THE
MINISTRY OF TRANSPORT
-------
|
SOCIALIST
REPUBLIC OF VIET NAM
Independence - Freedom – Happiness
---------
|
No.
1764/QD-BGTVT
|
Hanoi,
August 03, 2011
|
DECISION
APPROVING
THE DETAILED MASTER PLAN ON THE SEAPORT GROUP IN SOUTHERN CENTRAL VIETNAM
(GROUP 4) THROUGH 2020, WITH ORIENTATIONS TOWARD 2030
THE MINISTER OF TRANSPORT
Pursuant to the November 26,
2003 Construction Law; Pursuant to the June 14, 2005 Maritime Code of Vietnam;
Pursuant to the Government’s
Decree No. 51/2008/ND-CP of April 22, 2008, defining the functions, tasks,
powers and organizational structure of the Ministry of Transport;
Pursuant to the Government’s
Decree No. 92/2006/ND-CP of September 7, 2006, on elaboration, appraisal,
approval and management of socio- economic development master plans, and Decree
No. 04/2008/ND-CP of January 11, 2008, amending and supplementing a number of
articles of Decree No. 92/2006/ND-CP;
Pursuant to the Prime
Minister’s Decision No. 2190/QD-TTg of December 24, 2009, approving the master
plan on development of Vietnam’s seaport system through 2020, with orientations
toward 2030;
Considering Report No.
1623/TTr-CHHVN-KHDT of July 21, 2011, of the Vietnam Maritime Administration,
and the minutes of the meeting of the Appraisal Council in June 2011, on the
detailed master plan on the seaport group in Southern Central Vietnam (Group 4)
through 2020, with orientations toward 2030;
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
DECIDES:
Article 1. To approve the
detailed master plan on the seaport group in Southern Central Vietnam seaports
(Group 4) through 2020, with orientations toward 2030, with the following principal
contents:
1. Scope of the master plan
The master plan covers seaports
in coastal provinces in Southern Central Vietnam, including Binh Dinh, Phu Yen,
Khanh Hoa, Ninh Thuan and Binh Thuan. The scope of service of these seaports
embraces all these provinces and meets the shipping need of some Central
Highlands provinces (Gia Lai, Kon Tum, Dac Lac and part of Lam Dong province),
some southern provinces of the Lao People’s Democratic Republic and the
northern region of the Kingdom of Cambodia.
2. Development viewpoints and
objectives a/ Development viewpoints:
- To develop this seaport group
in line with the master plan on development of Vietnam’s seaport system, in
close combination with the local transport sector development, construction and
socio-economic development master plans and other relevant master plans.
- To utilize and bring into the
fullest play the advantages in geographical locations and natural conditions in
favorable locations for developing seaports in the southern Central Vietnam and
related infrastructure facilities in a balanced and synchronous manner; to
concentrate investment and adopt plans on effective operation of Van Phong
international transshipment seaport, making technology - management - operation
breakthroughs toward modernity for assumption of the role as a regional
international transshipment seaport.
- To rationally develop national
and regional major general seaports, special-use seaports and local seaports in
order to assure harmony in the entire group; to attach importance to
development of general and special- use seaports for large-tonnage seagoing
ships in Quy Nhon, Van Phong and Cam Ranh areas; to develop special-use
seaports associated with economic zones, industrial parks, and large coal-fired
and nuclear thermal power plants and bauxite-aluminum plants; to attach
importance to the maintenance and regular repair of existing wharves to assure
synchronous and effective operation.
- To synchronously develop
seaports and navigable channels as well as seaport infrastructure facilities
and public infrastructure linked with seaports; to develop goods distribution
and logistics centers.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- To closely combine seaport
development with sanitation and environmental management and protection,
assuring sustainable develop- ment in the context of climate change and meeting
requirements of national defense and security.
b/ Development objectives and
orientations:
- General objectives:
+ To form local general seaports
in the region to meet cargo shipping needs of regional localities and link with
major seaports in the region and the national international gateway and international
transshipment seaports; to ensure balanced and synchronous development of
seaports and related infrastructure facilities linked with seaports’ zones of
attraction; and the seaports group will serve as a driving force for
socio-economic development and maintenance of security and national defense in
each locality, the whole Central Vietnam key economic region and related
regions.
+ To meet the need for
transportation of imported raw materials, materials and fuels and exported
products of metallurgical, petrochemical and mining establishments in the
region; and facilitate the development of seaport urban centers with a view to
accelerating the regional industrialization and modernization through 2020,
with orientations toward 2030.
- Specific targets:
+ The port throughput at
different points of planning periods will be as follows:
·64.5 ÷ 94.5 million tons/year
by 2015;
·144 ÷ 198 million tons/year by
2020;
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
+ To accommodate the following
types of seagoing ships: General cargo ships of 10,000 -50,000 DWT, container
cargo ships of an equivalent tonnage of 10,000 - 50,000 DWT and a loading
capacity of 12,000 - 15,000 TEU (for container wharves for international
transshipment), bulky cargo ships of 50,000 - 200,000 DWT, crude oil tankers of
up to 400,000 DWT, oil product- carrying ships of 10,000 - 150,000 DWT, and
passenger ships of 50,000 - 100,000 GRT;
3. Contents of the master plan
a/ Detailed planning of seaports
in the group
The seaport group in southern
Central Vietnam (Group 4) consists of 7 seaports of Quy Nhon, Vung Ro, Van
Phong, Nha Trang - Cam Ranh, Ninh Thuan, Vinh Tan and Ke Ga, specifically as
follows:
- Van Phong seaport - Khanh Hoa:
This is a national general and international transshipment seaport (class IA),
which consists of the main functional wharf areas of Dam Mon, Doc Let - Ninh
Thuy and My Giang, of which:
+ Dam Mon wharf area: This is a
main wharf area of the seaport which consists of special-use wharves for
international container transshipment and special-use wharves for industrial
parks and international tourists.
·Van Phong international
container transshipment wharf area: This is a major international container
transshipment special-use wharf area for Vietnam’s exports and imports and
internationally transshipped containers.
By 2015, to concentrate
resources on accelerating the construction and completion of two starting
wharves for ships of up to 12,000 TEU. By 2020, to build between 2 and 4
additional wharves for ships of 9,000 -15,000 TEU and between 2 and 4 wharves
for feeder ships of 500 - 1,500 TEU. By 2015 and 2020, the annual throughput
will be 0.9 - 1.05 million TEU and between 3.1 and 4.5 million TEU,
respectively. After 2020, this area will develop in line with the growth rate
of Vietnam’s volume of exports and imports shipped on trans-ocean shipping
routes and transshipped to neighboring countries, with an annual total
throughput of 14.5 - 17 million TEU. The seaport system’s physical and technical
foundations will be built with complete and modern management and
loading/unloading equipment, facilities and technologies up to international
standards.
·Dam Mon sand wharf: This is a
special-use wharf for sand export. Its existing size will be maintained with a
percussive pier for ships of 30,000 DWT and an annual throughput of 0.1 million
tons. This wharf will be relocated for building international container
transshipment wharves whenever necessary.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
·Van Phong oil transshipment
wharf: This is a special-use petrol and oil wharf serving oil transshipment and
transportation for Vietnam and the region. By 2015, to maintain the existing
size with two anchoring places for oil tankers of 400,000 DWT. By 2020, to
gradually reduce its capacity and then stop its operation. The whole
transshipped oil volume will be handled by Van Phong bonded petrol and oil
wharf.
+ Doc Let - Ninh Thuy wharf
area: This is a special-use wharf area for bulky cargoes, other types of
cargoes and also serves as a local general seaport for Ninh Thuy industrial
park.
·Hon Khoi wharf: This is a
special-use wharf for salt import and export and local general cargoes. To
upgrade and renovate the existing pier to accommodate ships of 600 - 1,000 DWT
with an annual throughput of 0.1 - 0.2 million tons.
·Wharves of Van Phong petroleum
industry service base: These are special-use wharves for Van Phong petroleum
industry service base and can be developed to accommodate ships of 30,000 -
40,000 DWT and the petroleum service ship fleet and concurrently for handling
general cargoes, equipment and facilities and liquid cargoes being exported and
imported petrol, oil, LPG, chemicals carried by ships of up to 50,000 DWT. This
wharf area will be developed on conditions and expanded according to needs and
capabilities of investors.
·Nghi Son - Van Phong cement
wharf: This is a special-use wharf serving Nghi Son - Van Phong cement grinding
station for ships of 21,000 DWT and with an annual throughput of 0.5 - 1
million tons.
·Other general and special-use
wharves in service of Ninh Thuy industrial park.
+ My Giang wharf area: This is a
special-use wharf area for oil and oil products and having a bulky cargo wharf
for the coal-fired thermal power plant.
·Wharves of the Southern Van
Phong Petrochemical Complex: These include one wharf (of hard or SPM structure)
for imported-crude oil tankers of 320,000 DWT, wharves for exported-liquid
cargo ships of 10,000 - 50,000 DWT, one wharf for ships of 10,000 DWT carrying
imported or exported dry cargoes. The annual total throughput is around 18.8
million tons, including 10 million tons of crude oil, 7.8 million tons of oil
products and 1 million tons of dry cargoes. The size and development of these
wharf areas will depend on the progress of construction of the Southern Van
Phong Petrochemical Complex.
·Wharves for the Van Phong
bonded petrol and oil depot: These are special-use wharves for petrol and oil
of the Van Phong bonded petrol and oil depot, and include an import wharf for
ships of 320,000 DWT (of hard or SPM structure), an import wharf for ships of
up to 150,000 DWT and five export wharves for ships of 10,000 - 50,000 DWT. The
annual total cargo throughput of this wharf area is around 20 million tons. By
2015, its annual throughput will be 10 million tons.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- Quy Nhon seaport: This is a
national general and regional major seaport of class I which consists of the
functional wharf areas of Quy Nhon - Thi Nai and Nhon Hoi and wharves of Tam
Quan, De Gi and a wharf of the Binh Dinh coal-fired thermal power plant.
+ Quy Nhon - Thi Nai wharf area:
This is general wharf area having special-use wharves for container cargoes and
petrol and oil products. This is the main wharf area of the seaport.
·Quy Nhon wharf: Its size will
be maintained with six existing piers for general cargo ships of 30,000 DWT
with a total length of 866 meters. Intensive investment will be made in
equipment, facilities and technologies to raise the annual throughput to 3.5 -
4 million tons.
· Quy Nhon new port wharf: To
invest in completing a wharf for container ships of 30,000 DWT with an annual
throughput of 1.5 – 3 million tons (150,000 - 290,000 TEU/year). By 2020, to
study and make additional investment in a downstream pier for ships of 30,000
DWT.
·Thi Nai wharf: This is a local
satellite general wharf. By 2015, to upgrade two existing piers for ships of
7,000 - 10,000 DWT. Its annual cargo throughput is between 0.5 and 1 million
tons.
·The Central Vietnam new port
wharf: To upgrade the existing wharf for ships of 10,000 - 15,000 tons with an
annual throughput of 0.5 million tons.
·Dong Da wharf: This is a local
satellite wharf which will be developed after other wharves in the region are
fully developed. It may be developed into two with a total length of 310 meters
for ships of 5,000 - 10,000 DWT with an annual cargo throughput of 0.5 - 1
million tons.
·Quy Nhon petrol and oil wharf:
To upgrade the existing buoyed wharf for oil tankers of 20,000 DWT with an
annual throughput of 0.5 million tons.
·An Phu petrol and oil wharf:
Its existing size will be maintained for ships of 1,000 DWT.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
+ The wharf of the Binh Dinh
coal-fired thermal power plant: This is a special-use wharf for imported coal
for the Binh Dinh coal-fired thermal power plant, consisting of between 1 and 4
piers for ships of 10,000 -100,000 DWT. Its annual cargo throughput is between
3.6 and 21 million tons.
- Nha Trang - Cam Ranh seaport:
This is a national general and local major seaport of class I, consisting of
the main functional wharf areas of Nha Trang and Cam Ranh and Truong Sa island
wharf.
+ Nha Trang wharf area: This is
a major passenger wharf for tourist services and having a general cargo wharf.
By 2015, to renovate the existing infrastructure with two landing stages (wharf
with two landing sides) with a total length of 552 meters for ships of 20,000
DWT and passenger ships of 70,000 GRT. By 2015, the annual throughput will be
around 1.5 million tons and 100,000 passenger arrivals. By 2020, to gradually
reduce the annual cargo throughput to 0.5 million tons for clean general and
container cargoes. To build the passenger wharf into a modern wharf for ships
of up to 100,000 GRT with an annual throughput of 250,000 passenger arrivals.
+ Mui Chut petrol and oil wharf:
To gradually reduce this wharf’s capacity before stopping its operation. The
whole imported petrol and oil volume for Nha Trang city will be handled by Van
Phong and Ba Ngoi wharf areas.
+ Cam Ranh wharf area: This is a
general and container cargo wharf area for ships of 30,000 - 50,000 DWT and
having a special-use wharf for construction materials, petrol and oil. This
area may be developed to have four wharves (including one existing wharf) for
ships of 30,000 - 50,000 DWT. By 2015, to invest in completing a 300-m wharf
for ships of 50,000 DWT. By 2020, to build an additional wharf. This area’s
annual cargo throughput will be 4.5 million tons by 2015 and 7.5 million tons
by 2020.
+ New special-use petrol and oil
and construction material wharves will be built to meet the needs of the market
and enterprises and in line with local construction master plans.
+ Truong Sa island wharf: To
build one or two wharves for ships of 1,000 -2,000 DWT in Sinh Ton and Truong
Sa Lon islands to serve people’s life, national defense and security.
- Vung Ro seaport: This is a
local general seaport of class II having a special-use wharf and consisting of
the functional wharf areas of western Vung Ro and eastern Vung Ro.
+ Western Vung Ro wharf area:
This is a general wharf area having a special-use wharf for oil products.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
· Bai Chua general wharf: This
wharf area may be developed to have three wharves for ships of 10,000 - 20,000
DWT with a land area of 16.5 ha and an annual cargo throughput of 2 - 3 million
tons. This is for future development of Vung Ro general wharf.
· Vung Ro oil wharf: To maintain
its existing size with one buoyed wharf for ships of 10,000 - 40,000 DWT with
an annual throughput of around 0.1 million tons.
+ Eastern Vung Ro wharf area:
This is a special-use wharf area for petrochemical purpose having a general
wharf.
·Vung Ro oil refinery wharf:
This is a special-use wharf directly serving the Vung Ro petrochemical plant.
It may be developed to have a wharf for imported crude oil carried by tankers
of 250,000 DWT; four or five wharves for export of oil products as well as dry
cargoes and general cargoes carried by ships of 10.000 - 50,000 DWT. Its annual
total throughout is between 4 and 7 million tons. It will be developed on
conditions and its size and development pace depend on the progress of
investment in the petrochemical plant.
·Bai Goc wharf area: This is a
special-use wharf area serving the Hoa Tam petrochemical industry zone. It may
be developed to have a wharf for tankers of 300,000 DWT carrying imported crude
oil and several wharves for export of products and general cargoes carried by
ships of 30,000 -50,000 DWT. This area will be developed on conditions and its
construction size depends on the progress of construction and size of the
petrochemical industry zone.
- Ninh Thuan seaport: This is a
local general seaport of class II having a special-use wharves being satellite
wharves of the general wharf area, and consisting of Ninh Chu wharf area, wharf
area for Ninh Thuan nuclear power plants and Ca Na - Doc Ham wharf area.
+ Ninh Chu wharf area: This is a
satellite local general wharf area which may be developed to have four wharves
for ships of 5,000 - 10,000 DWT with a total length of 600 meters and an annual
throughput of 1 - 1.5 million tons. By 2015, to build one or two new wharves
for ships of 5,000 - 10,000 DWT. Its annual throughput by 2015 will be between
0.5 and 0.8 million tons.
+ A wharf for Ninh Thuan I
nuclear power center: This is a special-use wharf directly serving the
construction and operation of Ninh Thuan I nuclear thermal power plant in Phuoc
Dinh district, and consisting a wharf for ships of up to 30,000 DWT.
+ A wharf for Ninh Thuan II
nuclear power center: This is a special-use wharf directly serving the
construction and operation of Ninh Thuan II nuclear thermal power plant in Vinh
Hai district, and consisting one wharf for ships of up to 30,000 DWT.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Its annual throughput is around
25 million tons. This area will be developed on conditions with its size depending
on the progress of investment in industrial parks.
- Ke Ga seaport: This is a local
general seaport of class II having satellite special-use wharves of the general
wharf area, and consisting of the functional wharf areas of Ke Ga, Phu Quy and
Phan Thiet and the wharf area of the Son My thermal power plant.
+ Ke Ga wharf area: This is a
special-use wharf area for bauxite and aluminum transportation, having general
wharves and other special-use wharves. Its development size will depend on the
exploitation and production of bauxite and aluminum;
+ Ke Ga petrol and oil wharf
area: This is a special-use wharf area serving the southern Central Vietnam
petrol and oil depots. It may be developed to have one or two wharves for ships
of 30,000 - 80,000 DWT with an annual throughput of 1-2 million tons.
+ Phu Quy and Phan Thiet
wharves: These are satellite local general wharves directly serving Phu Quy
island district and Phan Thiet city.
+ Phu Quy wharf: By 2015, to
maintain the existing wharf with a 51-m pier for ships of 1,000 - 2,000 DWT. By
2020, to upgrade and lengthen it to 190 meters. Its annual throughput is
between 0.1 and 0.2 million tons;
+ Phan Thiet wharf: To build a
new wharf for ships of 1,000 - 2,000 DWT on a land area of 2 ha and with an
annual throughput of 0.1 - 0.2 million tons.
+ The wharf area of the Son My
thermal power plant: This is a special-use wharf area serving the Son My
thermal power plant. One or two wharves may be built for ships of 10,000 -
80,000 DWT with an annual throughput of around 4 million tons for the thermal
power plant. It is planned as a potential major seaport for receiving liquefied
natural gas and of a size suitable to investors’ needs and capacity.
- Vinh Tan seaport: This is a
special-use seaport directly serving the Vinh Tan power center and for
transshipment of coal for regional coal-fired thermal power plants. It may be
developed to have six wharves for ships of 50,000 - 200,000 DWT with an annual
throughput of 25 million tons, including 13.5 million tons for the Vinh Tan
coal-fired thermal power plant. The remaining throughput is for transshipped
cargoes of other plants.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
b/ Planning of investment in,
renovation and upgrading of navigable channels
- To build a new navigable
channel from Quy Nhon - Thi Nai wharf area to Nhon Hoi wharf area for ships of
30,000 DWT upon the building of ports in Nhon Hoi area. In the first phase, to
dredge the channel for fully loaded ships of 5,000 DWT and partially loaded
ships of larger tonnage, later dredge the channel at a greater depth to suit
the throughput cargo volume and the progress of building Nhon Hoi wharf area.
- To upgrade the 16-km access
channel of Cam Ranh wharf area through Binh Ba bay for ships of 50,000 DWT.
- To upgrade Ninh Chu navigable
channel through Tri Thuy river up to standards for ships of 10,000 DWT which
can navigate on high tide. In the first phase, to dredge the channel for ships
of 5,000 DWT.
- To conduct regular dredging
and maintenance of other channels or use natural water depth of sea canals
without dredging.
c/ Priority projects through
2015
- For access channels: To build
an access channel of Van Phong international transshipment seaport.
- Wharves:
+ For general wharves: The
starting phase of Van Phong international transshipment seaport; to add a
container pier in Quy Nhon wharf area; to build pier No. 2 in Cam Ranh seaport;
to build new Phan Thiet – Binh Thuan wharf to serve Phu Quy island district; to
upgrade and renovate Nha Trang wharf to accommodate passenger ships of 70,000
GRT;
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
3. Policies, mechanisms and
solutions for implementation
- To step up the mobilization of
social resources for investment in developing seaport infrastructure in the
forms of PPP, BOT, BT,… To intensify investment promotion, encourage and create
favorable conditions for all economic sectors at home and abroad to invest in
developing seaports in the prescribed forms.
- To concentrate state budget
sources on investing in public infrastructure facilities (navigable channels
and breakwaters for common use) connected to important seaports. Wharf
infrastructure facilities will be largely built with funds lawfully mobilized
from enterprises. All infrastructure and port- linking infrastructure facilities
of seaport and wharves recommended by investors, including general wharves,
will be built with capital raised by these investors themselves.
- To study and permit on a pilot
basis foreign partners to invest in loading and unloading equipment and hire other
entities to operate port infrastructure facilities invested with domestic
capital (associated with transfer of advanced technologies).
- To further step up the
administrative reform in the management of investment and operation of wharves
toward simplicity and compliance with international standards.
- To enhance the state
management in the course of implementation of the master plan on development of
seaports in the group, paying attention to the master plan’s consistency and
harmonious integration with regional transport network development master
plans, construction master plans and socio-economic development general plans
of localities and territorial areas having seaports.
- To step up the building of
wharves and wharf areas for common use in economic zones and industrial parks
so as to promote the investment effectiveness and use of the coastline as a
natural resource for building seaports. To reserve appropriate land areas at
the rear of seaports for building goods distribution centers with logistic
functions.
- To further step up the
administrative reform in the management of investment and operation of seaports
toward simplicity and modernity; to study and apply on a pilot basis the model
of “port management office” at seaports where conditions permit.
- To step up the implementation
of the mechanism for development of Van Phong international transshipment
seaport, covering study of plans on effective operation of wharves in the
starting phase and the mechanism for management and mobilization of capital for
development investment in the whole seaport area which is synchronous, modern
and of the regional caliber.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
1. The Vietnam Maritime
Administration shall:
- Coordinate with
provincial-level People’s Committees and related agencies in publicizing and
managing the implementation of the approved master plan;
- Report the addition and
adjustment of functions and sizes of seaports and wharves to the Ministry of
Transport for consideration and decision;
- For potential seaports and
wharves: Summarize and report on practical needs and proposals of investors and
provincial-level People’s Committees to the Ministry of Transport for
consideration and decision;
- Annually coordinate with local
administrations and related agencies in inspecting the implementation of the
master plan, reviewing and proposing measures to handle projects implemented
not under the master plan, and reporting to the Ministry of Transport.
2. Ministries, sectors and
provincial-level People’s Committees shall:
- Direct investors in
formulating projects to build, renovate and upgrade seaports and navigable
channels in line with the approved master plan and in accordance with current
regulations on construction investment management.
- Provincial-level People’s
Committees shall base themselves on the approved master plan to closely manage
and use for proper purposes land areas reserved for building seaports; arrange
land areas for synchronous development of seaports and infrastructure
facilities linked with seaports, service areas at the rear of seaports and
maritime service areas in order to assure favorable conditions for seaport
operation.
- Regarding the updating of
wharf areas and wharves not yet specified in this master plan:
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
+ For other wharf areas and
wharves: Provincial-level People’s Committees shall direct investors or
functional agencies in working out and sending detailed master plans to the
Ministry of Transport and the Vietnam Maritime Administration for study and
updating in the detailed master plan on the seaport group, and manage these
master plans.
Article 3. This Decision
takes effect on the date of its signing.
Article 4. The director
of the Office, the Chief Inspector of the Ministry of Transport, the directors
of the departments, the director of the Vietnam Maritime Administration, and
heads of related organizations and related individuals shall implement this
Decision.-
MINISTER
OF TRANSPORT
Ho Nghia Dung