power
development planning of each province (2026-2030).
With the abovementioned
conditions, total wind power capacity that can be additionally accommodated is
approximately 2.300MW.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Proposed 110kV grid projects:
- Build a 110 kV Ben Tre and 220
kV Ben Tre double-circuit transmission line with a length of 0.24 km and ACSR
cross section of 2x240.
- Build a 110 kV Ba Tri - Giong
Trom double-circuit transmission line with a length of 16 km and ACSR cross
section of 2x185.
- Build a 110 kV double-circuit
transmission line from Ben Tre 220 kV substation to My Tho 220 kV substation
with a length of 15 km and ACSR cross section of 2x240.
Investment in theses transmission
lines can accommodate an additional 755MW (mostly in Ben Tre).
3. In case some 220kV grid
projects are added to the Planning
Proposed 220kV projects:
- Build a 5-km 220 kV
double-circuit transmission line with ACSR cross section of 400 from Bac Lieu
220 kV substation that connects with the existing Ca Mau - Soc Trang 220 kV
transmission line (single-circuit, ACSR-795MCM equivalent to ACSR-400). This
220 kV transmission line is not yet added to the revised Power Planning VII and
power development planning of Bac Lieu.
- Add 2 220 kV feeders to Bac Lieu
220 kV substation (feeder expansion is currently difficult according to
preliminary inspection).
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
List of projects in this region
capable of being accommodated is provided for in Appendix 5.
V.5. Southeast
In Southeast region, only Ba Ria -
Vung Tau proposes 02 projects (Cong Ly Ba Ria Vung Tau project (102,6MW,
onshore) and HBRE Ba Ria - Vung Tau project (500MW, offshore)) to be added to
the Planning.
List of projects in this region
capable of being accommodated is provided for in Appendix 6.
V.6. Conclusion
Consolidating the above
calculations and analyses, by 2021, with some proposed renovation, acceleration
and works added to the Planning, electrical grids could accommodate
approximately 7.000 MW (in normal operating mode).
This amount of capacity is
relatively suitable for increased wind power capacity stated in the advanced
option (an additional 6.830MW) with due consideration taken of the reserve
amount in case some grid and source projects are unqualified.
VI. Proposed
adding/acceleration of electrical grid projects for wind power project
accommodation
Based on the above calculations
and analyses, the following electrical grid projects need to be added to the
Planning or accelerated to accommodate wind power projects:
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
2. Raise the capacity of Pleiku 2
500kV substation from 2x450MVA to 2x900MVA.
3. Build a 5-km Bac Lieu - Ca Mau
- Soc Trang 220kV transmission line.
4. Accelerate construction of Binh
Dai 220 kV substation and a 220 kV double-circuit transmission line from Binh
Dai 220 kV substation to Ben Tre (250 MVA; 2x50 km) from 2031 - 2035 to 2021 -
2025.
VII.
Propositions
With the abovementioned contents
and analyses, as October 31, 2021 (the time limit after which wind power
projects are no longer entitled to the mechanism provided for in Decision No.
39/2018/QD-TTg) draws nearer, to ensure transparency and effectiveness of the
Government’s incentive policies for sustainable and effective development of
renewable energy (especially wind power) so as to enrich the national power
supply, implement Resolution No. 55 and achieve Vietnam’s CO2 reduction target
in COP21, the Ministry of Industry and Trade would like to propose the
following to the Prime Minister:
1. Grant approval for guidelines
on revision of wind power development objectives by 2025 with the capacity of
11.630 MW to ensure sufficient reserve sources of power and power supply in
case of high demand, unfavorable weather conditions or late completion of other
power projects.
2. Consider and decide on
additions to the Planning with connection plans and capacity accommodation
requirements provided for in the lists in Appendixes 2-6 enclosed therewith.
3. Consider additions to the
Planning and/or acceleration of synchronized electrical grid projects (provided
for in Section VI) to accommodate proposed wind power projects.
4. Provincial People’s Committees
shall urgently review land use plans/planning and other types of planning intra
vires to initiate land repurposing procedure for renewable energy projects
added to the Planning, prioritizing land with low economic value and potential
for renewable energy development.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
6. EVN shall direct its members to
urgently invest in synchronized electrical grid projects to accommodate wind
power projects.
7. Wind power projects not added
to the Planning this time may continue to be considered, studied and appraised
to be added to the revised Power Planning VII if qualified or to the Power
Planning VIII.
For your consideration and direction./.
P.P. THE MINISTER
THE DEPUTY MINISTER
Hoang Quoc Vuong
APPENDIX 1:
CAPACITY OF WIND POWER PROJECTS TO BE ADDED TO PLANNING BY
REGIONS AND PROVINCES
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
No.
Region
Quantity
Capacity (MW)
1
North
Central Coast
51
2,918.8
2
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
2
602.6
3
South
Central Coast
10
4,193.1
4
Mekong
Delta
94
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
5
Central
Highlands
91
11,733.8
Total
248
44,989.1
Table 2. Capacity of wind power projects to be added to
planning by provinces
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Province
Quantity
Capacity (MW)
1
Ba
Ria – Vung Tau
2
602.6
2
Bac
Lieu
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
4,608.6
3
Ben
Tre
23
12,063.0
4
Binh
Dinh
3
225.0
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Binh
Thuan
1
3,400.0
6
Ca
Mau
16
4,249.0
7
Dak
Lak
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
2,683.4
8
Dak
Nong
6
460.0
9
Gia
Lai
59
8,368.0
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Ha
Tinh
1
120.0
11
Hau
Giang
1
100.0
12
Kon
Tum
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
153.5
13
Lam
Dong
1
68.9
14
Ninh
Thuan
5
462.1
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Phu
Yen
1
106.0
16
Quang
Binh
1
252.0
17
Quang
Tri
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
2,546.8
18
Soc
Trang
19
1,748.8
19
Tien
Giang
2
685.5
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Tra
Vinh
14
2,086.0
Total
248
44,989.1
APPENDIX 2:
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
No.
Project name
Capacity (MW)
District
Province
Connection plan
Condition for capacity release
1
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
30
Huong Hoa
Quang Tri
Connected to 22 kV busbar of 22/110kV substation of Huong
Linh 4 Wind Power Plant
In normal
operating mode (N-0)
2
Huong
Hiep 2 Wind Power Plant
30
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Quang Tri
Connected to 110 kV busbar of 110/220kV Huong Linh
substation (gathering capacity in Huong Linh and adjacent areas), then
transmit capacity via a 220kV transmission line to the 220kV busbar of 220kV
Lao Bao substation
3
Huong
Hiep 3 Wind Power Plant
30
Huong Hoa
Quang Tri
Connected to 22kV busbar of 22/110kV substation of Huong
Hiep 2 Wind Power Plant, then transmit capacity via a 110kV transmission line
to 110kV busbar of 110/220kV Huong Linh substation (gathering capacity in
Huong Linh)
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
4
TNC
Quang Tri 1 Wind Power
50
Huong Hoa
Quang Tri
Connecting 220kV from 220 kV Huong Tan substation via
single circuit transmission line,
5
TNC
Quang Tri 2 Wind Power
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Huong Hoa
Quang Tri
6
Huong
Linh 7
30
Huong Hoa
Quang Tri
Connected to 22/110 kV busbar of Gelex 3 Wind Power Plant
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
7
Huong
Linh 8
25.2
Huong Hoa
Quang Tri
Connected to 22/110 kV busbar of Gelex 3 Wind Power Plant
8
AMACCAO
Quang Tri 1 Wind Power Plant
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Huong Hoa
Quang Tri
Connected to 110 kV busbar of 220 kV Lao Bao substation
9
Tan
Hop Wind Power Plant
38
Huong Hoa
Quang Tri
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
10
LIG
Huong Hoa 1 Wind Power Plant
48
Huong Hoa
Quang Tri
Connecting LIG Huong Hoa 1 Wind Power Plant through 220
kV voltage to 220 kV busbar of 220kV Lao Bao substation using ACSR300 wire
with a length of around 3.5 km long. Expanding and building a 220 kV feeder
at 220kV Lao Bao substation
11
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
48
Huong Hoa
Quang Tri
12
Hai
Anh
40
Lao Bao
Quang Tri
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
13
Tai
Tam Wind Power Plant
50
Huong Hoa
Quang Tri
Connected using 220kV transmission line to 220kV Lao Bao
substation
14
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
50
Huong Hoa
Quang Tri
Building a 22/220kV substation and connecting it to the
220kV busbar of 220 kV Lao Bao substation
15
HBRE
Ha Tinh Wind Farm
120
Ky Anh District and Ha Tinh Town
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Transit connection to Ky Anh – Ha Tinh 110 kV transmission
line
16
B&T
Wind Farm Cluster
252
Quang Ninh; Le Thuy
Quang Binh
Transit connection to Dong Hoi - Dong Ha 220kV transmission
line via two 220kV step-up substations
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Total
941.2
APPENDIX 3:
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
No.
Project name
Capacity (MW)
District
Province
Connection plan
Condition for capacity release
1
7A
Wind Power
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Thuan Nam
Ninh Thuan
Connected via double-circuit 110kV transmission line to
110kV busbar of 220kV Ninh Phuoc substation, using 12-km AC300 wire
- In
normal operating mode (N-0)
- After
electrical grid works for release of RE capacity already added to the
planning are put into operation, especially 500kV Thuan Nam substation and Thuan
Nam - Vinh Tan 500kV transmission line
- Separate
Di Linh - Duc Trong 220kV transmission line
2
Dam
Nai 4 Wind Power
27.6
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Ninh Thuan
Connected to 110kV busbar of 220kV Thap Cham substation
using 2-km AC300 wire
3
Loi
Hai 2
28.9
Thuan Bac
Ninh Thuan
Transit connection via Thap Cham -Cam Thinh Dong 25-m
double-circuit transmission line using AC240 wire
4
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
39.4
Thuan Bac
Ninh Thuan
Connected to 110kV busbar of Dam Nai 4 wind substation
using 1.8-km AC240 wire
5
Ninh
Thuan Wind Power Plant 5
46.2
Ninh Phuoc
Ninh Thuan
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
6
Cong
Hai 1 Wind Power, phase 2
25
Thuan Bac
Ninh Thuan
Transit connection to Ninh Hai – South Cam Ranh 110kV transmission
line by using 800-m double-circuit 2xAC240 wire
7
Phuoc
Huu – Duyen Hai 1 Wind Power
30
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Ninh Thuan
Transition on the second circuit of Thap Cham - Ninh
Phuoc transmission line
8
Vietnam
Power No. 1
30
Thuan Nam
Ninh Thuan
Connected to 7A Wind Power
9
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
88
Thuan Nam
Ninh Thuan
Connected to 220kV busbar of 500kV Vinh Tan substation
via a 22-km 220kV single-circuit transmission line using 2xACSR300 wire
Total
336.2
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
APPENDIX 4:
LIST OF WIND POWER PROJECTS TO BE ADDED TO PLANNING IN
CENTRAL HIGHLANDS REGION
No.
Project name
Capacity (MW)
District
Province
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Condition for capacity release
1
Ea
H’leo 1,2
57
Ea H’leo
Dak Lak
Connected via single-circuit 110kV transmission line to
110kV Ea H’Leo substation; AC240 wire; 13 km long
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- Raise
the capacity of 500kV Dak Nong substation and 500kV Pleiku 2 substation to
(2x900) MVA in 2021
2
Ea
Nam
400
Ea H’leo
Dak Lak
Build a 500kV substation with a capacity of 450MVA for transit
connection to Pleiku - Di Linh 500kV transmission line
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
3
Dak
Hoa
50
Dak Song
Dak Nong
220kV transmission line transitionally connected to Dak
Nong – Buon Koup 220kV transmission line with a length of 2km and AC2x330
wire
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Cuu
An
46.2
An Khe
Gia Lai
Build a 110kV step-up substation and a 0.5 km 110kV transmission
line using AC 185 wire for transit connection to An Khe – Kbang transmission
line
5
Song
An
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
An Khe
Gia Lai
Song An 110kV wind power substation with a capacity of
2x52 MVA, transit connection to 01x An Khe - K’Bang single-circuit 110kV transmission
line
6
Cho
Long Wind Power
155
Kong Chro
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Build a 220kV step-up substation at Yang Trung wind power
plant for transit connection to Pleiku 2 - An Khe hydropower 220kV transmission
line (co-investing with Yang Trung Wind Power)
- In
normal operating mode (N-0)
- Doc
Soi – Quang Ngai 220kV double-circuit transmission line operates
synchronously with these wind power sources
- Raise
the capacity of 500kV Dak Nong substation and 500kV Pleiku 2 substation to
(2x900) MVA in 2021
7
Yang
Trung Wind Power
145
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Gia Lai
Yang Trung 35/220kV wind power substation for transit
connection to 220kV single-circuit transmission line of An Khe hydropower -
500kV Pleiku 2 substation
8
Hung
Hai Gia Lai
100
Kong Chro
Gia Lai
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
9
Cu
Ne 1
50
Krong Buk
Dak Lak
Gathering capacity of Cu Ne 1,2 + Krong Buk 1, 2 wind
power plants to 22/220kV step-up substation of Krong Buk 2x125 MVA wind power
plant, transit connection to Krong Buk - Pleiku 2 220kV transmission line
- In
normal operating mode (N-0)
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- Raise
the capacity of 500kV Dak Nong substation and 500kV Pleiku 2 substation to
(2x900) MVA in 2021
10
Cu
Ne 2
50
Krong Buk
Dak Lak
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
11
Krong
Buk 1
50
Krong Buk
Dak Lak
12
Krong
Buk 2
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Krong Buk
Dak Lak
13
Ia
Le Wind Power
100
Chu Puh
Gia Lai
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
14
Nhon
Hoa 1,2 Wind Power
100
Chu Puh
Gia Lai
Nhon Hoa 1 35/220kV wind power substation for transit
connection to 220kV single-circuit transmission line of Krong Buk – Pleiku 2
500kV transmission line
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
15
Asia
Dak Song 1 Wind Power
50
Dak Song
Dak Nong
110kV double-circuit transmission line for transit
connection to Dak Mil - Dak Song 110kV transmission line using 0.5-km AC240
wire
- In
normal operating mode (N-0)
- Raise
the capacity of 500kV Dak Nong substation and 500kV Pleiku 2 substation to
(2x900) MVA in 2021
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
16
Che
Bien Tay Nguyen Wind Power
50
Chu Prong
Gia Lai
Connected via 22kV transmission line to Phat Trien Mien
Nui (Mountainous Development) wind power plant
17
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
50
Chu Prong
Gia Lai
Transit connection to Dien Hong - Chu Se 110kV transmission
line; 5.2-km 2xAC185 wire
18
Ia
Pech
50
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Gia Lai
Transit connection to 4-km 110kV Ia Grai – Pleiku
transmission line
19
Ia
Pech 2
50
Ia Grai
Gia Lai
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
20
Ia
Pet Dak Doa
200
Dak Doa
Gia Lai
A separate 500kV substation connected to 500kV Pleiku 2
substation
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Kon
Plong
103.5
Kon Plong
Kon Tum
Kon Plong 20kV wind power step-up substation with a
capacity of 150 MVA-35/220kV, connected via 220kV double-circuit transmission
line using 19-km ACSR 330 wire for transit connection to Thuong Kon Tum -
Quang Ngai hydropower 220kV transmission line
22
Tan
Tan Nhat
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Dak Glei
Kon Tum
Connected to Bo y 110kV substation
23
Dak
ND’rung 1
100
Dak Song
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Connected to 220kV busbar of 220kV Dak Nong substation
24
Dak
ND’rung 2
100
Dak Nong
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Dak
ND’rung 3
100
Dak Nong
26
Nam
Binh 1 Wind Power
30
Dak Song
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Connect 110kV transmission line to Dak Hoa 220kV wind
power capacity-gathering substation for transit connection to Buon Kuop -
Dien Phan Nhom 220kV transmission line
27
Ia
Bang 1 Wind Power
50
Chu Prong
Gia Lai
Connected to 110kV Dien Hong substation via 110kV
single-circuit transmission line, around 30km long
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
28
Ia
Boong – Chu Prong
50
Chu Prong
Gia Lai
Connected using 220kV transmission line to 500kV Pleiku 2
substation
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Total
2432.9
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
LIST OF WIND POWER PROJECTS TO BE ADDED TO PLANNING IN
MEKONG DELTA REGION
No.
Project name
Capacity (MW)
District
Province
Connection plan
Condition for capacity release
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Dong
Hai 1 Wind Power - Phase 2
50
Dong Hai
Bac Lieu
Gather the capacity to 220kV ECOTECH Dong Hai substation
for connection to 220kV busbar of 500kV Duyen Hai substation via 220kV
double-circuit transmission line
The connection
plan depends on the progress of 110 kV Hoa Binh switching station. It is
required to ensure 110 kV Hoa Binh switching station in synchronization with
the power source.
2
Hoa
Binh 1 Wind Power - Phase 2
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Hoa Binh
Bac Lieu
Connected to Hoa Binh 1 Wind Power (connected to 110kV
Hoa Binh substation via 110kV double-circuit transmission line
- In
normal operating mode (N-0)
3
Hoa
Binh 2 Wind Power
50
Hoa Binh
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Connected to 110 kV Hoa Binh switching station (at 220kV
Hoa Binh substation) via 110kV double-circuit transmission line
The connection
plan depends on the progress of 110 kV Hoa Binh switching station. It is
required to ensure 110 kV Hoa Binh switching station in synchronization with
the power source.
4
Hoa
Binh 5
120
Hoa Binh
Bac Lieu
220kV double-circuit transmission line used together with
HCG Bac Lieu wind power plant cluster - Bypass Gia Rai – Bac Lieu 2 220kV transmission
line
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
5
Sunpro
Wind Power
30
Binh Dai
Ben Tre
Connected to 110kV Binh Dai substation via a 110kV
double-circuit transmission line
It
is necessary to separate Ben Tre 110kV - Ben Tre 220kV transmission line.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Thien
Phu Wind Power
30
Thanh Phu
Ben Tre
Gathering capacity for connection to 110kV switching
station and to 110kV Binh Thanh substation via a 110kV double-circuit
transmission line
It
is necessary to separate Ben Tre 110kV - Ben Tre 220kV transmission line.
7
Thien
Phu 2 Wind Power
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Thanh Phu
Ben Tre
8
Ben
Tre No. 5 Wind Power – Phase 2
90
Thanh Phu
Ben Tre
Wind power No. 5 - Thach Hai 1, 2, 3, 4: 3x30+20 MW;
Phase 1 – Wind power No. 5 -Thanh Hai 1(V1-2: 30 MW) connected together with
V1-1 to Thanh Phu (Binh Thanh) 110kV substation via a 110kV double-circuit
transmission line using AC240 wire
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
9
Hai
Phong transmission line
200
Thanh Phu
Ben Tre
35/220kv substation: 2x250 MVA; 220kV transmission line
to 220kV Mo Cay substation, with length of 2x50km, ACSR2x500
It
is necessary to construct a 220kV transmission line (50km in length). To
facilitate the operation, it is necessary to reduce generating capacity to
~200 MW.
Renovate
Ben Tre - My Tho 220kV transmission line by using superconducting wire
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
10
Thanh
Phu Wind Power
120
Thanh Phu
Ben Tre
Connected to 110kV Binh Thanh substation via 110kV
single-circuit transmission line
- Build
a Ben Tre 110kV - Ben Tre 220kV double-circuit transmission line with a
length of 0.24km and ACSR cross section of 2x240.
- Build
a Ba Tri – Giong Trom 110kV double-circuit transmission line with a length of
16km and ACSR cross section of 2x185.
- Build
a 110 kV double-circuit transmission line from 220 kV Ben Tre substation to
220 kV My Tho substation with a length of 15 km and ACSR cross section of
2x240 (These works are yet to be added to the planning)
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
11
Nexif
Ben Tre – Phase 2, 3
50
Thanh Phu
Ben Tre
Build a new 22/110kV substation: 63 MVA to approved 110
kV Nexif Ben Tra substation - Phase 1 (V1-1-30MW); connected together with
V1-1 to Binh Thanh 110kV substation
12
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
50
Ba Tri
Ben Tre
35/220kv substation: 63 MVA; a 10-km 110kV single-circuit
transmission line connected to 110kV Ba Tri substation using AC240 wire
13
Ben
Tre No. 19 Wind Power
50
Thua Duc
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Transmitted through 35kV single-circuit transmission line
to 35kV busbar of 35/220 kV substation of Ben Tre No. 20 Wind Power
14
Ben
Tre No. 20 Wind Power
50
Thua Duc
Ben Tre
35/220kv substation: 2x63 MVA; a 220kV single-circuit
transmission line connected to 220kV Ben Tre substation for transmission of
the capacity of Wind Power Plants 19, 20
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
VPL
Ben Tre - Phase 2
30
Binh Dai
Ben Tre
Gathering capacity from VPL Ben Tre wind power projects -
Phase 1-2, Binh Dai, Binh Dai 2, Binh Dai 3 wind power projects to 110 kV
busbar; then connect it to 110 kV Binh Dai substation via a 110kV
double-circuit transmission line, 15km long, ACSR -2x240
Build
and renovate 110kV grid of Ben Tre Province:
- Build
a Ben Tre 110kV - Ben Tre 220kV double-circuit transmission line with a
length of 0.24km and ACSR cross section of 2x240.
- Build
a Ba Tri – Giong Trom 110kV double-circuit transmission line with a length of
16km and ACSR cross section of 2x185.
- Build
a 110 kV double-circuit transmission line from 220 kV Ben Tre substation to
220 kV My Tho substation with a length of 15 km and ACSR cross section of
2x240.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- Accelerate
construction of 220kV Binh Dai substation and a 220kV double-circuit
transmission line from 220 kV Binh Dai substation to Ben Tre (250 MVA; 2x50
km) from 2031 - 2035 to 2021 - 2025.
16
Bind
Dai 2 Wind Power
49
Binh Dai
Ben Tre
17
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
49
Binh Dai
Ben Tre
18
Khai
Long Wind Power - Phase 2
100
Ngoc Hien
Ca Mau
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
202kV
Nam Can substation and 220-110kV transmission line connected to the
substation
19
Khai
Long Wind Power – Phase 3
100
Ngoc Hien
Ca Mau
20
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
100
Long My
Hau Giang
22/220kV substation: 250 MVA; 220kV transmission line for
transit connection via a Ca Mau - O Mon thermal power 220kV single-circuit
transmission line with a length of 2x1km long and ACSR400 wire
- In
normal operating mode (N-0).
21
Soc
Trang 4 Wind Power
350
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Soc Trang
Connected to 220kV Vinh Chau substation via 220kV
double-circuit transmission line
220kV
Vinh Chau substation is expected to be operated by 10/2021; Accelerate the
construction of a 220kV double-circuit transmission line for transit
connection to 220kV Bac Lieu substation via Ca Mau – Soc Trang thermal power
220kV single-circuit transmission line; operate it in synchronization with
these wind power sources.
22
Phu
Cuong Soc Trang 1A and 1B
200
Vinh Chau
Soc Trang
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
23
Soc
Trang 16 Wind Power
40
Vinh Chau Town
Soc Trang
Connected to 110kV busbar of 220kV Soc Trang substation
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Soc
Trang No. 7 Wind Power – Phase 2
90
Vinh Chau
Soc Trang
Utilize the infrastructure for connection to Wind Power
No. 7 project - Phase 1 - 30MW (V1-3); install 2x 22/110kV transformers:
(2x63) MVA
220kV
Vinh Chau substation; Vinh Chau 110kV - Bac Lieu 220kV double-circuit
transmission line
25
Soc
Trang 11 Wind Power
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Cu Lao Dung
Soc Trang
Connected to 110kV Tran De substation
- In
normal operating mode (N-0).
26
Hoa
Dong 2 Wind Power
72
Vinh Chau
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Transit connection via Vinh Chau - Soc Trang 220kV
single-circuit transmission line via a double-circuit line with a length of
about 1km
27
BCG
Soc Trang 1 Wind Power
50
Vinh Chau
Soc Trang
22/110kV substation – 63 MVA; 110kV single-circuit
transmission line to 220kV Vinh Chau substation with a length of 8km and
ACSR185 wire
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Tran
De
50
Tran De
Soc Trang
110kV single-circuit transmission line to 110kV Tran De
switching station with a length of 4km long and ACSR185 wire
29
Song
Hau
50
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Soc Trang
110kV single-circuit transmission line to 110kV Tran De
switching station with a length of 4km long and ACSR185 wire
30
Nexif
Energy Wind Power
40
Soc Trang
110kV double-circuit transmission line to Tran De 110kV
substation with a length of 2x18km and ACSR240 wire
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
31
Lac
Hoa 2 Wind Power
130
Vinh Chau
Soc Trang
Build a 220kV transmission line to connect it to 220kV
substation of Hoa Dong 2 wind power project via a 6-km 220kV single-circuit
transmission line using ACSR240 wire.
(Hoa Dong 2 wind power transitionally connected via Vinh
Chau - Long Phu 220kV transmission line.)
32
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
80
Duyen Hai
Tra Vinh
Gather capacity to 220kV Dong Thanh substation for
transit connection via ECOTECH Dong Hai - Duyen Hai 500kV 220kV
single-circuit transmission line
33
Dong
Thanh 2 Wind Power
120
Duyen Hai
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
34
Dong
Hai 1 Wind Power
100
Duyen Hai
Tra Vinh
Gather capacity to 220kV ECOTECH Dong Hai substation for
connection to 220kV busbar of 500 kV Duyen Hai substation via a 9-km 220kV
double-circuit transmission line using ACSR-2x330
Construct
and renovate 110kV grid of Ben Tre Province (4x110kV electrical grid works as
proposed to Ben Tre Province).
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Thang
Long Wind Power
96
Tra Vinh
Build a 12-km 220kV single-circuit transmission line to
220kV busbar of 500kV Duyen Hai substation using ACSR-400 wire
36
Tan
Phu Dong Wind Power
150
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Tien Giang
Connected to the existing 110kV Go Cong substation via a
23-km double-circuit transmission line using ACSR185 wire
My
Tho 220kV - Go Cong - Can Duoc - Can Duoc 220kV 110kV double-circuit
transmission line, suspending 1 circuit in advance, with a length of 65km and
phased ACSR cross-section of 2x240 must be put into operation (SPC is
expected to energize this project by the end of 2020)
37
Vien
An Wind Power
50
Ngoc Hien
Ca Mau
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- In
normal operating mode (N-0).
Total
3166.8
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
APPENDIX 6:
LIST OF WIND POWER PROJECTS TO BE ADDED TO PLANNING IN
SOUTHEAST REGION
No.
Project name
Capacity (MW)
District
Province
Connection plan
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
1
Cong
Ly Ba Ria - Vung Tau
102.6
Xuyen Moc
Ba Ria – Vung Tau
21.5-km 110 kV double-circuit transmission line connected
to 110kV Xuyen Moc substation
- In
normal operating mode (N-0).