THE
MINISTRY OF FINANCE
-----
|
SOCIALIST
REPUBLIC OF VIET NAM
Independence - Freedom - Happiness
-------
|
No:
11/2003/QD-BTC
|
Hanoi
, January 24, 2003
|
DECISION
PROMULGATING THE RATES OF CHARGES FOR INSPECTION OF THE
TECHNICAL SAFETY AND QUALITY OF INLAND WATERWAY MEANS
THE MINISTER OF FINANCE
Pursuant to the Government’s
Decree No. 86/2002/ND-CP of November 5, 2002 defining the functions, tasks, powers
and organizational structure of the ministries and ministerial-level agencies;
Pursuant to the Government’s Decree No. 178/CP of October 28, 1994 on the
tasks, powers and organizational structure of the Ministry of Finance;
Pursuant to August 28, 2001 Ordinance No. 38/2001/PL-UBTVQH on Charges and
Fees; pursuant to the Government’s Decree No. 57/2002/ND-CP of June 3, 2002
detailing the implementation of the Ordinance on Charges and Fees;
At the proposals of the Minister of Communications and Transport in Official
Dispatch No. 4283/GTVT-TCKT of November 13, 2002 and of the director of the
Enterprise Finance Department,
DECIDES:
Article 1.-
To promulgate together with this Decision the Regulation on the rates of
charges for inspection of technical safety and quality of inland waterway
means, including:
1. Charges for approval of the
designs of inland waterway means.
2. Charges for inspection of
technical safety and quality of newly-built inland waterway means.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
4. Charges for inspection of
technical safety and quality of inland waterway means in repair and
transformation.
5. Charges for inspection and
certification of the water displacement volume of inland waterway means.
Article 2.-
The charge rates in this Table are inclusive of value-added tax but exclusive
of the fee for the granting of technical safety and quality certificates for
inland waterway means, and expenses for accommodation, travel and communication
in service of the inspection work in places over 100 km far from the inspection
offices.
Article 3.-
The prices of designing, new building, repair and transformation of inland
waterway means (including supplies and equipment supplied by customers) serving
as a basis for calculating the inspection charges in this Table of Charges are
exclusive of value added tax.
Article 4.-
For inspection works not yet specified in this Table of Charges, the inspection
charges shall be calculated according to the inspection time at the rate of VND
100,000 per hour. The minimum charge per inspection is VND 100,000/inspection.
Article 5.- The
charge payers prescribed in this Decision are organizations and individuals for
whom the Vietnam registry offices inspect the technical safety and quality of
their inland waterway means in designing, new building, repair, transformation
and operation.
Article 6.-
Several terms used in this Table of Charges are construed as follows:
1. Inland waterway means include
ships, boats (with or without engines) and other floating structures used for
the transport or service provision purposes along inland waterway routes.
2. Gross tonnage of a ship is
the weight calculated in ton of cargoes, passengers, fresh water, ballast
water, food and foodstuffs, crew and their belongings, fuel and lubricating
oils corresponding to the ship’s dry side, under the provisions of current
technical norms and standards.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Article 8.-
Organizations and individuals being charge payers, inspection agencies and
concerned agencies shall have to implement this Decision.
FOR
THE MINISTER OF FINANCE
VICE MINISTER
Tran Van Ta
THE TABLE OF CHARGES FOR INSPECTION OF TECHNICAL SAFETY AND
QUALITY OF INLAND WATERWAY MEANS
(Promulgated together with Decision No. 11/2003/QD-BTC of January 24, 2003
of the Minister of Finance)
I. CHARGES
FOR APPROVAL OF DESIGNS OF INLAND WATERWAY MEANS
1. The charge rates for approval
of the technical designs of newly-built inland waterway means shall be
calculated in % of the costs of the designs for new building.
Table
1
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Costs
of designs for new building (in VND million)
Charge
rates (%)
1
Up to 10
6.0
2
Between over 10 and 50
5.5
3
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
5.0
4
Between over 100 and 200
4.5
5
Over 200
4.0
2. The charge rates for approval
of the technical designs of transformed or repaired inland waterway means shall
be calculated in percentage of the costs of transformation or repair designs.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Ordinal
number
Costs
of transformation or repair designs (in VND million)
Charge
rates (%)
1
Up to 10
6.0
2
Between over 10 and 30
5.5
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Between over 30 and 60
5.0
4
Between over 60 and 100
4.5
5
Over 100
4.0
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
4. The charge rates for approval
of modified designs, approval of the technical design of the second product on,
duplication of designs, duplication and granting of dossiers on the designs of
prototypes already recognized by Vietnam Registry shall be equal to 30% of the
corresponding design approval charge rates prescribed in Table 1 or 2.
II. CHARGES
FOR INSPECTION OF TECHNICAL SAFETY AND QUALITY OF NEWLY-BUILT INLAND WATERWAY
MEANS
1. Basic charge rates:
Table
3
Ordinal
number
Costs
of new building: C (in VND million)
Charge
rates (in VND thousand)
1
Up to 10
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2
Between over 10 and 20
300
3
Between over 20 and 30
350
4
Between over 30 and 100
350
+ (C - 30,000) x 0.008
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Between over 100 and 300
910
+ (C - 100,000) x 0.007
6
Between over 300 and 1,000
2,310
+ (C - 300,000) x 0.006
7
Between over 1,000 and 2,000
6,510
+ (C - 1,000,000) x 0.005
8
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
11,510
+ (C - 2,000,000) x 0.004
2. The charge for inspection of
the technical safety and quality of newly-built means of each type shall be calculated
according to the basic charge rates specified in Table 3 multiplied by the
coefficient of the type of the means as follows:
Table
4
Ordinal
number
Costs
of new building: C (in VND million)
Charge
rates (in VND thousand)
1
Dry cargo ships
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2
Fishing ships, tug ships, push
ships, oil tankers (except those of Class I), project ships, mission ships,
container ships
1.2
3
Research and prospection ships,
frozen-cargo vessels, Class-I oil ships, passenger ships, passenger
ferry-boats, sport or entertainment ships, speed vessels, floating pontoons,
floating houses, floating jetties.
1.5
4
Hazardous cargo vessels, liquefied
gas vessels, toxic chemical vessels.
1.8
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
3. For the mass inspection of
the technical safety and quality of over 10 newly-built means of the same
design and built at the same factory, the inspection charge shall be reduced by
20% for the second means on.
III. CHARGES
FOR INSPECTION OF THE TECHNICAL SAFETY AND QUALITY OF INLAND WATERWAY MEANS IN
OPERATION
The charges for inspection of
the technical safety and quality of inland waterway means being in operation
include:
1. The charge for annual
inspection of inland waterway means.
2. The charge for periodical
inspection of inland waterway means.
3. The charge for first-time
inspection of inland waterway means.
4. The charge for irregular
inspection of inland waterway means.
5. The chares for inspection of
inland waterway means on skids or in docks.
6. The charge for inspection of
small-sized river-cross transport means, small-sized river vessels.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
8. The charges for inspection of
pressure cylinders on inland waterway means.
1. The charge for annual
inspection:
The charge for annual inspection
of inland waterway means being in operation shall be calculated according to
the following formula:
The charge amount (in VND) = [L
x (B + D) + P] x a x b x A
In which:
L: The length of the means in
meter
B: The width of the means in
meter
D: The height of the side of the
means in meter
P: The total standard capacity
of main and auxiliary engines calculated in horse power
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
b is the coefficient of the age
of the means prescribed as follows:
Table
5
Ordinal
number
Age
of means
Coefficient
b
1
Up to 5 years
1.00
2
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
1.25
3
Between over 10 and 15 years
1.50
4
Between over 15 and 20 years
1.75
5
Over 20 years
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
A: The value of one charge
calculation unit is VND 1,400.
2. The charge for periodical
inspection:
The charge for periodical
inspection of inland waterway means shall be the charge for annual inspection
specified at Point 1 multiplied by coefficient 1.5.
3. The charge for first-time
inspection:
3.1. The charge for inspection of
inland waterway means which are newly-built according to the approved designs
and under the supervision by the registry offices in the building process shall
be calculated at the rates specified in Section II.
3.2. The charge for inspection
of transformed inland waterway means coinciding with the first-time,
periodical, annual inspection, inspection of those on skids or having their
propeller axes withdrawn, or irregular inspection, shall be calculated at the
rates prescribed in Section IV, plus the corresponding periodical or annual
inspection charge.
3.3. The charge for first-time
inspection of newly-built or transformed inland waterway means according to the
approved designs and accompanied with the construction technique supervision
dossiers compiled by other units being registry offices shall be calculated at
the rates of the charge for annual inspection specified at Point 1.
3.4. The charge for first-time
inspection of newly-built or transformed inland waterway means failing to
comply with the approved designs or without designs or without building
supervision by registry offices shall be calculated as follows:
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
3.4.2. The charge for inspection
of newly-built means shall be calculated at the rates specified in Section II,
for transformed means, it shall be calculated at the rates specified in Section
IV and Point 2 of this Section.
4. The charge for irregular
inspection (including inspection of irregular cases, cases of accidents,
changing hands, changing the registration areas, extension…) shall be the same
as the charge for annual inspection specified at Point 1 and multiplied by
coefficient 0.8 or be calculated as prescribed in Article 4 of this Decision.
5. Charge for inspection of
means on skids or in docks:
5.1 The charge for inspection of
means on skids or in docks without annual inspection and repair supervision
shall be the same as the charge for annual inspection specified at Point 1
multiplied by coefficient 0.5 or be calculated as prescribed in Article 4 of
this Decision.
5.2 The charge for inspection of
means on skids or in docks coinciding with annual or periodical inspection
shall be the same as the charge for annual or periodical inspection specified
at Point 1 or 2 multiplied by coefficient 1.25.
6. The charge for inspection of
small-sized cross-river transport means and small-sized river vessels on a
cyclic basis shall be the same as the charge for annual inspection specified at
Point 1 or calculated as prescribed in Article 4 of this Decision.
7. The charge for inspection of
cargo-lifting equipment on transport means or floating cranes:
7.1. Basic charge rates:
Table
6
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Lifting
capacity (in ton)
Charge
rates (in VND thousand)
First-time
inspection
Periodical
inspection
Annual
inspection
1
Between 1 and 3
210
150
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2
Between over 3 and 5
350
250
150
3
Between over 5 and 10
490
350
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
4
Between over 10 and 20
630
450
350
5
Between over 20 and 40
770
550
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
6
Over 40
770
+ (T - 40) x 10
550
+ (T - 40) x 10
450
+ (T - 40) x 10
7.2. The charge for equipment
age-based inspection shall be calculated according to the provisions in Table 6
and multiplied by the following adjustment coefficients:
Table
7
Ordinal
number
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Coefficient
1
Up to 5 years
1.00
2
Between over 5 and 10 years
1.25
3
Between over 10 and 15 years
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
4
Between over 15 and 20 years
1.75
5
Over 20 years
2.00
8. The charge for inspection of
pressure vessels aboard inland waterway means:
Table
8
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Capacity
of pressure vessels (in liter)
Charge
rates (in VND thousand)
Outside
inspection
Inside
inspection
Test
of water pressure
1
Up to 50
50
75
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2
Between over 50 and 100
75
100
100
3
Over 100
135
180
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
IV. CHARGES
FOR INSPECTION OF TECHNICAL SAFETY AND QUALITY OF INLAND WATERWAY MEANS IN
REPAIR OR TRANSFORMATION
1. Basic charge rates:
Table
9
Ordinal
number
Costs
of repair or transformation:
C (in VND million)
Charge
rates (in VND thousand)
1
Up to 15
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2
Between over 15 and 50
300 + (C - 15,000) x 0.016
3
Between over 50 and 150
860 + (C - 50,000) x 0.012
4
Between over 150 and 350
2,060 + (C - 150,000) x 0.009
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Between over 350 and 700
3,860 + (C - 350,000) x 0.007
6
Between over 700 and 1,200
6,310 + (C - 700,000) x 0.005
7
Between over 1,200 and 2,500
8,810 + (C - 1,200,000) x
0.003
8
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
12,710 + (C - 2,500,000) x
0.001
2. The charge for inspection of transformed
inland waterway means coinciding with the first-time, periodical, annual
inspection, inspection of those on skids or having their propeller axes
withdrawn, or irregular inspection, shall be calculated at the rates specified
in Table 4, plus the charge for the corresponding inspection type.
V. CHARGES
FOR INSPECTION AND CERTIFICATION OF WATER DISPLACEMENT VOLUMES OF WATERWAY MEANS
1. Basic charge rates
Table
10
Ordinal
number
Gross
tonnage (in ton)
Charge
rates (VND/ton)
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Annual
certification
1
Up to 20
1,650
800
2
Between over 20 and 30
1,600
800
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Between over 30 and 50
1,550
800
4
Between over 50 and 75
1,525
800
5
Between over 75 and 100
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
800
6
Over 100
1,450
800
2. Where a means must be
surveyed, measured for drawing its shape for use as a basis for certifying its
water displacement volume during all types of inspection, the charge for inspection
shall be the same as the charge specified in Table 10 multiplied by coefficient
2.0.
3. Where the books of
certification of water displacement volume are re-issued without measuring and
re-drawing the ship’s shape, the inspection charge shall be the same as the
charge specified in Table 10 multiplied by coefficient 0.8.-