THE
MINISTRY OF TRANSPORT
-------
|
SOCIALIST
REPUBLIC OF VIET NAM
Independence - Freedom – Happiness
---------
|
No.
1746/QD-BGTVT
|
Hanoi,
August 03, 2011
|
DECISION
APPROVING
THE DETAILED MASTER PLAN ON THE SEAPORT GROUP IN THE MEKONG RIVER DELTA (GROUP
6) THROUGH 2020, WITH ORIENTATIONS TOWARD 2030
THE MINISTER OF TRANSPORT
Pursuant to the November 26,
2003 Construction Law; Pursuant to the June 14, 2005 Maritime Code of Vietnam;
Pursuant to the Government’s
Decree No. 51/2008/ND-CP of April 22, 2008, defining the functions, tasks,
powers and organizational structure of the Ministry of Transport;
Pursuant to the Government’s
Decree No. 92/2006/ND-CP of September 7, 2006, on elaboration, appraisal, approval
and management of socio- economic development master plans, and Decree No.
04/2008/ND-CP of January 11, 2008, amending and supplementing a number of
articles of Decree No. 92/2006/ND-CP;
Pursuant to the Prime
Minister’s Decision No. 2190/QD-TTg of December 24, 2009, approving the master
plan on development of Vietnam’s seaport system through 2020, with orientations
toward 2030;
Considering Report No.
1353/TTr-CHHVN-KHDT of June 21, 2011, of the Vietnam Maritime Administration,
and the minutes of the meeting of the Appraisal Council on April 15, 2011, on
the detailed master plan on the seaport group in the Mekong River delta (Group
6) through 2020, with orientations toward 2030;
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
DECIDES:
Article 1. To approve the
detailed master plan on the seaport group in the Mekong River delta seaports
(Group 6) through 2020, with orientations toward 2030, with the following
principal contents:
1. Scope of the master plan
Group 6 consists of seaports in
13 provinces and cities in the Mekong River delta, Phu Quoc island and islands
in the southwestern sea (particularly, seaports on Soai Rap river in Long An
and Tien Giang provinces fall within the scope of the master plan of seaport
group 5).
2. Development viewpoints and
objectives a/ Development viewpoints:
- To develop seaports according
to the capability for and progress of renovation and upgrading of estuary
channels in the Mekong River delta; to study the possibility of developing
seaports seaward, thereby creating a driving force for development of coastal
economic zones and industrial parks-urban centers.
- To rationally develop regional
major general seaports, special-use seaports and local seaports to suit
characteristics and meet transportation needs of the regional waterway and road
transport networks and concurrently ensure their close connection with seaports
of Group 5 in a harmonious whole.
- To complete the building of
new navigable channels through Quan Chanh Bo canal to serve as a basis for the
development of infrastructure of Hau river ports, including the national
general and regional major port in Can Tho. To maintain the depth of Dinh An
channel for ships of 5,000 - 10,000 DWT. To develop seaports simultaneously
with seaport-connected infrastructure facilities and behind-port services.
- To mobilize all possible
domestic and overseas resources for seaport development and invest in seaport
infrastructure development.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
b/ Development objectives and
orientations:
- General objectives
The development of seaports in
the Mekong River delta aims to meet the demand for cargo throughput at these
seaports, ensuring their role as a driving force for socio-economic development
of the whole region; and create an important prerequisite for forming a synchronous
and transferable transport system, effectively organizing transportation in the
region, improving operation efficiency of the intra-regional and inter-
regional transport networks, thus reducing pressure on transport axes linking
the Mekong River delta and Ho Chi Minh City as well as time and costs of
transportation of exports and imports of the Mekong River delta through seaport
group 5.
- Specific targets
+ The port throughput at
different points of planning periods will be as follows:
· 56 - 70 million tons/year by
2015;
· 132 - 152 million tons/year by
2020;
· 216 - 305 million tons/year by
2030.
+ To build Can Tho port into a
national general and regional major port; local general ports and special-use
wharves on Tien river, Hau river, Ca Mau peninsula on the western coast and Phu
Quoc island will be satellite ports.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
+ To study the development of
Dinh An - Tra Vinh port (potential channel) in the water zone protected by
breakwaters under the Duyen Hai power plant project and channels for ships of
30,000 - 50,000 DWT or larger tonnage entering Hau river through Quan Bo Chinh
canal for handling exports or imports.
+ To upgrade and develop
intensively equipment, facilities and technological line for loading/unloading,
management and operation in order to quickly replace obsolete techniques and
technologies used at existing ports.
+ To complete investment in
building and maintaining channels for ships of 10,000 - 20,000 DWT entering Hau
river through Quan Chanh Bo canal; to study the possibility of upgrading
channels after 2020 on the basis of evaluating the stability of channels up to
2020; to maintain channels through Tieu estuary to Tien river, Dinh An estuary
to Hau river, Ganh Hao estuary to Ganh Hao river, Bo De estuary to Cai river,
access channels of Hon Chong general wharf area in Kien Giang province for
ships of up to 5,000 DWT and ships of up to 3,000 DWT to An Thoi and Vinh Dam
wharf areas in Phu Quoc province.
+ To consolidate physical and
technical foundations and complete equipment and facilities for the system of
management of operation of navigable channels, assuring maritime safety and
international and regional integration.
+ To raise the quality of
logistic services to make transportation more convenient and meet requirements
of intra-regional and inter-regional connection and effectively link various
transportation modes in order to reduce time and costs of transportation of
exports and imports.
3. Contents of the master plan
a/ Functional sub-zones and
tasks:
The seaport group in the Mekong
River delta consists of the following main types of ports:
- National general and regional
major port (class I), which is Can Tho port consisting of Cai Cui, Hoang Dieu -
Binh Thuy and Tra Noc - O Mon wharf areas (with main wharves handling general
cargoes and satellite special-use wharves of coastal industrial and service
establishments), of which Cai Cui is the main wharf area.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
+ On Tien river, there are the
following ports:
· In Dong Thap province: Cao
Lanh, Sa Dec and Lap Vo wharf areas.
· In Tien Giang province: My Tho
main wharf area.
· In Ben Tre province: Giao Long
main wharf area.
· Vinh Long province: Vinh Thai
and Binh Minh wharf areas.
+ On Hau river, there are the
following ports:
· In An Giang province: My Thoi
main wharf area.
· In Hau Giang province: Chau
Thanh main wharf area.
· In Soc Trang province: Dai
Ngai main wharf area.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
+ In Ca Mau peninsula, on the
western coast and Phu Quoc island, there are the following ports:
· In Bac Lieu province: Ganh Hao
main wharf area.
· In Ca Mau province: Nam Can
main wharf area.
· Kien Giang province: Hon
Chong, Kien Luong and Bai No main wharf areas.
· Phu Quoc port consists of An
Thoi, Vinh Dam and Mui Dat Do wharves.
- Special-use ports for imported
coal for thermal power plants
+ In the east of the Mekong
River delta: A major port for transshipment in Hau river estuary for ships of
over 100,000 DWT (offshore Tra Vinh or Soc Trang province); wharves of plants
in Duyen Hai - Tra Vinh, Long Phu - Soc Trang and Chau Thanh - Hau Giang, and a
reserve port for rallying cargoes in Kim Son - Tra Vinh.
+ In the west of the Mekong
River delta: A major port for transshipment in Nam Du islands for ships of over
100,000 DWT; and wharves of plants in Kien Luong - Kien Giang.
- Potential ports for
large-tonnage ships (beyond the channel renovating and upgrading capability)
for handling exports and imports directly for the Mekong River delta: To study
the development of Dinh An wharf area - Tra Vinh; and a cargo transshipment
port for ships of over 100,000 DWT offshore Hau river estuary.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
* Can Tho port - Can Tho city:
This is a national general and regional major port (class I)
- Hoang Dieu - Binh Thuy wharf
area: To consolidate and upgrade the existing Hoang Dieu wharf without any
expansion. This area is mainly for general and container cargoes carried by
ships of up to 10,000 DWT. Its annual throughput will be between 2 and 2.5
million tons by 2015 and around 3 million tons by 2020.
To rearrange and relocate
special-use wharves in Binh Thuy area, retaining only wharves necessary for
combined defense-security and ship building and repair purposes.
- Cai Cui wharf area: This is
the main wharf area of Can Tho port capable of accommodating ships of up to 20,000
DWT. Its annual throughput will be between 3.5 and 4 million tons by 2015 and
between 6 and 7 million tons by 2020. In addition to this general wharf area,
there are also special- use wharves for petrol, oil, construction materials and
other products of production and processing establishments in the industrial
park.
- Tra Noc - O Mon wharf area:
This area consists of general and special- use wharves serving industrial and
service establishments along the river and capable of accommodating ships of
5,000 - 10,000 DWT. Its annual throughput will be between 1 and 1.5 million
tons by 2015 and between 2.5 and 3 million tons by 2020.
* Ports on Tien river: These are
local general ports (class II)
- In Dong Thap province: Cao
Lanh and Sa Dec wharf areas are for ships of up to 5,000 DWT. Their annual
throughput will be between 0.6 and 0.8 millions tons by 2015 and between 2 and
2.5 million tons by 2020.
- Lap Vo wharf area is for ships
of 5,000 - 10,000 DWT, including also a behind-port logistics center. It annual
throughput will be between 0.3 and 0.5 million tons by 2015 and between 1.3 and
1.5 million tons by 2020.
- In Tien Giang province: My Tho
wharf area is for ships of 5,000 DWT. It annual throughput will be between 0.4
and 0.5 million tons by 2015 and between 1 and 1.5 million tons by 2020.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- In Ben Tre: Giao Long wharf
area is for ships of up to 5,000 DWT. It annual throughput will be between 0.3
and 0.5 million tons by 2015 and between 0.8 and 1 million tons by 2020.
* Ports on Hau river: These are
local general ports (class II)
- In An Giang province: My Thoi
wharf area is for ships of 10,000 DWT.
It annual throughput will be
between 1.3 and 1.5 million tons by 2015 and between 2.8 and 3.5 million tons
by 2020.
- In Hau Giang province: To
build in Hau river industrial park in Chau Thanh district a wharf area for
ships of 10,000 - 20,000 DWT (partially loaded), including also a behind-port
logistic center. It annual throughput will be between 0.8 and 1 million tons by
2015 and between 2 and 2.5 million tons by 2020.
- In Tra Vinh province: To build
in Tra Cu district a wharf area for ships of 10,000 - 20,000 DWT (partially
loaded), including also a behind-port logistic center. It annual throughput
will be between 0.3 and 0.5 million tons by 2015 and between 0.8 and 1 million
tons by 2020.
To study the building of a new
Dinh An wharf area within the port water zone protected by breakwaters of the
Duyen Hai thermal power project and Quan Chanh Bo canal channel project, for
ships of 30,000 - 50,000 DWT or larger tonnage. This area has potential to be
become a port for large- tonnage seagoing ships to carry exports and imports of
the Mekong River delta.
- In Soc Trang province: To
build in Dai Ngai district a new wharf area for ships of 10,000 - 20,000 DWT
serving the Long Phu power center and industrial park. It annual throughput
will be between 0.8 and 1 million tons by 2015 and between 1.8 and 2 million
tons by 2020.
* Ports in Ca May peninsula and
on the western coast: These are local general ports (class II)
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- In Bac Lieu province: To build
in Ganh Hao a wharf area for ships of up to 5,000 DWT. It annual throughput
will be between 0.5 and 0.8 million tons by 2015 and between 1 and 1.5 million
tons by 2020. This area will have special-use wharves for industrial and
service establishments in the region.
- In Kien Giang province:
+ To restore the existing Hon
Chong wharf area into a main wharf area of the seaport which can accommodate
ships of up to 5,000 DWT. It annual throughput will be between 0.3 and 0.5
million tons by 2015 and between 2 and 2.5 million tons of cargo and between
200,000 and 250,000 passengers by 2020.
+ Bai No - Ha Tien wharf area
consists of cargo wharves and passenger landing stages serving the border-gate
economic zone and accommodating ships of up to 3,000 DWT. It annual throughput
will be between 0.3 and 0.5 million tons of cargo and between 200,000 and
250,000 passengers by 2020.
+ Kien Luong special-use wharf
area for cement, coal for power plants, petrol, oil, etc.
- Phu Quoc seaport:
+ An Thoi wharf area
accommodates ships of 3,000 DWT at hard wharves and ships of 30,000 DWT at
buoyed wharves. It annual throughput will be between 0.3 and 0.5 millions tons
of cargo and between 420,000 and 430,000 passengers by 2015, and between 0.5
and 0.6 million tons of cargo and between 190,000 and 250,000 passengers by
2020.
+ Vinh Dam wharf area has hard
wharves for cargo ships of 3,000 DWT and passenger ships of 250 seats, and
buoyed wharves for liquid cargoes of 5,000 DWT and international tourist ships
of up to 80,000 GRT. It annual throughput will be between 0.2 and 0.3 million
tons of cargo and between 200,000 and 230,000 passengers by 2015, and between
0.6 and 0.7 million tons of cargo and between 760,000 and 880,000 passengers by
2020.
+ The area of landing stages for
international tourist ships in Mui Dat Do is for passenger ships of 80,000 -
100,000 GRT and concurrently for handling exports and imports of Phu Quoc
island. It annual throughput will be between 200,000 and 300,000 passengers and
between 0.1 and 0.15 million tons of cargo by 2020.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- In the west of the Mekong
River delta: To build in the northwest of Hon Lon island of Nam Du archipelago
a new seaport having wharves for ships of up to 200,000 DWT (carrying imported
coal) and ships/sea barges of up to 10,000 DWT (transporting coal to plants).
Its annual throughput will be 12 million tons and 24 million tons by 2015 and
2020, respectively.
- In the east of the Mekong
River delta: To study rational solutions of floating wharves or hard wharves in
Hau river estuary. These wharves’ annual throughput will be between 22 and 30
million tons and between 35 and 57 million tons by 2020 and 2030, respectively.
(The detailed list of seaports
in the group with their specific sizes and functions is printed in the Appendix
and the master plan dossier attached to this Decision - not printed herein).
c/ Planning of navigable
channels
- Access channels of ports on
Hau river: The main channel is through Quan Chanh Bo canal for fully loaded
ships of 10,000 DWT and partially loaded ships of 20,000 DWT. Based on the
assessment of the stability of service projects by 2020, to study the possibility
of channel upgrading to raise the throughput and meet shipping needs after
2020. The channels through Dinh An estuary will be maintained for ships of
5,000 - 10,000 DWT which enter and leave on high tide. The channels through
Dinh An estuary will be maintained for inland waterway vessels and fishing
ships.
- Access channels of ports on
Tien river: To maintain the depth of the channels through Tieu estuary for
ships of 5,000 DWT to regularly enter and leave on high tide.
- Access channels of ports in Ca
Mau peninsula: To make the best use of the natural depth and high tide to
navigate ships of between 3,000 and 5,000 DWT through the estuary to Ganh Hao
and Cua Lon rivers; and step by step increase the estuary channel depth to suit
navigation density and throughput at ports.
- Access channels of ports on
the western coast: To maintain access channels of special-use wharves of Binh
Tri - Kien Luong for ships of 10,000 DWT. To step by step upgrade access
channels of Hon Chong wharf area for ships of 5,000 DWT.
- To consolidate physical and
technical foundations and management equipment and facilities to assure
maritime safety on access channels, attaching special importance to the
international maritime routes to Cambodia through Tien and Hau rivers.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- From now to 2015, to complete
the project on channels for large-tonnage seagoing ships to enter Hau river
through Quan Chanh Bo canal; dredge and maintain Dinh An - Hau river channels
for partially loaded ships of 5,000 - 10,000 DWT to navigate on high tide;
channels of Cua Lon river through Bo De estuary to Nam Can seaport.
- For general wharves: To
complete wharf areas of Cai Cui in Can Tho province, Nam Can in Ca Mau province
and An Thoi on Phu Quoc island.
- For special-use wharves:
Special-use wharves are for transportation of imported coal for power centers
of Duyen Hai in Tra Vinh province, Long Phu in Soc Trang province, Chau Thanh
in Hau Giang province and Kien Luong in Kien Giang province.
3. Policies, mechanisms and
solutions for implementation
- To step up the mobilization of
social resources for investment in developing seaport infrastructure in the
forms of PPP, BOT, BT,… To intensify investment promotion, encourage and create
favorable conditions for all economic sectors at home and abroad to invest in
developing seaports in the prescribed forms.
- To concentrate state budget
sources on investing in public infrastructure facilities (navigable channels
and breakwaters for common use) connected to important seaports. Wharf
infrastructure facilities will be largely built with funds lawfully mobilized
from enterprises. All infrastructure and port- linking infrastructure
facilities of seaport and wharves recommended by investors, including general
wharves, will be built with capital raised by these investors themselves.
- To study and permit on a pilot
basis foreign partners to invest in loading and unloading equipment and hire
other entities to operate port infrastructure facilities invested with domestic
capital (associated with transfer of advanced technologies).
- To further step up the
administrative reform in the management of investment and operation of wharves
toward simplicity and compliance with international standards.
- To enhance the state
management in the course of implementation of the master plan on development of
seaports in the group, paying attention to the master plan’s consistency and
harmonious integration with regional transport network development master
plans, construction master plans and socio-economic development general plans
of localities and territorial areas having seaports.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Article 2. Management and
organization of implementation of the master plan
1. The Vietnam Maritime
Administration shall:
- Coordinate with
provincial-level People’s Committees and related agencies in publicizing and
managing the implementation of the approved master plan;
- Report the addition and
adjustment of functions and sizes of seaports and wharves to the Ministry of
Transport for consideration and decision;
- For potential seaports and
wharves: Summarize and report on practical needs and proposals of investors and
provincial-level People’s Committees to the Ministry of Transport for
consideration and decision;
- Annually coordinate with local
administrations and related agencies in inspecting the implementation of the
master plan, reviewing and proposing measures to handle projects implemented
not under the master plan, and reporting to the Ministry of Transport.
2. Ministries, sectors and
provincial-level People’s Committees shall:
- Direct investors in
formulating projects to build, renovate and upgrade seaports and navigable
channels in line with the approved master plan and in accordance with current
regulations on construction investment management.
- Provincial-level People’s
Committees shall base themselves on the approved master plan to closely manage
and use for proper purposes land areas reserved for building seaports; arrange
land areas for synchronous development of seaports and infrastructure
facilities linked with seaports, service areas at the rear of seaports and
maritime service areas in order to assure favorable conditions for seaport
operation.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
+ For wharf areas and wharves
for different types of cargoes and built by different investors:
Provincial-level People’s Committees shall direct functional agencies in working
out and sending detailed master plans to the Vietnam Maritime Administration
for appraisal and reporting to the Ministry of Transport for consideration and
approval.
+ For other wharf areas and
wharves: Provincial-level People’s Committees shall direct investors or
functional agencies in working out and sending detailed master plans to the
Ministry of Transport and the Vietnam Maritime Administration for study and
updating in the detailed master plan on the seaport group, and manage these
master plans.
Article 3. This Decision
takes effect on the date of its signing.
Article 4. The director
of the Office, the Chief Inspector of the Ministry of Transport, the directors
of the departments, the director of the Vietnam Maritime Administration, and
heads of related organizations and related individuals shall implement this
Decision.-
MINISTER
OF TRANSPORT
Ho Nghia Dung