DECISION
APPROVING
THE DETAILED MASTER PLAN ON THE SEAPORT GROUP IN NORTHERN CENTRAL VIETNAM
(GROUP 2) THROUGH 2020, WITH ORIENTATIONS TOWARD 2030
THE MINISTER OF TRANSPORT
Pursuant to the November 26,
2003 Construction Law; Pursuant to the June 14, 2005 Maritime Code of Vietnam;
Pursuant to the Government’s
Decree No. 51/2008/ND-CP of April 22, 2008, defining the functions, tasks,
powers and organizational structure of the Ministry of Transport;
Pursuant to the Government’s
Decree No. 92/2006/ND-CP of September 7, 2006, on elaboration, appraisal, approval
and management of socio- economic development master plans, and Decree No.
04/2008/ND-CP of January 11, 2008, amending and supplementing a number of
articles of Decree No. 92/2006/ND-CP;
Pursuant to the Prime
Minister’s Decision No. 2190/QD-TTg of December 24, 2009, approving the master
plan on development of Vietnam’s seaport system through 2020, with orientations
toward 2030;
Pursuant to Report No.
1657/TTr-CHHVN-KHDT of July 27, 2011, of the Vietnam Maritime Administration,
and the minutes of the meeting of the Appraisal Council in June 2011, on the
detailed master plan on the seaport group in northern Central Vietnam (Group 2)
through 2020, with orientations toward 2030;
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
DECIDES:
Article 1. To approve the
detailed master plan on the seaport group in northern Central Vietnam (Group 2)
through 2020, with orientations toward 2030, with the following principal
contents:
1. Scope of the master plan
Group 2 consists of seaports in
coastal provinces in northern Central Vietnam, including Thanh Hoa, Nghe An and
Ha Tinh. The scope of service of these seaports embraces all these provinces
and meets the need of the Lao People’s Democratic Republic (Laos) for cargo
shipping.
2. Development viewpoints and
objectives a/ Development viewpoints:
- To develop seaports in a
balanced manner and in harmony with the socio- economic development of the
region, centered on Thanh Hoa, Nghe An and Ha Tinh. Functions, role and size of
each seaport must be rational and in line with the master plan on development
of Vietnam’s seaport system through 2020, with orientations toward 2030, the
regional transport master plan and local socio-economic development master
plans.
- To pay special attention to
linking seaports and the national transport network and trade corridors with
Laos in order to assure the service function of the group of seaports. To
develop general wharves at Nghi Son, Cua Lo and Vung Ang seaports into key
major ones to meet short- and medium-range shipping needs and serve as
satellite seaports for international gateway and transshipment seaports; Dong
Hoi and Son Duong seaports will be special-use ones having general wharves and
linked to the East-West corridor axes, contributing to reducing the pressure of
the goods flow on the North-South road axis.
- To make intensive investments
in unloading equipment and technologies, manage the operation of seaports to
assure investment efficiency, exploit existing infrastructure facilities and
raise the cargo throughput of seaports.
- To closely combine seaport
development with environmental protection, assuring sustainable development as
well as security and national defense.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- General objectives: To develop
seaports in northern Central Vietnam (Group 2) in a synchrony and harmony among
general wharves and special-use wharves in order to serve the establishment and
development of key economic zones, industrial parks and concentrated industrial
establishments of the power, mining and petrochemical sectors in the region,
such as Nghi Son, Southeast Nghe An and Vung Ang economic zones and Dong Hoi
industrial park; and concurrently attract and meet Laos’s cargo shipping need.
- Specific targets:
+ To ensure a port throughput in
the planning points of time as follows:
. 68 ÷ 91 million tons/year by
2015;
. 129 ÷ 186 million tons/year by
2020;
. 263 million tons/year by 2030.
+ To attach importance to
development of three major seaports of Nghi Son, Cua Lo and Son Duong - Vung
Ang, thereby creating a driving force for development of coastal economic zones
in Thanh Hoa, Nghe An and Ha Tinh provinces.
3. Contents of the master plan
a/ Detailed planning of seaports
in the group by size, functions and tasks
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
+ South Nghi Son wharf area:
This area functions as a general and container wharf area, which has
special-use wharves and can accommodate ships of between 30,000 - 50,000 DWT.
In the first phase, to concentrate on developing general wharves besides existing
wharves No. 1 and No. 2, complete building wharves of Nghi Son thermal power
plant and transform the shipbuilding factory area into a functional area for
port operation and general oil and gas services. This area’s projected cargo
throughput will reach around 16 and 22 million tons/year by 2015 and 2020,
respectively.
+ North Nghi Son wharf area:
This area will be for building special-use wharves of Nghi Son petrochemical
refinery and plants and factories in the industrial park, which can accommodate
ships of between 30,000 - 50,000 DWT for cargo handling. This area’s projected
cargo throughput will reach 8 - 10 and 10 - 15 million tons/year by 2015 and
2020, respectively.
+ Hon Me island area offshore
Nghi Son seaport: To develop a transshipment wharf area for large ships of over
100,000 DWT, continue maintaining this area as one for military purposes,
mooring and storm- shelter, and step by step form passenger ship landing stages
for tourism development when conditions permit.
(Detailed planning parameters of
Nghi Son seaport are specified in the Transport Minister’s Decision No.
1401/QD-BGTVT of May 26, 2010).
+ Le Mon, Quang Chau and Quang
Nham wharf areas: These areas are local general seaports (class II). These
areas’ projected cargo throughput will reach around 0.5 and 1 million tons/year
by 2015 and 2020, respectively. These areas will accommodate ships of 1,000
DWT.
- Nghe An seaport: This is a
national and regional major general seaport (class I), which consists of South
Cua Lo wharf area, North Cua Lo wharf area and Dong Hoi special-use wharf area,
specifically as follows:
+ South Cua Lo wharf area: To
concentrate on effectively operating the four existing general wharves with
shipping channels to accommodate fully loaded ships of 10,000 DWT for handling
cargoes. To invest in machinery and equipment to raise their handling capacity;
to study investing in new wharves outward for ships of up to 20,000 DWT.
The cargo throughput at this
area is projected to reach 2.5 - 3 and over 3 million tons/year by 2015 and
2020, respectively.
+ North Cua Lo wharf area: This
is a container and general wharf area for large ships of between 30,000 and
50,000 DWT. The development of wharves in this area will be associated with the
development of the Southeast Nghe An economic zone according to needs and
investment capacity of this zone.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
+ Dong Hoi wharf area: This is a
special-use wharf area for direct import and export of goods for the thermal
power project, steel plant and construction material plant in Dong Hoi
industrial park of Nghe An province and the vicinities and can accommodate
ships of between 30,000 and 50,000 DWT to handle cargoes of a volume suitable
to needs and investment capability of Dong Hoi industrial park.
(Detailed planning parameters of
Dong Hoi seaport are specified in the Transport Minister’s Decision No.
1401/QD-BGTVT of May 26, 2010).
+ Ben Thuy and Cua Hoi wharf
areas: These are local general wharf areas which have special-use wharves and
can handle 0.75 and around 1.25 million tons of cargo/year by 2015 and 2020,
respectively, and accommodate ships of between 1,000 and 3,000 DWT.
- Son Duong - Vung Ang seaport:
This is a national and regional major general seaport (class I), which consists
of Vung Ang wharf area and Son Duong wharf area, including:
+ Vung Ang wharf area: This area
consists of general and container wharves and has special-use wharves, of which
general and container wharves constitute the core of the area and can
accommodate ships of up to 50,000 DWT while special-use wharves for thermal
power projects can accommodate coal-carrying ships of between 10,000 and 90,000
DWT.
+ Son Duong wharf area: This is
a special-use wharf area having general wharves to serve mainly behind-port
establishments of such heavy industries as metallurgy, petrochemical refining,
mining,… which can accommodate ships of between 100,000 and 350,000 DWT. To form
general and container wharves when those in Vung Ang are fully developed. To
consider locating a transshipment port for ships of over 100,000 DWT to serve
thermal power centers in the region. The cargo throughput at Son Duong - Vung
Ang seaport is projected to reach 35 - 37 and 77 - 80 million tons by 2015 and
2020, respectively.
+ Xuan Hai wharf: This is a
local general wharf which can handle 0.25 million tons of cargo/year and
accommodate ships of between 1,000 and 3,000 DWT.
+ Cua Sot wharf (Thach Khe): This
is a potential special-use wharf area to serve the mining industry when
necessary.
- Local general wharf areas:
These areas will develop mainly on existing infrastructure facilities and
intensive investment in human resources and equipment so as to raise operation
efficiency.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
b/ Planning of development of
seaport access channels
- Access channels of Nghi Son
seaport:
. Access channels of South Nghi
Son wharf area: From now to 2015, to exploit these channels at their actual
capacity, accommodating ships of 30,000 DWT. In subsequent periods, to dredge
the channels based on actual development of the seaport.
. To dredge shipping channels
for special-use wharf areas in order to assure effective operation of these
wharves on the basis of their investment capability.
- Access channels of Cua Lo
seaport: Access channels of South Cua Lo general and container wharf area: From
now to 2015, to upgrade existing channels for fully loaded ships of 10,000 DWT
which can enter or leave the seaport on a high water level. In subsequent
periods, to dredge the channels based on actual development of the seaport.
- Access channels of Vung Ang -
Son Duong seaport:
. Access channels of Vung Ang
wharf area: From now to 2020, to assure this area’s capacity to accommodate
fully loaded ships of 40,000 DWT and partially loaded ships of 50,000 DWT which
can enter or leave the seaport on a high water level. In subsequent periods, to
dredge the channels based on actual development of the seaport.
. To dredge shipping channels of
special-use wharf areas in order to assure effective operation of the wharves
on the basis of their investment capability.
- Access channels of local
general seaports
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
c/ Priority projects through
2015
- For channels: To renovate and
upgrade shipping channels so that fully loaded ships of 10,000 DWT can enter or
leave Cua Lo seaport on a high water level.
- For general wharves:
+ To study investment in building
piers for ships of up to 20,000 DWT in South Cua Lo wharf area.
+ To invest in building general
wharf No. 3 in Vung Ang for ships of up to 50,000 DWT with capital of seaport
enterprises.
- For special-use wharves:
+ To concentrate on building the
wharf area of Nghi Son petrochemical refinery, including a crude oil terminal
offshore Hon Me island and the wharf area for delivering solid and liquid
products of the plant.
+ Wharves to serve thermal power
centers in Nghi Son (Thanh Hoa) and Vung Ang (Ha Tinh).
4. Policies, mechanisms and
solutions for implementation
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- To concentrate state budget
sources on investing in public infrastructure facilities (navigable channels
and breakwaters for common use) connected to important seaports. Wharf
infrastructure facilities will be largely built with funds lawfully mobilized
from enterprises. All infrastructure and port- linking infrastructure
facilities of seaport and wharves recommended by investors, including general
wharves, will be built with capital raised by these investors themselves.
- To study and permit on a pilot
basis foreign partners to invest in loading and unloading equipment and hire
other entities to operate port infrastructure facilities invested with domestic
capital (associated with transfer of advanced technologies).
- To further step up
administrative reform in the management of investment and operation of wharves
toward simplicity and compliance with international standards.
- To enhance the state
management in the course of implementation of the master plan on development of
seaports in the group, paying attention to the master plan’s consistency and
harmonious integration with regional transport network development master
plans, construction master plans and socio-economic development general plans
of localities and territorial areas having seaports.
- To step up the building of
wharves and wharf areas for common use in economic zones and industrial parks
so as to promote the investment effectiveness and use of natural resources in
the coastline for building seaports. To reserve appropriate land areas behind
seaports for building goods distribution centers with logistic functions.
- To further step up
administrative reform in the management of investment and operation of seaports
toward simplicity and modernity; to study and apply on a pilot basis the model
of “port management office” at seaports where conditions permit; to facilitate
the location of working offices of maritime port authorities and specialized
state management agencies in new port areas in order to ensure prompt state
management at seaports; and to encourage investors in economic zones and
industrial parks to invest in seaport infrastructure and port-linking
infrastructure facilities.
Article 2. Management and
organization of implementation of the master plan
1. The Vietnam Maritime
Administration shall:
- Coordinate with
provincial-level People’s Committees and related agencies in publicizing and
managing the implementation of the approved master plan;
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- For potential seaports and
wharves: Summarize and report on practical needs and proposals of investors and
provincial-level People’s Committees to the Ministry of Transport for
consideration and decision;
- Annually coordinate with local
administrations and related agencies in inspecting the implementation of the
master plan, reviewing and proposing measures to handle projects implemented
not under the master plan, and reporting them to the Ministry of Transport.
2. Ministries, sectors and
provincial-level People’s Committees shall:
- Direct investors in formulating
projects to build, renovate and upgrade seaports and navigable channels in line
with the approved master plan and in accordance with current regulations on
construction investment management.
- Provincial-level People’s
Committees shall base themselves on the approved master plan to closely manage
and use for proper purposes land areas reserved for building seaports; arrange
land areas for synchronous development of seaports and port-linking
infrastructure facilities, service areas behind seaports and maritime service
areas in order to assure favorable conditions for seaport operation.
- Regarding the updating of
wharf areas and wharves not yet specified in this master plan:
+ For wharf areas and wharves
for different types of cargoes and built by different investors:
Provincial-level People’s Committees shall direct functional agencies in
working out and submitting detailed master plans to the Vietnam Maritime
Administration for appraisal and reporting to the Ministry of Transport for
consideration and approval.
+ For other wharf areas and
wharves: Provincial-level People’s Committees shall direct investors or
functional agencies in working out and submitting detailed master plans to the
Ministry of Transport and the Vietnam Maritime Administration for study and
updating in the detailed master plan on the seaport group, and manage these
master plans.
Article 3. This Decision
takes effect on the date of its signing.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
MINISTER
OF TRANSPORT
Ho Nghia Dung