MINISTRY OF
CONSTRUCTION OF VIETNAM
--------
|
THE SOCIALIST
REPUBLIC OF VIETNAM
Independence – Freedom – Happiness
---------------
|
|
No: 16/2025/TT-BXD
|
Hanoi, June 30,
2025
|
CIRCULAR
ELABORATING THE LAW ON URBAN AND RURAL PLANNING
Pursuant to the Law on Urban
and Rural Planning No. 47/2024/QH15 dated November 26, 2024;
Pursuant to Decree No.
33/2025/ND-CP dated February 25, 2025 of the Government on the functions,
tasks, powers and organizational structure of the Ministry of Construction;
At the request of the
Director of the Department of Planning and Architecture,
The Minister of Construction
hereby issues a Circular elaborating the law on urban and rural planning.
Chapter I
GENERAL PROVISIONS
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
1. This Circular details Clause
4 of Article 16, Clause 2 of Article 22, Clause 3 of Article 23, Clause 3 of
Article 24, Clause 4 of Article 27, Clause 3 of Article 29, Clause 2 of Article
31, Clause 2 of Article 34, Clause 3 of Article 35, Clause 5 of Article 40,
Point a of Clause 2 and Clause 3 of Article 47, Clauses 4 and 6 of Article 52
of the Law on Urban and Rural Planning.
2. Domestic and foreign
organizations and individuals when preparing or participating in preparing dossiers
on tasks in planning, urban and rural planning in Vietnam must comply with the
regulations herein.
Article 2.
General provisions on the composition of dossiers on tasks in planning, urban
and rural planning
1. The approved dossier on
tasks in planning, urban and rural planning is a paper dossier that has the
confirmation stamp of the competent authority.
2. The electronic dossier
(e-dossier) on urban and rural planning is a collection of related electronic
documents, including:
a) The basic digital database
that includes the drawing and text files printed as part of the paper dossier
with full content specified in Chapter II, Chapter III hereof, excluding
relevant documents and materials;
b) The legal digital database
that includes files digitized, scanned from paper or electronically certified
dossiers, with full components as specified in Chapter II, Chapter III hereof;
c) The digital geographic
information system (GIS) of urban and rural planning that includes files
converted into geographic data from the original database;
d) The e-dossiers on urban and
rural planning that must be prepared simultaneously during the process of
making, appraising and approving the task in planning, urban and rural
planning; ensuring that it meets the requirements for the management and use of
the urban and rural planning database;
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
3. Documents on collection of
opinions
a) The document on collection
of public opinions includes a summary report; drawings as prescribed, meeting
the requirements for collecting opinions as determined in the tasks in
planning;
b) The document on collection
of opinions from agencies and organizations includes paper documents
(description, drawings in appropriate scale, relevant legal documents) and
e-dossiers specified in Point a, Point b of Clause 2 of this Article.
4. The application for
appraisal
a) Written request for
appraisal of tasks in planning, urban and rural planning;
b) Paper dossier showing the
content and components of the dossier on tasks in planning, urban and rural
planning ensuring compliance with the regulations in Chapter II, Chapter III
hereof;
c) E-dossiers as prescribed in
Clause 2 of this Article.
4. The application for approval
includes:
a) written request for approval
of tasks in planning, urban and rural planning;
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
c) Report on the appraisal of
tasks in planning, urban and rural planning;
d) E-dossiers as prescribed in
Clause 2 of this Article.
5. Regulations on confirmation
stamps on approved urban and rural planning dossiers.
a) After the urban and rural
planning is approved by the competent authority, the agencies and organizations
that formulate such planning shall completes the dossier according to the
approval decision and sends it to the planning appraisal agency for
confirmation stamp according to the form specified in the Appendix attached
hereto.
b) The appraisal agency shall
use the confirmation stamp to stamp the description and drawings (all copies)
in the dossier on tasks in planning and the planning.
c) Number of dossiers that have
confirmation stamp: 07 sets.
Article 3.
General provisions on the specifications of dossiers on tasks in planning,
urban and rural planning
1. The contents of
descriptions, drawings of tasks and projects in the documents on collection of
opinions and the documents that have been submitted for appraisal and approval
shall be clearly and fully stated for each type and level of planning and
comply with regulations of Chapter II and Appendices hereof.
2. Drawing abbreviations and
symbols of tasks and urban and rural planning shall comply with regulations of
Appendices hereof.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
4. All diagrams and maps in the
drawings of the dossiers on tasks and projects on urban and rural planning
shall clearly show the boundaries of planning; the boundaries and names of
administrative divisions within the planning scope; name of administrative unit
adjacent to the perimeter of the planned area.
Chapter
II
TASKS IN URBAN AND RURAL
PLANNING
Article 4.
Regarding Master planning
1. Description:
a) Reasons, necessity and
grounds for master planning; location, planning scope, and scale of planned
area.
b) Overview of natural
characteristics and status quo of the planned area; summary of main problems
encountered during management and development.
c) Orientation to development
in national planning, regional planning and planning options in the provincial
planning and projects in progress that affect the scope of general urban
planning.
c) Identification of
properties, driving force, role and function of planned areas for the country,
region and province; viewpoints and objectives of development; identification
of main problems that must be addressed in planning.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
e) Requirement for the level of
survey, collection of documents and data, status quo assessment; requirement
for status quo database (including geographic data);
g) Research requirements on the
contents of the master planning suitable to the type of planning and the case
of planning formulation.
g) Identification of the list
of drawings, descriptions and attached appendices; the quantity and
specifications of the dossiers on master planning; cost estimates; plans and
progress in formulating master planning; determination of requirements for
contents, forms and enquired entities.
2. Written request for approval
of tasks in master planning and draft Decision of competent authority on
approval of such tasks.
3. Relevant documents:
a) Previous approval decisions
of the master planning (if any); Decisions on approval of planning and ongoing
projects affecting the scope of the planning.
b) Directives and instructions
from competent authorities on organizing the master planning formulation.
c) Other relevant documents.
4. Drawings:
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
b) Maps showing boundaries and
scope of the master planning.
c) Drawings in the dossier on
tasks in master planning with an suitable scale based on the orientation maps
for the development of the national urban-rural system; development orientation
maps for urban-rural systems; and planning option maps for urban-rural systems.
5. In addition to the above
requirements, the dossier on tasks in master planning must also satisfy the
following:
a) For expanded or new urban area:
must fully justify the basis and grounds for selecting urban development
directions and determining the planning scope and area size.
b) For communes: must determine
requirements for collecting information, documents, and data on status quo and
forecasted development of agricultural production activities; requirements for
assurance of food security in the commune; determine existing areas that have
been developed (according to urban standards) or planned according to urban
standards.
c) For economic zones: must
determine the requirements for collecting information, documents, and data on
the status quo and forecasted development of industry, agriculture, trade,
service, and logistics of relevant regions and provinces, and their impact on
the development objectives of the economic zone.
d) For national tourism zones:
must determine the requirements for collecting information, documents, and data
on status quo and forecasted development based on tourism potential and tourism
demand of the country and relevant regions, and provinces, and their impact on
development objectives of the tourism zone.
Article 5.
Regarding subdivision planning
1. Description:
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
b) Overview of natural
characteristics and status quo of the area subject to subdivision planning
c) Development orientations in
the provincial planning, higher-level planning, or other technical planning
affecting the subdivision planning; preliminarily identify main problems to be
addressed and requirements for elaborating the approved superior planning;
d) Determination of population
and labor scale, land use demand, and requirements for technical and social
infrastructure for the planned area;
dd) Determination of
requirements for surveys, data collection, analysis, and assessment of the
status quo to ensure full content as prescribed in Chapter III hereof;
requirements for the status quo database;
e) Requirements on the contents
of the subdivision planning;
g) Determination of the list of
drawings, descriptions, attached appendices; quantity and specifications of
subdivision planning dossiers; cost estimates; plans and progress in
formulating subdivision planning;
h) Determination of
requirements on content, form enquired entities, and plan for collecting
opinions on the subdivision planning.
2. Written request for approval
of tasks in subdivision planning and draft Decision of competent authority on
approval of such tasks.
3. Relevant documents:
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
b) Directives and instructions
from competent authorities on organizing the subdivision planning formulation.
c) Other relevant documents.
4. Drawings:
a) Location diagram of the
planned area according to the provincial planning, master planning, or other
technical planning;
b) Map identifying the planning
scope and scale of planned area;
c) Drawings in the dossier on
tasks in subdivision planning that are shown in a suitable scale in topographic
status quo map combined with space development orientation map or map of land
use for planning.
5. For subdivision planning for
functional areas based on provincial planning, regional planning, or other
technical planning, in addition to the above requirements, the following must
also be satisfied:
a) Arguments for determining
the location and boundaries of the planned area in cases where the provincial
planning, regional planning, or other technical planning does not specify these
contents;
b) Identification of forecasted
development based on the nature, development potential, and demands of the
country, relevant regions and/or provinces, and their impact on the development
objectives of the functional area. Identification of arising economic, social,
technical, and environmental problems from the establishment of the functional
area according to the provincial planning, regional planning, or other
technical planning.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
1. Description:
a) Reasons, necessity and
grounds for detailed planning; location, boundary scope, area, and function of
the detailed planned area; preliminary development orientations in the master
planning and contents of subdivision planning that are approved affecting the
detailed planned area; state management and development investment demands for
the detailed planned area. The detailed planning must be consistent and
synchronous to elaborate the approved master planning or subdivision planning;
b) Assessment of natural
characteristics and status quo; identification of basic problems and contents
to be addressed in the detailed planning and requirements for elaborating the
subdivision planning.
c) Estimated population and
labor scale; basic quotas applied regarding use of land, social infrastructure,
and technical infrastructure based on regulations of the approved subdivision
planning and master planning.
d) Specific requirements for
surveys, data collection, assessment of the status quo; requirements for the
status quo database.
dd) Requirements regarding the
contents of the detailed planning; requirements for intended construction items
within the detailed planned area; determination of requirements for research on
spatial organization, landscape architecture, land use, technical
infrastructure connections, and other requirements.
e) Determination of the list of
drawings, descriptions, attached appendices; quantity and specifications of
detailed planning dossiers; cost estimates; plans and progress in formulating
detailed planning;
g) Determination of
requirements on content, form enquired entities, and plan for collecting
opinions on the detailed planning.
2. Written request for approval
of tasks in detailed planning and draft Decision of competent authority on
approval of such tasks.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
a) Approval decisions of the
relevant planning; previous approval decisions of master planning, subdivision
planning, detailed planning (if any).
b) Directives and instructions
from competent authorities on organizing the detailed planning formulation.
c) Other relevant documents.
4. Drawings:
a) Location diagram of the
detailed planned area extracted from the approved subdivision or master
planning;
b) Map of the research scope
and boundaries of the detailed planned area;
c) Drawings of the detailed
planning task dossier that are shown in a suitable scale in the topographic
status quo map combined with the general land use map or spatial organization
and landscape architecture diagram of the approved subdivision planning.
Article 7.
Regarding separate urban designs
1. Description:
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
b) Determination of the
research scope and boundaries for formulating the separate urban design;
objectives, principles for formulating the urban design; and the required
content to be satisfied for the separate urban design.
c) Requirements and research
contents regarding spatial organization, landscape architecture, and layout of
works; requirements for research on urban conservation regulations for ancient
or old urban areas (if any); requirements for infrastructure systems and
environment.
2. Written request for approval
of tasks related to separate urban design and draft Decision of competent
authority on approval of such tasks.
3. Relevant documents:
a) Decisions on master
planning, subdivision planning (if any).
b) Directives and instructions
from competent authorities on organizing the separate urban design formulation;
c) Other relevant documents.
4. Drawings:
a) Location diagram and boundaries
of the separate urban design extracted from the approved general or subdivision
planning;
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Article 8.
Regarding underground space planning for centrally affiliated cities
1. Description:
a) Reasons, necessity and grounds
for underground space planning; location, planning scope, and scale of planned
area. Preliminary development orientations in the general urban planning and
contents of subdivision planning that are approved affecting the underground
space planned area. State management and development investment demands for the
planned area. The underground space planning must be consistent and
synchronized with technical infrastructure planning and elaborate the approved
master planning.
b) General assessment of natural
characteristics and status quo; identification of basic problems and contents
to be addressed in the underground space planning and requirements for
elaborating the approved master planning.
c) Estimated demand for
underground space use; basic quotas applied for use of land, space, and
infrastructure systems in accordance with regulations of the approved master
planning and development requirements;
d) Specific requirements for
surveys, data collection, assessment of the status quo; requirements for the
status quo database.
dd) Requirements regarding the
main contents of the underground space planning; planned underground work items
to be invested in; determination of requirements for research on spatial
organization, architecture, landscape, land use, technical infrastructure
connection, and other requirements;
e) Determination of the list of
drawings, descriptions and attached appendices; the quantity and specifications
of the dossiers on planning; cost estimates; plans and progress in formulating
master planning; determination of requirements for contents, forms and enquired
entities.
2. Written request for approval
of tasks in underground space planning and draft Decision of competent
authority on approval of such tasks.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
a) Approval decisions of the
relevant planning; approval decisions of master planning, subdivision planning,
detailed planning (if any).
b) Directives and instructions
from competent authorities on organizing the underground space planning
formulation.
c) Other relevant documents.
4. Drawings:
a) Location diagram, map of the
underground space planned area based on the approved master planning;
c) Drawings in the dossier on
tasks in underground space planning that are shown in a suitable scale in
topographic status quo map combined with map of land use for planning in the
approved master planning.
Article 9.
Regarding technical planning for centrally affiliated cities
1. Description:
a) Reasons, necessity and
grounds for technical planning; location, planning scope, and scale of planned
area. Preliminary development orientations in the general urban planning and
contents of subdivision planning that are approved affecting the technical
planned area. State management and development investment demands for the planned
area. The technical planning must be consistent and synchronized with
underground space planning and elaborate the approved master planning.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
c) Estimated demand for
technical infrastructure use; basic quotas applied for use of land, space, and
infrastructure systems in accordance with regulations of the approved master
planning and development requirements;
d) Specific requirements for
surveys, data collection, assessment of the status quo; requirements for the
status quo database.
dd) Requirements regarding the
main contents of the technical planning; planned technical infrastructure work
items to be invested in; determination of requirements for research on spatial
organization and connection, technical infrastructure and other requirements;
e) Determination of the list of
drawings, descriptions and attached appendices; the quantity and specifications
of the dossiers on planning; cost estimates; plans and progress in formulating
master planning; determination of requirements for contents, forms and enquired
entities.
2. Written request for approval
of tasks in technical planning and draft Decision of competent authority on
approval of such tasks.
3. Relevant documents:
a) Approval decisions of the
relevant planning; approval decisions of master planning, subdivision planning,
detailed planning (if any).
b) Directives and instructions
from competent authorities on organizing the technical planning formulation.
c) Other relevant documents.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
a) Location diagram, map of the
technical planned area based on the approved master planning;
c) Drawings in the dossier on
tasks in technical planning that are shown in a suitable scale in topographic
status quo map combined with map of land use for planning in the approved
master planning.
Chapter
III
DOSSIERS ON URBAN AND
RURAL PLANNING
Section 1.
DOSSIERS ON MASTER URBAN AND RURAL PLANNING
Article
10. Regarding centrally affiliated cities
1. Description:
a) Reasons, necessity and
grounds for master planning for the centrally affiliated city;
b) Analysis of location and
assessment of natural conditions; economic development status quo; status quo
of urban systems and functional areas; current population and distribution of
urban and rural residents; current land use in urban and rural areas of the
entire city (including urban areas, rural areas, functional areas, agricultural
production areas, forestry areas, and other areas according to the city’s
characteristics); current land use in urban areas with population equivalent to
that of Class I cities; current architectural and landscape zoning; status quo
of social infrastructure, housing, technical infrastructure, and environment.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
d) Determination of
requirements and contents in accordance with approved national, regional, and
provincial planning for the city’s development orientation.
dd) Determination of
viewpoints, objectives, nature, and premises for development of the city.
e) Forecast of population,
labor, and land area; determination and selection of quotas for technical
infrastructure, social infrastructure, and environment for urban and rural
areas within the city.
g) Determination of principles
and criteria for selecting urban development structure options.
h) Determination of the overall
spatial model and structure of the urban-rural system within the city; scope,
boundaries, and space development orientation of urban and rural areas
consistent with the urban system development option in the provincial planning.
i) Orientation for organization
of space for functional areas; key development areas; areas of national
importance in terms of politics, culture, history, security, and defense (if
any); system of administrative, educational, health, cultural, sports centers,
and other centers at national, regional and city levels.
k) Orientation for zoning of
architecture and landscape; green spaces and water surfaces; gateways; main
spatial corridors; city landmarks; conservation of natural landscapes and
cultural heritage.
l) Orientation for land use of
the whole city by stages, including determination of areas for: urban
development, rural development, development of functional areas, agricultural
production, forestry, security, defense, and other management-required areas;
Determination of land use demands for housing and social housing development.
For urban areas with population equivalent to that of a Class I city, the scale
for land use functions shall be determined in accordance with Appendix I
attached hereto.
m) Orientation for underground
space and technical infrastructure development, including: Orientation for
development of underground space and technical infrastructure planning for the
whole city: Determination of the external transport networks (road, railway,
waterway, airway); locations and scale of airports, seaports, river ports,
railway stations; urban road and railway (overhead, above ground and
underground); locations and scale of external bus stations; reserves, demand,
and supply sources for water and energy; total wastewater and solid waste
volumes; locations, scale, and capacity of headworks and
transmission/distribution lines for water supply, energy, lighting,
telecommunications, drainage; locations and scale of solid waste treatment
sites, cemetery services, and other facilities for urban and other functional
areas of the city;
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
n) Proposals of environmental
protection solutions within the planning scope: Establishment of protection and
restoration areas affected by construction investment activities; requirements
for waste management and pollution control during construction investment
according to the planning.
o) Arguments and determination
of priority investment programs and projects for each planning phase, ensuring
feasibility of implementation.
2. Written request for approval
of the master planning and draft Decision of competent authority on approval of
such planning.
3. Relevant documents:
a) Decision on approval of
tasks in master planning; directives and instructions from competent
authorities regarding master planning formulation;
b) Approval decisions of the
relevant planning; previous approval decision of master planning (if any).
c) Other relevant documents.
4. Drawings:
a) Diagram of location and
regional relationship including: Location, scale and boundary of the planned area;
relationships regarding natural, socio-economic, urban space development,
technical infrastructure, and environment under national and regional planning
affecting the planned city. Drawings that are shown in a suitable scale in the
map of orientations for the development of the national urban-rural system; map
of orientations for the development of urban-rural systems.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
c) Status quo map of urban
areas with population equivalent to that of a Class I city: Status quo of
functional areas according to the Appendix attached to; architecture and
landscape; social infrastructure (education, health, culture, commerce, green
spaces, housing); technical infrastructure (transport, urban electricity supply
and urban lighting, telecommunications, water supply, ground elevation and
rainwater drainage, wastewater drainage; solid waste management, cemetery
services, environment). Drawings are shown in a topographic map at a scale of
1/10.000 or 1/25.000;
d) Map of general assessment of
construction land according to determination of appropriate criteria for
assessment of topography, status quo, hydrogeology; land use (determination of
favorable, less favorable and unfavorable areas for the development of urban
functions...); determination of prohibited and restricted areas for urban
development. Drawings are shown in a topographic map at a scale of 1/25.000 or
1/50.000;
dd) Space development
orientation diagram of the whole city: Determination of boundaries of urban,
rural, functional areas; key development areas; areas of national importance in
politics, culture, history, security, defense (if any); administrative, educational,
health, cultural, sports centers, and other national-level centers.
Determination of spatial axes and urban development corridors of the city.
Drawings are shown in a topographic map at a suitable scale.
e) Technical infrastructure
development orientation diagram of the whole city showing contents specified in
point m of clause 1 of this Article. Drawings are shown in a topographic map at
a suitable scale.
g) Diagram of development
orientations for urban space with population equivalent to that of a Class I
city: urban development structure (including status quo analysis diagrams and
proposed options with description of the criteria for reviewing and selecting
options); determination of framework of main traffic systems; linkages between
main functional areas, central areas, and urban expansion directions;
Determination of the scope and scale of functional areas; repurposed areas;
areas with restricted potentials for development, areas needing embellishment
and renovation, conservation areas; new development areas (determining the
scope and scale of residential areas, functional zones at national, regional
and city levels); conservation areas; no-construction zones; development
reserve zones and security and defense areas. Determination of location and scale
of the systems of administration, trade - services, culture, physical training
and sport centers, green parks and urban open spaces; research, training,
health centers, etc. at national, regional and city levels. Identification of
areas where the underground works are expected to be built. Drawings are shown
in a topographic map at a scale of 1/10.000;
h) Land use orientation diagram
of the whole city: location and scale of urban development, rural development,
functional areas, agricultural production, forestry, defense, and security
areas, and other management-required areas. Drawings are shown in a topographic
map at a scale of 1/25.000 or 50.000;
i) Map of land use for planning
for urban areas with population equivalent to that of a Class I city: Locations
and land use scale of functional areas as regulated in Appendix I attached to;
identification of population scale, quotas of population density and land use
for each urban functional area by development stages. Drawings are shown in a
topographic map at a scale of 1/10.000;
l) Map of orientation for the
development of systems for technical infrastructure of central urban area at a
scale of 1/10.000 or 1/25.000 showing full contents specified in Point m of
clause 1 of this Article;
m) Drawing for urban design:
Showing full contents specified in Point k of clause 1 of this Article at a
suitable scale. Overall perspective drawings and main views simulating suitable
architectural spaces to clarify the research contents.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
1. Description:
a) Reasons, necessity, and
grounds for master planning; arguments, identification of planning scope, scale
and scale of planned area;
b) Analysis of location and assessment
of natural conditions; current population, architecture and landscape, social
infrastructure, technical infrastructure, and environment. c) Assessment of
management and implementation according to the approved planning concerning
space development, land use, and technical infrastructure, comparing with the
orientations and quotas set in the approved planning (if any); assessment of
the status quo of the planned area according to urban standards and criteria.
Assessment of existing ongoing construction and development programs and
projects within the city and relevant programs and projects. Identification of
main problems to be addressed.
c) Determination of objectives,
nature, and development drivers; arguments and determination of socio-economic
and technical quotas for the area reserved for urban development.
d) Assessment and forecast of
the impacts of natural conditions, socio-economic factors; national, regional,
provincial, and technical planning that has been approved for urban development
orientation. Forecast of development quotas: urbanization rate, population,
land, social infrastructure, and technical infrastructure for the urban areas
and functional areas within the area reserved for urban development.
d) Determination of principles
and criteria for selection and selection of urban development structure
options;
e) Space development
orientation: Model and direction of urban development; determination of scope
and scale of functional areas within the planning scope; existing areas with
limited potential for development, areas needing embellishment and renovation,
conservation areas; repurposed areas, new development areas; no-construction
zones; development reserve zones; areas planned for underground construction in
the urban center serving as the provincial political-administrative center;
orientation and principles for development within each functional area; system
of administrative centers, commercial centers, service centers, public centers,
sports facilities, parks, green spaces, and open spaces; urban-level centers;
orientation for rural residential areas.
g) Land use orientation by
stages of the planning; determination of land use scale for functional areas as
prescribed in Appendix I attached to; determination of population and land use
quotas for the planning scope.
h) Urban design: Determination
of areas of architecture and landscape, conservation of natural landscapes and
cultural heritage, main spatial axes, squares, urban gateways, and urban
landmarks within the planning scope. Proposal for organization of space for
systems of centers, urban gateways, main spatial axes, large squares, urban
landmarks; organization of green spaces and water features within the planning
scope.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
k) Proposals of environmental
protection solutions: Establishment of protection and restoration areas
affected by construction investment activities; requirements for waste
management and pollution control during construction investment according to
the planning.
l) Arguments and determination
of priority investment programs and projects for each planning phase, ensuring
feasibility of implementation.
2. Written request for approval
of the urban master planning and draft Decision of competent authority on approval
of such planning.
3. Relevant documents:
a) Decision on approval of
tasks in urban master planning; directives and instructions from competent
authorities regarding master planning formulation;
b) Approval decisions of the relevant
planning; previous approval decision of master planning (if any).
c) Other relevant documents.
4. Drawings:
a) Diagram of location and
regional relationship including: Location, planning scope, scale and boundary
of the planned area; relationships regarding natural, socio-economic, urban
space development, technical infrastructure, and environment under national
planning, regional planning, planning for provinces and centrally affiliated
cities (for urban areas under centrally affiliated cities affecting the
planning scope. Drawings with a suitable scale in the map of orientations for
the development of the national urban system; map of orientations for the
development of urban-rural systems and map of urban-rural system planning
options in the provincial planning or orientations for development of space for
the whole urban area (for urban areas within the centrally affiliated city);
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
c) Map of general assessment of
land according to appropriate criteria for assessment of topography, current
conditions, hydrogeology; legal status and land use; determination of
favorable, less favorable and unfavorable areas for the development of urban
functions; determination of prohibited and restricted areas for urban
development. Drawings are shown in the topographic map at scale 1/10.000 or
1/5.000 (in case the master planning is the basis for detailed planning).
d) Urban development structure
diagrams (including condition analysis diagrams and proposed options with
description of the criteria for reviewing and selecting options). Drawings are
shown in the topographic map at a suitable scale;
dd) Space development
orientation map: Determination of areas with restricted potentials for
development, areas needing embellishment and renovation; new development areas
(determining the scope and scale of residential areas, functional zones at
national, regional and city levels); conservation areas; no-construction zones;
development reserve zones and security and defense areas; areas of
administrative centers, commercial-service centers, cultural centers, sports
centers, parks, green spaces, research centers, training centers, healthcare
centers and other centers at urban level and higher; areas planned for
underground work construction (for urban centers serving as provincial
political-administrative centers); identification of main spatial axes and open
spaces; residential areas. Drawings are shown in the topographic map at scale
1/10.000 or 1/5.000 (in case the master planning is the basis for detailed
planning);
e) Map of land use for planning
by stages: Location and scale of land use functions as prescribed in Appendix I
attached to; Identification of scale of population and land of each functional
area; quotas of population density and urban land by development stages.
Drawings are shown in the topographic map at scale 1/10.000 or 1/5.000 (in case
the master planning is the basis for detailed planning);
g) Maps of orientations for
technical infrastructure system development showing all contents prescribed in
point i of clause 1 of this Article. Drawings are shown in the topographic map
at scale 1/10.000 or 1/5.000 (in case the master planning is the basis for
detailed planning);
h) Urban design drawings
showing full contents required in point h of clause 1 of this Article at
appropriate scale; overall perspectives and main views simulating architectural
spaces to clarify research contents.
Article
12. For communes and special zones not within the urban system
1. Description:
a) Reasons, necessity, and
grounds for commune-level master planning; location, planning scope, and scale
of planned area; development viewpoints and objectives of the region and
province that impact the commune’s development;
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
c) Identification of
development drivers and potentials of the commune; impacts and requirements
from directions and planning for agricultural development, social
infrastructure, and technical infrastructure at national, regional, and
provincial levels related to commune-level master planning;
d) Forecast of development of
economy, population, labor, land demand, and environmental protection; risks
related to fluctuations, natural disasters.
dd) Zoning and requirement for
management of these zones;
e) Space development
orientation: Location, scale and organizational orientation of urban and rural
development areas (if any); functional areas at national, and provincial levels
according to regional planning, provincial planning and sectoral planning;
security and defense areas; agricultural and forestry development areas,
historical-cultural relics, scenic spots and other economic-technical
establishments. Organization of distribution of the systems of administration,
commerce - services, culture, physical training and sports, research, training,
healthcare centers at the provincial level; commune cluster and commune
centers;
g) Contents of Regulation on
architectural management of rural residential points (if any) complying with
laws on architecture.
h) Orientation for developing
commune-level technical infrastructure systems concerning technical
preparation, transport, system of electricity, water supply, energy supply,
drainage and wastewater treatment, waste management, cemetery services and
passive telecommunications infrastructure;
i) Arguments and determination
of priority investment programs and projects for each planning phase, ensuring
feasibility of implementation.
k) Proposed solutions for
implementing the commune-level master planning approval by competent
authorities.
l) Proposals of environmental
protection solutions: Establishment of protection and restoration areas
affected by construction investment activities; requirements for waste
management and pollution control during construction investment according to
the planning.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
3. Relevant documents:
a) Decision on approval of
tasks in commune-level master planning; directives and instructions from
competent authorities regarding commune-level master planning formulation;
b) Approval decisions of the
relevant planning; previous approval decision of commune-level master planning
(if any);
c) Other relevant documents.
4. Drawings:
a) Diagram of location and regional
relationship: Location, boundary of the commune; relationships regarding
natural, socio-economic, and environment under provincial planning affecting
the planning scope. Such contents are shown in the map of urban-rural system
planning options in the provincial planning at a suitable scale;
b) Status quo map: Natural
conditions; status quo of population distribution and land use allocation
within the planning scope; status quo of social and technical infrastructure at
national, regional, and provincial levels as prescribed in the Appendix
attached hereto. Drawings are shown in the topographic map at a scale of
1/10.000 or 1/5.000 (for construction areas);
c) Space development
orientation map: Determination of space for development of urban and rural
residential areas (if any); functional areas at national, and provincial levels
according to regional planning, provincial planning and technical planning;
security and defense areas; areas of development of administration, trade -
services, culture, sports, research, training, healthcare centers from
provincial level and higher; location of commune center, commune cluster (if
any); agricultural and forestry development areas, historical and cultural
monuments, scenic spots and other economic - technical establishments as
prescribed in the Appendix attached to. Drawings are shown in the topographic
map at a scale of 1/10.000 or 1/5.000 (for construction areas);
d) Technical infrastructure
orientation map: Determination of networks, locations, and scale of national,
regional, and provincial technical infrastructure works by sector, including
ground elevation, transport, electricity system, water supply, energy supply,
drainage and wastewater treatment, solid waste management, cemetery services,
and passive telecommunications infrastructure. Drawings that are shown in the
topographic status quo map combined with space development orientation map at
scale 1/10.000 and 1/5.000 (for construction areas).
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
1. Description:
a) Reasons, necessity, and
grounds for master planning for the economic zone; location, planning scope,
and scale of planned area; viewpoints and objectives of the master planning for
the economic zone;
b) Analysis of location and
assessment of natural conditions; status quo of population, labor, and land
use; status quo of architecture and landscape, social infrastructure, technical
infrastructure, and environment; assessment of management and implementation
according to the approved planning regarding space development, land use, and
technical infrastructure; assessment of status quo of ongoing development
investment programs and projects within the economic zone. Identification of
main problems to be addressed;
c) Determination of development
objectives and drivers of the economic zone; determination of economic and
technical quotas for the economic zone; assessment and forecast of impacts of
natural conditions and socio-economic factors; impacts of approved national,
regional, and provincial planning on the development objectives of the economic
zone; forecast of development quotas such as population, labor, land, social
infrastructure, and technical infrastructure of the economic zone;
determination of requirements for establishing urban, rural development areas and
functional areas within the economic zone;
d) Proposal of selection
criteria and selection of space development model and structure for the
economic zone; determination of development principles for urban and rural
residential areas and other functional areas within the economic zone
(industrial, tourism, service, ecological, conservation, etc.); principles for
organizing the public center system of the economic zone;
dd) Orientation for development
of space for the economic zone: Orientation for development of functional
areas, spatial axes, and development corridors as the basis for determining
population density quotas and land use functions; determination of the space
layout and architecture and landscape principles for each functional area of
the economic zone; orientation for organizing system of squares and landmarks;
determination of gateways, key areas, and areas planned for underground
construction (if any) within the economic zone;
e) Orientation for technical
infrastructure system development, including: Main drainage basin divisions,
drainage network including locations and scale of drainage works; determination
of construction elevations for the whole economic zone and each functional
area; determination of external and internal transport networks including
locations and scale of transport headworks; organization of public transport
systems and parking facilities; determination of red line boundaries of main
axes and the system of technical trenches and tunnels (if any); determination
of demand and supply sources for water and energy (electricity, gas); forecast
of total wastewater and solid waste; determination of locations, scale of
headworks and main transmission/distribution networks of water supply, energy,
lighting, passive telecommunication infrastructure, drainage and wastewater
treatment works; determination of locations and scale of solid waste treatment
sites, cemetery services (if any), and other technical infrastructure;
g) Proposals of environmental
protection solutions: Establishment of protection and restoration areas
affected by construction investment activities; requirements for waste
management and pollution control during construction investment according to
the planning.
h) Arguments and determination
of priority investment programs and projects for each planning phase, ensuring
feasibility of implementation.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
3. Relevant documents:
a) Decision on approval of
tasks in master planning for the economic zone; directives and instructions
from competent authorities regarding formulation of the master planning for the
economic zone;
b) Approval decisions of the
relevant planning; previous approval decision of the master planning for the
economic zone (if any).
c) Other relevant documents.
4. Drawings:
a) Diagram of location and
regional relationship: Location, scale and boundary of the planned area;
relationships regarding natural, socio-economic, urban and rural development,
space organization and zoning, infrastructure development, resource use and
environmental protection in regional and provincial planning affecting the
formulation of master planning for the economic zone. Drawings are shown at
suitable scale; based on space organization and zoning maps in the approved
regional and provincial planning;
b) Status quo maps, including:
The status quo of land use of functional areas as prescribed in the Appendix
attached to; architecture and landscape; social infrastructure (education,
healthcare, culture, commerce, green spaces, housing, etc.); technical
infrastructure (transportation, urban electricity supply and lighting,
telecommunications, water supply, ground elevation and rainwater drainage,
wastewater drainage; solid waste management, cemetery services, and
environment). Drawings are shown in the topographic map at a scale of 1/10.000
or 1/5.000 (for construction areas);
c) Map of general assessment
and selection of land according to appropriate criteria for assessment of
topography, current conditions, hydrogeology; assessment of land use;
determination of favorable, less favorable and unfavorable areas for the
development; determination of prohibited and restricted areas for development
in the economic zone (if any). Drawings are shown in the topographic map at a
scale of 1/10.000 or 1/5.000 (for construction areas);
d) Planning structure diagrams
(including status quo analysis diagrams and proposed options with description
of the criteria for reviewing and selecting options); presentation of framework
of main traffic systems; linkages between main functional areas, central areas,
and directions for expanding economic zone. Drawings are shown in the
topographic map at a scale of 1/10.000 or 1/5.000 (for construction areas);
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
e) Map of land use for planning
by stages: Locations and land use scale of functional areas as regulated in the
Appendix attached to; identification of the scale of population (if any), land,
land use quotas for each area in the economic zone by development stages. Drawings
are shown in the topographic map at a scale of 1/10.000 or 1/5.000 (for
construction areas);
g) Maps about control of
architecture and landscape: Determination of architectural and landscape areas in
the economic zone; proposals for organization of space for important axes and
functional areas (centers, gateways, main spatial axes, squares, green spaces,
water surfaces, landmarks, etc.). Drawings are shown on a topographic map at a
suitable scale;
h) Maps of orientations for
technical infrastructure development: Determination of networks, locations, and
scale of national, regional, and provincial technical infrastructure works and
urban areas within the planning scope by sectors including technical preparation,
transport (up to main regional roads), water supply, energy supply, drainage
and wastewater treatment, solid waste management, cemetery services (if any),
passive telecommunications infrastructure, and other technical infrastructure
works. Drawings are shown in the map of land use for planning for the economic
zone by planning phases combined with the topographic map at scale 1/10.000 and
1/5.000 (for construction areas).
Article
14. Regarding national tourism areas
1. Description:
a) Reasons, necessity, and
grounds for master planning for the national tourism area; location, planning
scope, and scale of planned area; viewpoints and objectives of the master
planning for the national tourism area;
b) Analysis of location and
assessment of natural conditions; status quo of population, labor, tourists,
and land use; status quo of architecture and landscape, social infrastructure,
technical infrastructure, and environment; assessment of management and
implementation according to the approved planning regarding space development,
land use, and technical infrastructure; assessment of status quo of ongoing
development investment programs and projects within the national tourism area
or those related; identification of basic problems to be addressed;
c) Determination of development
objectives and drivers of the national tourism area; determination of economic
and technical quotas, demands regarding tourists and services; assessment and
forecast of impacts of natural conditions and socio-economic factors; impacts
of approved national, regional, and provincial planning on the development
objectives of the national tourism area; forecast of development quotas such as
population, labor, tourists, land, social infrastructure, and technical
infrastructure of the entire national tourism area and each functional zone;
d) Proposal, selection of space
development model and structure for the national tourism area; determination of
development principles for urban and rural residential areas and other
functional areas within the national tourism area (if any); organization of the
public center system in the national tourism area;
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
e) Orientation for technical
infrastructure system development, including: Main drainage basin divisions,
drainage network including locations and scale of drainage works; determination
of construction elevations for the whole national tourism area and each
functional area; determination of external and internal transport networks
including locations and scale of transport headworks; organization of public
transport systems and parking facilities; determination of red line boundaries
of main axes and the system of technical trenches and tunnels (if any);
determination of demand and supply sources for water and energy (electricity,
gas); forecast of total wastewater and solid waste; determination of locations,
scale of headworks and main transmission/distribution networks of water supply,
energy, lighting, passive telecommunication infrastructure, drainage and
wastewater treatment works; determination of locations and scale of solid waste
disposal sites, solid waste treatment sites, cemetery services (if any), and
other technical infrastructure works;
g) Proposals of environmental
protection solutions: Establishment of protection and restoration areas
affected by construction investment activities; requirements for waste
management and pollution control during construction investment according to
the planning.
h) Arguments and determination
of priority investment programs and projects for each planning phase, ensuring
feasibility of implementation.
2. Written request for approval
of the master planning for the national tourism area and draft Decision of
competent authority on approval of such planning.
3. Relevant documents:
a) Decision on approval of
tasks in master planning for the national tourism area; directives and
instructions from competent authorities regarding formulation of the master
planning for the national tourism area;
b) Approval decisions of the
relevant planning; previous approval decision of the master planning for the
national tourism area (if any).
c) Other relevant documents.
4. Drawings:
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
b) Status quo maps, including:
The status quo of land use of functional areas as prescribed in the Appendix
attached to; architecture and landscape; social infrastructure (education,
healthcare, culture, commerce, green spaces, housing, etc.); technical
infrastructure (transportation, urban electricity supply and lighting, telecommunications,
water supply, ground elevation and rainwater drainage, wastewater drainage;
solid waste management, cemetery services, and environment). Drawings are shown
in the topographic map at a scale of 1/10.000 or 1/5.000 (for construction
areas);
c) Map of general assessment
and selection of land according to appropriate criteria for assessment of
topography, current conditions, hydrogeology; assessment of land use;
determination of favorable, less favorable and unfavorable areas for the
development; determination of prohibited and restricted areas for development
in the national tourism area (if any). Drawings are shown in the topographic
map at a scale of 1/10.000 or 1/5.000 (for construction areas);
d) Planning structure diagrams
(including status quo analysis diagrams and proposed options with description
of the criteria for reviewing and selecting options); presentation of framework
of main traffic systems; linkages between main functional areas, central areas,
and directions for expanding the national tourism area. Drawings are shown in
the topographic map at a scale of 1/10.000 or 1/5.000 (for construction areas);
dd) Space development
orientation map: Determination of space development structure, functional
areas, key areas, architecture and landscape areas, main spatial axes, system
of squares, gateways, landmarks of the national tourism area; transport and
technical infrastructure linkages between areas; clear presentation of
boundaries and scope of areas subject to control of development such as
conservation areas, areas needing embellishment and renovation, new development
areas, other architecture and landscape areas requiring protection (if any);
identification of areas planned for underground construction (if any). Drawings
are shown in the topographic map at a scale of 1/10.000 or 1/5.000 (for
construction areas);
e) Map of land use for planning
by stages: Locations and land use scale of functional areas in the national
tourism area as regulated in the Appendix attached to; identification of the
scale of population (if any), land, land use quotas for each area by
development stages. Drawings are shown in the topographic map at a scale of
1/10.000 or 1/5.000 (for construction areas);
g) Maps about control of
architecture and landscape: Determination of architectural and landscape areas
in the national tourism area; proposals for organization of space for important
axes and functional areas (centers, gateways, main spatial axes, squares, green
spaces, water surfaces, landmarks, etc.). Drawings are shown on a topographic
map at a suitable scale;
h) Maps of orientations for
technical infrastructure development: Determination of networks, locations, and
scale of national, regional, and provincial technical infrastructure works and
urban areas within the planning scope by sectors including technical
preparation, transport (up to main regional roads), water supply, energy
supply, drainage and wastewater treatment, solid waste management, cemetery
services (if any), passive telecommunications infrastructure, and other
technical infrastructure works. Drawings are shown in the map of land use for
planning for the national tourism area by planning phases combined with the
topographic map at scale 1/10.000 and 1/5.000 (for construction areas).
Section 2.
DOSSIERS ON SUBDIVISION PLANNING FOR URBAN AND RURAL AREAS
Article
15. Regarding urban areas
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
a) Arguments and determination
of planning scope, scale of planned area; analysis and assessment of status quo
of natural environment, population, land use, architecture and landscape,
social infrastructure, technical infrastructure, and environment; assessment of
status quo of ongoing development investment programs and projects within the
planning scope. Identification of main problems to be addressed;
b) Determination of objectives
for the subdivision planning; presentation of key requirements and orientations
in the approved master planning and the management regulations in accordance
with the approved master planning for the planning scope;
c) Selection of quotas of land
use, social infrastructure, and technical infrastructure applied to the entire
area subject to subdivision planning; determination of population scale, land
area, and infrastructure demands for the area subject to subdivision planning.
d) Principles and requirements
for organization of space, architecture, and landscape; regulations on land use
for each functional area, main roads, open spaces, landmarks, centers, and
conservation areas (if any); determination of location, scale, and structure of
residential units; location and scale of social infrastructure works of urban
level or higher (if any); area, population, and land use quotas for each urban
functional area by blocks (formed by district roads for 1/5.000 scale maps or
subdivision-level roads for 1/2.000 scale maps) within the planning scope;
location and scale of underground works; determination of construction lines on
road axes from regional level for 1/5.000 maps or from subdivision level for
1/2.000 maps.
dd) Urban design: Determination
of control quotas regarding setbacks, urban landscape along main roads,
centers; open space areas; landmarks and each urban block within the design
area;
e) Planning for technical
infrastructure system: determination of construction elevations for each urban
block; determination of traffic networks, cross-sections, red line boundaries,
and construction lines; determination and elaboration of the master planning on
locations and scale of parking facilities (overhead, above ground,
underground); metro lines and stations; technical trenches and tunnels;
determination of water demand and supply sources; locations and scale of water
plants, pumping stations; water pipeline networks and technical specifications;
determination of energy demand and supply sources; locations and scale of
distribution substations; medium-voltage power lines and urban lighting
systems; determination of telecommunication network works and demands; total
wastewater and solid waste volumes; drainage networks; locations and scale of
wastewater treatment and solid waste processing works;
g) Proposals of environmental
protection solutions:
h) Arguments and determination
of priority investment programs and projects in the area subject to subdivision
planning; proposals and recommendations on mechanisms to mobilize and generate
resources for implementation; Determination of important and planned projects
prioritized for state-funded investment.
2. Written request for approval
of the subdivision planning and draft Decision of competent authority on
approval of such planning.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
a) Decision on approval of
tasks in subdivision planning; directives and instructions from competent
authorities regarding formulation of the subdivision planning;
b) Approval decisions of the
relevant planning; previous approval decision of subdivision planning (if any).
c) Other relevant documents.
4. Drawings:
a) Diagram of location and
boundary of the land: location, planning scope, planning boundary scale;
showing relationships between the sub-zone and other urban areas. Drawings are
shown in the space development orientation map and map of land use for planning
for urban areas at appropriate scale;
b) Map of status quo of land
use and architecture and landscape: The status quo of land use of functional
areas as prescribed in Appendix V hereof; land use quotas; status quo of
architecture and landscape; social infrastructure (education, healthcare,
culture, commerce, green spaces, housing, etc.); protected areas of monuments,
heritage, and scenic spots. Drawings are shown in the topographic map at a
scale of 1/2.000 or 1/5.000;
c) Map of the status quo of the
system of technical infrastructure and environmental protection: Transport,
electricity supply and urban lighting, telecommunications, water supply, ground
elevation and rainwater drainage, wastewater drainage; solid waste management,
cemetery services, environment; other technical infrastructure works. Drawings
are shown in the topographic map at a scale of 1/2.000 or 1/5.000;
d) Overall land use planning
map: Determination of area, population size and quotas of land use for planning
for each block in the planned area according to regulations in Appendix V
hereof; work setback for the road axes in the planned area; location and scale
of underground works; determination of residential units and housing clusters;
determination of location and scale of social infrastructure system at urban or
provincial level (if any) and unit level in the planning scope. Drawings are
shown in the topographic map at a scale of 1/2.000 or 1/5.000;
dd) Diagram of organization of
space, architecture and landscape showing spatial structure by residential
units, housing clusters, and public service centers at residential, urban, and
provincial levels (if any). Drawings are shown in the topographic map at a
scale of 1/2.000 or 1/5.000;
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
g) Map of planning for
technical infrastructure system by each sector: Technical preparation, water
supply, energy supply and lighting, wastewater drainage and solid waste treatment,
passive telecommunications infrastructure and other technical infrastructure
works. Drawings are shown in the overall land use-planning map in combination
with topographic map at a scale of 1/2.000 or 1/5.000;
h) General map of technical
pipelines and lines. Drawings are shown in the overall land use-planning map in
combination with topographic map at a scale of 1/2.000 or 1/5.000;
i) Drawing of identification of
underground work construction areas: Public underground works, high-rise
buildings with basements (if any). The drawings are shown in overall land use
planning map, general map of technical pipelines and lines in combination with
topographic map;
k) Urban designs: showing all
contents prescribed in point dd of clause 1 of this Article.
Article
16. For industrial parks, hi-tech parks, hi-tech application agricultural
parks, hi-tech application forestry parks
1. Description:
a) Arguments and determination
of planning scope, scale of planned area; analysis and assessment of status quo
of natural condition, population, labor (if any) and land use functions in
accordance with Appendix attached hereto; status quo architecture and
landscape, social infrastructure, technical infrastructure, and environment;
assessment of status quo of ongoing development investment programs and
projects (if any). Identification of main problems to be addressed;
b) Determination of objectives
for the subdivision planning; presentation of key requirements and orientations
in the approved provincial planning or master planning for area subject to
subdivision planning;
c) Selection of quotas of land
use, technical infrastructure applied in formulating the subdivision planning;
labor scale and land use demands, and demands for technical infrastructure and
services for the area subject to subdivision planning;
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
dd) Determination of principles
and proposals for space organization and architecture and landscape within each
block and main roads; determination of open spaces, public spaces, landmarks,
conservation areas, etc. within the area subject to subdivision planning;
e) Planning for technical
infrastructure system: determination of construction elevations for each block;
determination of traffic networks, cross-sections, red line boundaries, and
building lines; determination and elaboration of locations and scale of parking
facilities (overhead, above ground, underground); public transport routes;
technical trenches and tunnels (if any); determination of water demand and
supply sources; locations and scale of water plants, pumping stations; water
pipeline networks and technical specifications; determination of energy demand
and supply sources (electricity, gas); locations and scale of distribution
substations and gas stations; medium-voltage power lines and urban lighting
systems; determination of telecommunication network works and demands; total
wastewater and solid waste volumes; drainage networks; locations and scale of
wastewater treatment and solid waste processing works;
g) Proposals of environmental
protection solutions:
h) Argument and determination
of priority investment programs and projects; proposals and recommendations on
mechanisms to mobilize and generate resources for implementation;
2. Written request for approval
of the subdivision planning and draft Decision of competent authority on
approval of such planning.
3. Relevant documents:
a) Decision on approval of
tasks in subdivision planning; directives and instructions from competent
authorities regarding formulation of the subdivision planning;
b) Approval decisions of the
relevant planning; previous approval decision of subdivision planning (if any).
c) Other relevant documents.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
a) Diagram of location and
scope of planning: Shown at appropriate scale in the map of planning options of
land use in the province or space development orientation map of the approved
master planning;
b) Map of status quo of land
use and architecture and landscape: The status quo of land use as prescribed in
the Appendix attached hereto; architecture and landscape; social infrastructure
(services, public green spaces, worker housing, etc.); protected areas of
monuments, heritage, scenic spots, and other functions in the area. Drawings
are shown in the topographic map at a scale of 1/2.000;
c) Maps of status quo of
systems of technical infrastructure for transport, electricity supply and
lighting, telecommunications, water supply, ground elevation and rainwater
drainage, wastewater drainage; solid waste management, cemetery services,
environment; other technical infrastructure works. Drawings are shown in the
topographic map at a scale of 1/2.000;
d) Overall land use planning
map: Determination of functions, scale and area, population, labor, and quotas
of land use for planning in each block established by subdivision-level roads
in the area subject to subdivision planning; location and scale of underground
works (if any). Drawings are shown in the topographic map at a scale of
1/2.000;
dd) Diagram of organization of
space and architecture and landscape that is shown in the topographic map at
the scale of 1/2.000;
e) Maps of determination of
underground work construction areas: Public underground works, high-rise
buildings with basements (if any). Drawings are shown in the overall land
use-planning map in combination with topographic map at a suitable scale;
g) Map of planning for traffic,
red line boundaries and construction lines, work setbacks for roads of
subdivision level or above. Drawings are shown in the overall land use-planning
map in combination with topographic map at a scale of 1/2.000;
h) Planning maps of other
technical infrastructure systems: Technical preparation, water supply, energy
supply and lighting, wastewater drainage and solid waste treatment, cemetery
services and other technical infrastructure works. Drawings are shown in the
overall land use-planning map in combination with topographic map at a scale of
1/2.000;
i) General map of technical
pipelines and lines. Drawings are shown in the overall land use-planning map in
combination with topographic map at a scale of 1/2.000;
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Article
17. Regarding focal areas of technical infrastructures
1. Description:
a) Determination of the scope
and scale of the subdivision planning. Analysis of location and assessment of
natural conditions; status quo of labor (if any) and land use; status quo of
architecture and landscape. Identification of main problems to be addressed;
b) Determination of the
objective of the subdivision planning. Key requirements and orientations from
the provincial planning or master planning for the area subject to subdivision
planning;
c) Determination of technical
and technological standards applied as a basis for subdivision planning;
forecast of labor scale, land use demand, and demands for infrastructure
connectivity and services within the area subject to subdivision planning;
d) Location and scale of main
items; location of auxiliary works; internal traffic routes, entrances and
exits; determination of location and scale of underground works (if any);
determination of planned expansion areas.
dd) Planning for technical
infrastructure system: Determination of construction elevations for each area;
system of electricity supply; water supply and drainage systems including
rainwater and wastewater; telecommunication, internal energy supply, and
lighting systems.
e) Proposals of environmental
protection solutions:
g) Argument and determination
of priority investment programs and projects; proposals and recommendations on
mechanisms to mobilize and generate resources for implementation.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
3. Relevant documents:
a) Decision on approval of
tasks in subdivision planning of the competent authority;
b) Approval decisions of the
relevant planning; previous approval decision of subdivision planning (if any).
c) Directives and instructions
from competent authorities on organizing the subdivision planning formulation.
d) Other relevant documents.
4. Drawings:
a) Diagram of location and
planning scope: Shown at appropriate scale in the map of planning options of
land use in the province or space development orientation map of the approved
master planning;
b) Map of status quo of land
use: Status quo of land use as prescribed. Drawings are shown in the
topographic map at a scale of 1/2.000;
c) Maps of status quo of
systems of technical infrastructure for transport, electricity supply and
lighting, telecommunications, water supply, ground elevation and rainwater
drainage, wastewater drainage, solid waste management, and environment.
Drawings are shown in the topographic map at a scale of 1/2.000;
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
dd) Diagram of organization of
space and architecture and landscape that is shown in the topographic map at
the scale of 1/2.000;
e) Map of planning for traffic
showing red line boundaries and construction lines for roads of subdivision
level or above and planning maps of other technical infrastructure systems:
Technical preparation, water supply, energy supply and lighting, wastewater
drainage and solid waste treatment, cemetery services and other technical
infrastructure works. Drawings are shown in the overall land use-planning map
in combination with topographic map at a scale of 1/2.000;
g) General map of technical
pipelines and lines. Drawings are shown in the overall land use-planning map in
combination with topographic map at a scale of 1/2.000;
h) Drawings of orientation,
regulations on control of architecture and landscape in the area subject to
subdivision planning at a suitable scale.
Article
18. For other functional areas reserved for regional or provincial planning
Based on the nature, functions,
orientations in the regional or provincial or master planning, and management
and development requirements, prepare subdivision planning ensuring content
closely aligns with the main provisions specified in this section.
Section 3.
DOSSIERS ON DETAILED PLANNING FOR URBAN AND RURAL AREAS
Article
19.
1. Description:
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
b) Determination of objectives
for the planning; assessment the conformity with the issued urban development
programs and plans; presentation of key requirements and orientations in the
approved master planning and the main options and solutions in the approved
subdivision planning (if any), along with the issued management regulations
related to the planning scope;
c) Selection of quotas of land,
social infrastructure, and technical infrastructure applied to the entire area
subject to planning; determination of population scale, land, and technical and
social infrastructure demands for the planning scope;
d) Determination of land use
functions, scale and area, population, land use quotas of each block in the
planning scope; work construction lines for each plot of land and on internal
roads and above; determination of social housing construction areas (if any);
dd) Determination of the
requirements for organizing space and architecture and landscape for the entire
planned area and requirements for the arrangement of works for each land plot (including
height, floor level and ceiling height of the first floor; architectural style,
fences, colors, main materials of works and other architectural objects);
organization of public green spaces, gardens, street trees, and water features
within the planning scope; determination of the location, scale of works,
specific areas subject to control, and regulatory content to control
implementation according to the planning;
e) Urban design: Determination
of landmarks within the planning scope according to sight directions, building
heights for each land plot and the entire area; setbacks of buildings on each
street and intersection; identification of the mass, color, and main
architectural styles of buildings; the system of green spaces, water surfaces,
and squares;
g) Determination of areas for
underground works (public underground works, high-rise buildings planned to
have public-function basements, etc.);
h) Planning for technical
infrastructure system: Determination of construction elevations for each land
plot; determination of traffic networks (including pedestrian paths if any),
cross-sections, red line boundaries, and construction lines; determination and
elaboration of the master planning, subdivision planning (if any) on locations
and scales of parking facilities (overhead, above ground, underground);
determination of water demand and supply sources; locations and scales of water
plants, pumping stations; water pipeline networks and technical specifications;
determination of energy demand and supply sources; locations and scales of
distribution substations; medium/low-voltage power lines and urban lighting
systems; determination of telecommunication network demand; total wastewater
and solid waste volumes; drainage networks; locations and scales of wastewater
treatment and solid waste processing works;
i) Proposals of environmental
protection solutions;
k) Proposals of solutions
regarding funding and implementation organization.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
3. Relevant documents:
a) Decision on approval of
tasks in detailed planning; directives and instructions from competent
authorities regarding detailed planning formulation;
b) Approval decisions of the
relevant planning; previous approval decision of detailed planning (if any).
c) Other relevant documents.
4. Drawings:
a) Diagram of location and
boundaries of the land: Location and boundaries of the planned area within the
approved master planning and subdivision planning (if any); relationship
between the planned area and other blocks or functional areas in the
subdivision planning (if any). Drawings are shown at appropriate scale in the
space development orientation map of the approved master planning; in the land
use planning map of the approved subdivision planning for urban areas;
b) Map of status quo of land
use and architecture and landscape and assessment of construction land: The
status quo of land use of functional areas as prescribed in Appendix VI
attached hereto; architecture and landscape; social infrastructure (education,
healthcare, culture, commerce, green spaces, housing, etc.); land assessment
based on criteria such as topography, current conditions, hydrogeology, land
use. Drawings are shown in the topographic map at a scale of 1/500;
c) Map of the status quo of the
system of technical infrastructure works and environmental protection:
Transport, energy supply and urban lighting, telecommunications, water supply,
ground elevation and rainwater drainage, wastewater drainage; solid waste
management, cemetery services, environmental protection. Drawings are shown in
the topographic map at a scale of 1/500;
d) Overall land use planning
map: Determination of scale and area, population and quotas of land use for
planning for each land plot (formed by internal roads) in the planning scope
according to regulations in Appendix V attached hereto; work setback for the
road axes at internal level or higher; location and scale of underground works;
determination of residential units, housing clusters, or residential areas;
areas for social housing construction (if any); determination of location and
scale of social infrastructure system at urban level or higher and level of
residential unit/housing cluster (if any) in the planning scope. Drawings are
shown in the topographic map at a scale of 1/500;
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
e) Map of planning for traffic
work system, red line boundaries and construction lines; location and size of
parking facilities (overhead, above ground and underground) and protection
corridors technical infrastructure routes up to internal roads. Drawings are
shown in the diagram of organization of space and architecture and landscape in
combination with the topographic map at the scale of 1/500;
g) Map of planning for
technical infrastructure system by each sector: Technical preparation, energy
supply and lighting, wastewater drainage and solid waste management, passive
telecommunications infrastructure and other technical infrastructure works.
Drawings are shown in the diagram of organization of space and architecture and
landscape in combination with the topographic map at the scale of 1/500;
h) General map of technical
pipelines and lines is shown in the diagram of organization of space and
architecture and landscape in combination with the topographic map at the scale
of 1/500;
i) Drawing of identification of
underground work construction areas: Public underground works, high-rise
buildings with basements (if any). Drawings are shown in the diagram of
organization of space and architecture and landscape in combination with the
topographic map at a suitable scale;
k) Urban designs: showing all
contents prescribed in point e of clause 1 of this Article.
Article
20. Regarding separate urban designs
1. Description:
a) Arguments and determination
of planning scope, scale and area of the separate urban design, scale and area
of planned area; analysis and assessment of status quo of natural condition,
population, land use, architecture and landscape, and technical infrastructure;
presentation of status quo of ongoing development investment projects.
Identification of main problems to be addressed;
b) Determination of
construction density, number of stories, and setback for each block; control of
the maximum and minimum building heights for blocks or lots; proposal of
content and design solutions for setbacks that do not disrupt the traditional
structure of the area, ensuring utility of the work and harmonization with the
overall landscape; elaboration of limits on the height of the first floor (or
ground floor) and below, dimensions and elevation of balconies, loggias, and
roofs;
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
d) For system of green spaces
and landscape: Design solutions combining green spaces with water features and
natural landscape of the area. Selection of local tree species with appropriate
size and color that fit design solutions;
dd) Conservation solutions,
protection zoning of historical and cultural monuments in accordance with the
Heritage Law; regulations on construction and management of surrounding works;
e) Regarding technical
infrastructure design content: Traffic design must specify road cross-sections,
sidewalks, traffic signs; preliminary design of form, color, materials, and
designated means of transport for internal traffic routes; propose preliminary
designs for synchronized infrastructure equipment systems, street amenities,
and urban lighting.
2. Written request for approval
of the separate urban design and draft Decision of competent authority on
approval of such design.
3. Relevant documents:
a) Decision on approval of
tasks related to separate urban design; directives and instructions from
competent authorities regarding formulation of planning for separate urban
design;
b) Approval decisions of master
planning, subdivision planning (if any);
c) Other relevant documents.
4. Drawing for separate urban
design:
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
b) Drawings of status quo of
the site (with analysis and assessment) at a scale of 1/500 to 1/200 in the
topographic maps of corresponding scales;
c) Detailed drawings (overall
site plan, elevations, illustrative perspectives) at a scale of 1/500 to 1/200.
If clarification of architecture of some typical, characteristic, or landmarks
in specific areas is needed, drawing scales shall be from 1/200 to 1/100;
d) Drawings specifying
technical infrastructure (road elevation cross-sections, roadbed elevation,
sidewalk elevation, street equipment, and other amenities in the urban area) at
a scale of 1/500;
3. Model (if any): Physical
model made at a scale of 1/500, with materials suitable for the urban design
concept. If it is necessary to clarify areas with works, landmarks, or key
ideas of the project, the model shall be made at a scale of 1/200.
Article
21. Regarding overall land use planning
1. Description:
Arguments and analysis of the
location, planning scope, scale and area for overall land use planning;
assessment of natural condition, status quo, and the relationship of the land
plot with the overall architecture and landscape, technical infrastructure, and
environment;
b) Key requirements and
orientations from the subdivision planning or master planning for the area
subject to overall land use planning;
c) Plans for organization of
space and architecture and landscape; land use allocation for works;
determination of land use functions, scale and area, population, land use
quotas of each land plot for construction; planning scheme for the technical
infrastructure system within the planning scope;
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2. Relevant documents attached:
a) Approval decisions of the
subdivision planning or approval decisions of master planning in cases where no
subdivision planning is required;
b) Other relevant documents.
3. Drawings:
a) Diagram of location and
boundaries of the land within the approved subdivision planning and master
planning (in cases where no subdivision planning is required), which is shown
in the overall land use planning map of the subdivision planning or land use
planning map by stages of the master planning approved at a suitable scale. For
technical infrastructure works not along linear routes, diagram of location and
boundaries of the planned area shall be shown in the land use planning map by
stages of the master planning or in the provincial-level land use planning map
in the provincial planning dossier or in the planning option map of the
approved technical planning at a suitable scale;
b) Overall drawing,
architectural plan of the works: Determination of location, scale of works,
work items in the land plot (including underground works, underground parts
with public functions); quotas of land use for planning; organization of
gardens and internal roads in the planned area. The drawings are shown in a
topographic map at the scale of 1/500;
c) Map of the system of
technical infrastructure works (transport, technical preparation) that is shown
in the topographic map at the scale of 1/500.
Section 4.
UNDERGROUND SPACE PLANNING DOSSIERS AND TECHNICAL INFRASTRUCTURE PLANNING
DOSSIERS FOR CENTRALLY AFFILIATED CITIES
Article
22. Regarding underground space planning
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
a) Reasons, necessity and
grounds for underground space planning;
b) Assessment of status quo of
construction, natural conditions, geology, and hydrology;
c) Analysis of development orientation
for underground space according to the master planning and forecast of the
demand and potential for underground space use in the entire city by each
planning phase; determination of economic, technical quotas, and land bank for
investment and construction;
d) Determination of demand for
underground space development; zoning for underground space development
suitable to geological characteristics, investment efficiency, and land
management;
dd) Determination of the system
of underground works in the urban area (public facilities, transport, water
supply, electricity supply, drainage, etc.), including routes, locations, and
land use scale of works;
e) Determination of investment
programs and projects; estimated capital sources and implementation plan;
g) Contents regarding
environmental protection: Establishment of protection and restoration areas
affected by investment in construction of underground works; requirements for
waste management and pollution control during construction investment and operation
and use of underground space and works.
2. Written request for approval
of underground space planning and draft Decision of competent authority on
approval of such planning.
3. Relevant documents:
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
b) Approval decisions of the
relevant planning; approval decisions of master planning, subdivision planning,
detailed planning (if any).
c) Directives and instructions
from competent authorities on organizing the underground space planning
formulation.
d) Other relevant documents.
4. Drawings:
a) Diagram of location, scope,
and map of the area subject to underground space planning based on approved
regional planning, provincial planning, and master planning at a suitable
scale;
b) Map of status quo of
topography, land use at the scale of 1/10.000 - 1/25.000:
c) Summary map of space
development orientation and land use at a scale of 1/10.000 - 1/25.000;
d) Underground space planning
map at the scale of 1/10.000 – 1/25.000, attached to diagrams at suitable
scales (if any); map of area subject to underground space planning at the scale
of 1/5.000 (if any);
dd) Environmental protection
diagram at a suitable scale.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
1. Description:
a) Reasons, necessity and
grounds for traffic planning;
b) Assessment of the status quo
of construction and development of urban traffic infrastructure, including
external traffic and urban traffic; public passenger transport;
c) Forecast of transport demand
and determination of economic, technical quotas, and land bank allocated for
traffic;
d) Determination of the
external transport networks (road, railway, waterway, airway) including
specifics of routes; location and scale of headworks: airports, seaports, river
ports, traffic junctions, and external parking lots;
dd) Determination of the urban
traffic system, including classification and organization of the urban road
network; specification of urban rail routes (above ground, overhead,
underground), locations and scales of facilities: stations, urban parking lots,
traffic hubs; determination of red line boundaries and construction lines for
main urban streets;
e) Determination of the public
passenger transport network;
g) Determination of investment programs
and projects; preliminary total investment, funding sources, and implementation
plans;
h) Contents regarding
environmental protection: Establishment of protection and restoration areas
affected by investment in construction of underground works; requirements for
waste management and pollution control during construction investment and
operation and use of system of traffic works.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
3. Relevant documents:
a) Decision on approval of
tasks in traffic planning of the competent authority;
b) Approval decisions of the
relevant planning; approval decisions of master planning, subdivision planning,
detailed planning (if any).
c) Directives and instructions
from competent authorities on organizing the traffic planning formulation.
d) Other relevant documents.
4. Drawings:
a) Location diagram, map of the
area subject to traffic planning based on the approved master planning at a
suitable scale;
b) Map of status quo of
topography, land use at the scale of 1/10.000 - 1/25.000:
c) Summary map of space
development orientation and land use at a scale of 1/10.000 - 1/25.000;
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
dd) Environmental protection
diagram at a suitable scale.
Article
24. Regarding water supply planning
1. Description:
a) Reasons, necessity and
grounds for water supply planning;
b) Assessment of the status quo
of water supply system: sources of extraction, capacity, extraction efficiency,
quality of clean water, water pressure, connection rate, loss and revenue
leakage rates, and evaluation of the operational status of water supply
facilities and pipeline networks;
b) Detailed assessment of
reserves and quality of surface water and groundwater sources, and their
extraction capacity for water supply;
c) Determination of water
supply quotas for various uses, forecast of water demand;
d) Specific selection of water
supply sources, determination of demand; zoning of water supply areas and
determination of land use requirements for water supply facilities;
dd) Determination of location
and capacity of water plants, transmission and distribution networks;
orientation for connection between water plants, water supply areas, and
service areas; land use demand for water supply facilities; balancing water
sources according to water supply schemes at each planning stage;
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
g) Proposals of regulations on
water source protection and water supply system protection;
h) Contents regarding
environmental protection:
2. Written request for approval
of the water supply planning and draft Decision of competent authority on
approval of such planning.
3. Relevant documents:
a) Decision on approval of
tasks in water supply planning of the competent authority;
b) Approval decisions of the
relevant planning; approval decisions of master planning, subdivision planning,
detailed planning (if any).
c) Directives and instructions
from competent authorities on organizing the formulation of water supply
planning;
d) Other relevant documents.
4. Drawings:
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
b) Map of status quo of water
supply system, Map of status quo of topography at the scale of 1/10.000 -
1/25.000;
c) Summary map of space
development orientation and land use at a scale of 1/10.000 - 1/25.000;
d) Water supply planning map at
a scale of 1/10.000 - 1/25.000;
dd) Environmental protection
diagram at a suitable scale.
Article
25. Regarding planning for ground elevation and drainage
1. Description:
a) Reasons, necessity and grounds
for planning for ground elevation and drainage;
b) Assessment of status quo of
topography, engineering-geological conditions, hydrology, areas with
environmental hazards (subsidence, collapse, geological instability, erosion,
etc.);
c) General assessment of urban
construction land for each urban area, including identification of favorable,
unfavorable, restricted, and prohibited construction areas;
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
dd) Determination of
orientation contents in the master planning, basic quotas and parameters,
drainage basins; drainage network and surface water receiving sources; location
and scale of main drainage works; determination of wastewater drainage network;
location and scale of wastewater treatment works; natural disaster management solutions.
e) Determination of controlled
construction elevation for specific urban areas and main urban streets;
g) Preliminary estimation of
excavation and embankment volumes for the areas;
h) Determination of priority
investment programs and projects; estimated capital sources and implementation
plan;
i) Contents regarding
environmental protection: Establishment of protection and restoration areas
affected by investment in construction of underground works; requirements for
waste management and pollution control during construction investment according
to the planning for ground elevation and drainage.
2. Written request for approval
of the planning for ground elevation and drainage and draft Decision of
competent authority on approval of such planning.
3. Relevant documents:
a) Decision on approval of
tasks in planning for ground elevation and drainage of the competent authority;
b) Approval decisions of the
relevant planning; approval decisions of master planning, subdivision planning,
detailed planning (if any).
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
d) Other relevant documents.
4. Drawings:
a) Location diagram, map of the
area subject to planning for ground elevation and drainage based on the
approved master planning at a suitable scale;
b) Maps of status quo of ground
elevation and drainage, map of status quo of topography, land use at the scale
of 1/10.000 - 1/25.000;
c) Summary map of space development
orientation and land use at a scale of 1/10.000 - 1/25.000;
d) Map of planning for ground
elevation and drainage at a scale of 1/10.000 - 1/25.000;
dd) Environmental protection
diagram at a suitable scale.
Article
26. Regarding planning for solid waste management and cemetery services
1. Description:
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
b) Assessment of the status quo
of waste sources, composition, characteristics, and volume of various types of
solid waste; assessment of source segregation capacity and the potential for
recycling and reuse of solid waste;
c) Assessment of the status quo
of cemeteries including their distribution, scale, operation, and use (active,
planned closure, relocation, renovation, etc.); cremation facilities and their
environmental impacts; assessment of the status quo of funeral sites and
facilities;
d) Determination of quotas,
forecast of waste sources and total generated solid waste; forecast of burial
demand and land use requirements for solid waste management and cemetery
services;
dd) Determination of locations
and scale of collection points, transfer stations, solid waste treatment sites;
crematoriums and funeral homes;
e) Proposal of appropriate
treatment technologies;
g) Development of priority
investment programs and projects; estimation of funding sources and
implementation plans;
h) Contents regarding
environmental protection: Establishment of protection and restoration areas
affected by investment in construction of underground works; requirements for
waste management and pollution control during construction and use according to
the planning for solid waste management and cemetery services.
2. Written request for approval
of the planning for solid waste management and cemetery services and draft
Decision of competent authority on approval of such planning.
3. Relevant documents:
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
b) Approval decisions of the
relevant planning; approval decisions of master planning, subdivision planning,
detailed planning (if any).
c) Directives and instructions
from competent authorities on organizing the formulation of planning for solid waste
management and cemetery services.
d) Other relevant documents.
4. Drawings:
a) Location diagram, map of the
area subject to solid waste management and cemetery services based on the
approved master planning at a suitable scale;
b) Map of status quo of
topography, land use at the scale of 1/10.000 - 1/25.000:
c) Summary map of space
development orientation and land use at a scale of 1/10.000 - 1/25.000;
d) Map of planning for Solid
waste management and cemetery services at a scale of 1/10.000 - 1/25.000;
dd) Environmental protection
diagram at a suitable scale.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Article
27. Contents of dossiers on review of urban and rural planning
1. Review of urban and rural planning
to control and assess the implementation according to the approved planning,
serving as one of the bases for making decisions on adjustments to planning.
2. Content of the urban and
rural planning review report includes:
a) Review of preparation and
implementation of relevant planning, investment projects according to the
approved urban and rural planning, and implementation plans of the master
planning;
b) Assessment of achieved
objectives, impacts, and effectiveness of implementation according to the
approved planning;
c) Analysis of new factors
arising during the implementation of urban and rural planning and
socio-economic development in the planned area;
d) Recommendations and
proposals;
dd) The dossier on review of
urban and rural planning, including: the written report, color drawings at
suitable scales, and relevant legal documents.
Article
28. Components and contents of dossiers on adjustment to urban and rural
planning
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
The components and contents of
the planning task dossier and the General adjustment scheme dossier shall
comply with the regulations in Chapters II and III hereof.
2. For local adjustment to
urban and rural planning, the components and contents of the dossier include:
a) Report from the planning
organization submitted to the competent authority approving the urban and rural
planning, clearly stating: The reasons and necessity for the local adjustment
of urban and rural planning; assessment of the status quo of the area to be
adjusted; contents of the local adjustment; analysis and clarification of the
continuity and consistency of the entire urban and rural planning and the
socio-economic effectiveness of the local adjustment; determination of economic
- technical quotas achieved after the local adjustment, compared with the
quotas approved before the adjustment proposal; assessment of the impact of the
local adjustment on the implementation of the approved planning; proposed
measures to address new issues arising from the local adjustment; Roadmap and
progression of implementation according to the local adjustment after approval
by the competent authority. The report must have relevant legal documents and
materials attached.
b) Drawings presenting:
Location, boundaries, and scale of the area subject to local adjustment;
contents of the local adjustment; determination of economic - technical quotas
achieved after adjustment, compared with previously approved quotas;
c) Related legal documents;
summary report, explanations, and responses to feedback from agencies,
organizations, individuals, and the community regarding the local adjustment to
urban and rural planning.
d) Draft Decision of the
competent authority approving the local adjustment to urban and rural planning.
Chapter IV
MARKING DOSSIERS,
MARKING AND MARKER MANAGEMENT IN ACCORDANCE WITH URBAN AND RURAL PLANNING
Section 1.
PREPARATION OF MARKING DOSSIERS
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
1. The marking dossier must be
prepared and approved within 30 days from the date the urban and rural planning
is approved in order to implement marking in the field or apply information
technology.
2. Responsibility for
preparation and authority for approval of the marking dossier shall comply with
Clause 2 and Clause 3 of Article 52 of the Law on Urban and Rural Planning. For
planning required approval from the Prime Minister, the provincial People's
Committees shall approve the marking dossiers.
3. The planning appraisal
agency shall appraise and submit the marking dossier for approval. The contents
of the appraisal include:
a) Conformity with the approved
urban and rural planning dossier and management requirements;
b) Types and number of markers;
technical specifications of the markers in accordance with Section 2 of this
Chapter;
c) Estimated cost for marking.
4. Application of information
technology in marking:
a) For master planning, no
on-site marking is carried out; only the marking dossier is prepared and
approved, and boundary markers are managed via an suitable application aligned
with the preparation, appraisal, approval, and management of urban and rural
planning;
b) For no construction areas,
conservation areas of historical and cultural monuments, and other protected areas
where boundaries have been marked according to specialized regulations,
preparation, appraisal, and approval of marking dossiers are not required.
However, information about the installed markers must be transferred, updated,
and managed via an application suitable for the preparation, appraisal,
approval, and management of urban and rural planning;
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
5. Based on management
requirements and the local urban and rural planning database system, the
People's Committees at all levels shall decide the map scale for marking
dossier preparation within their approval authority in accordance with Articles
34, 35, and 36 hereof.
Article
30. Dossiers on marking in accordance with urban and rural planning
1. Components of the dossiers
on marking in accordance with urban and rural planning include: description,
drawings, cost estimate for marking, relevant legal documents and juridical
person dossiers of the surveying and mapping unit selected to prepare the
dossier and carry out the marking; Written request and draft decision approving
the marking dossier.
2. Description of the marking
dossier:
a) Grounds for preparing the
marking dossier; status quo of the marked area;
b) The contents of the marking
include: types of markers to be installed; number of markers to be installed;
marker positioning plan; distance between markers; reference markers (if any);
c) Organization and plan for marking.
3. Drawings of the marking
dossier:
a) Location diagram and marking
boundary extracted from the approved urban and rural planning at a suitable
scale.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
4. Requirements for the marking
dossier and mapping regulations serving the preparation of the dossiers on
marking according to urban and rural planning:
a) The marking dossier must be
prepared on a digital topographic map confirmed by the competent authority; it
must comply and be consistent with the approved urban and rural planning;
b) The surveyed boundary for
preparing the marking dossier depends on management requirements and the
topography of the marked area; the maps in the marking dossier must be prepared
on a map at a suitable scale.
Article
31. Funding for the preparation of dossiers on marking in accordance with urban
and rural planning and on-site marking
1. Funding from the state
budget shall be used for preparing marking dossiers and on-site marking, adding
and restoring markers for master planning, subdivision planning, and detailed
planning that are not part of commercial construction investment projects.
2. Funding from organizations
and individuals shall be used for preparing marking dossiers and on-site
marking within project areas for planning that belong to commercial
construction investment projects.
3. The cost estimate for the
preparation and implementation of marking shall follow the guidelines on
methods for estimation of construction survey cost as specified Circulars of
the Ministry of Construction on guidance on certain contents on cost
determination and management of construction investment
Section 2.
MARKING
Article
32. Type of markers
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
a) Road centerline marker:
Marker determining the coordinates and elevation of intersection points and
turning points of the road centerline; denoted as "TĐ";
b) Red line boundary marker:
Marker defining the boundary line separating the land plot for construction
from the land reserved for traffic roads or technical infrastructure works;
denoted as "CGĐ";
c) Boundary marker of no
construction area: Marker defining the boundary of no construction areas,
conservation areas of historical and cultural monuments, and other protected
areas; denoted as "RG";
d) Reference marker: Marker
used to replace a marker that cannot be installed in the field due to
unfavorable conditions or when installation would affect existing works;
denoted as "MTC".
2. On-site markers shall ensure
a minimum distance of 30 meters between markers, depending on the topography
and geomorphology of the marked area, and must meet management requirements
regarding boundaries and elevation. If the distance between markers is less
than 30 meters, a description and explanation must be included in the marking
dossier.
Article
33. Regulations on markers
1. A marker consists of the buried
foundation, the base, and the shaft, made of reinforced concrete to ensure
durability and easy identification.
2. The base of the marker has
the measure of 40x40x50 cm; the shaft is 90 cm in length. The cross-sectional
shapes of different types of marker shafts are specified as follows:
a) Road centerline marker shaft
has a circular cross-section with a diameter of 15 cm;
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
c) Boundary marker shaft for
restricted areas has an equilateral triangular cross-section with 15 cm sides;
d) Reference marker shaft has
the same cross-section as the marker it replaces; the reference marker displays
full information for referencing the marker it substitutes.
3. The top surface of the marker
is fitted with a porcelain or iron core, engraved with the marker’s symbol and
identification number.
Article
34. Marking in accordance with master planning for urban and rural areas
applying information technology
1. For centrally affiliated
cities, markers include:
a) Road centerline markers for
main urban streets planned for new construction or renovation within the city;
b) Red line boundary markers
for main urban streets planned for new construction or renovation within the
city;
c) Markers defining boundaries
of no construction areas; conservation areas of historical and cultural
monuments; and other protected areas.
2. For area reserved for urban
development and functional areas, the on-site markers include:
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
b) Red line boundary markers
for main streets and roads of area planned for new construction or renovation
within urban and functional areas;
c) Markers defining boundaries
of no construction areas; conservation areas of historical and cultural
monuments; and other protected areas.
3. For communes, the on-site
markers include:
a) Road centerline markers for
main roads in the commune, inter-village roads, main village roads, and main
intra-field roads planned for new construction or renovation within the
commune;
b) Red line boundary markers
for main roads in the commune, inter-village roads, main village roads, and
main intra-field roads associated with key technical infrastructure works
planned for new construction or renovation within the commune;
c) Markers defining boundaries
of no construction areas; conservation areas of historical and cultural
monuments; and other protected areas.
Article
35. Marking in accordance with subdivision planning for urban and rural areas
1. On-site markers for
subdivision planning include:
a) Road centerline markers for
roads planned for new construction or renovation within the planned area;
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
c) Markers defining boundaries
of no construction areas, including markers identifying boundary lines of no
construction zones, conservation areas of historical and cultural monuments,
and other protected areas within the planned area.
2. The competent authority
approving the urban and rural planning shall decide, when approving the marking
dossier, whether to apply information technology in marking (marking on digital
dossiers) instead of on-site marking strictly according to the marking dossier.
However, it must organize public disclosure to relevant agencies,
organizations, and affected individuals, and regularly inspect and supervise
the field to ensure the development does not violate the approved urban and
rural planning.
Article
36. Marking in accordance with the detailed planning for urban and rural areas
1. On-site markers for detailed
planning for urban and rural areas include:
a) Road centerline markers for roads,
alleys planned for new construction or renovation within the planned area;
b) Red line boundary markers
for roads, alleys planned for new construction or renovation within the planned
area; The shaft of the red line boundary marker must clearly display the
specified parameters of the construction line and construction elevation;
c) Markers defining boundaries
of no construction areas, including markers identifying boundary lines of no
construction zones, conservation areas of historical and cultural monuments,
and other protected areas within the planned area.
2. The competent authority
approving the urban and rural planning shall decide, when approving the marking
dossier, whether to apply information technology in marking (marking on digital
dossiers) instead of on-site marking strictly according to the marking dossier.
However, it must organize public disclosure to relevant agencies,
organizations, and affected individuals, and regularly inspect and supervise
the field to ensure the development does not violate the approved urban and
rural planning.
Section 3.
COOPERATION IN ON-SITE IMPLEMENTING, MANAGING MARKER, STORING RECORDS, AND
PROVIDING INFORMATION ABOUT MARKERS
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
1. The agency or unit carrying
out on-site marking must send the marking dossier to the relevant
grassroots-level People's Committee before carrying out survey, measurement,
on-site marking
2. The grassroots-level
People's Committee, based on the survey, measurement, and marking plan, shall
cooperate with the marking unit.
3. In case the position of the
on-site marker is adjusted or differ from the approved marking dossier, the
marking unit must report this at the commissioning phase to the urban and rural
planning management agencies for updating the related planning dossiers.
4. After completing the on-site
marking according to the dossier, the agency organizing the marking must
conduct commissioning and hand over the markers to the relevant
grassroots-level People's Committee for marker protection.
Article
38. Responsibilities for marker management and protection
1. The grassroots-level
People's Committee shall manage planning markers within their administrative
boundary. The grassroots-level People's Committee must organize annual
inspections to promptly identify any markers lost or displaced compared to the
approved marking dossier.
2. The grassroots-level
People's Committee shall protect the on-site markers, organize communication
campaigns to encourage the local community to participate in marker protection
and management; in case of displacement or damage to markers, they must
promptly report in writing to the provincial People's Committee and relevant
managing agencies to plan for restoration.
Article
39. Storage of dossiers on marking in accordance with planning
1. Planning management agencies
and land management agencies at all levels shall store marking dossiers
approved by the People's Committee at the same level, and providing documents
and data related to markers to organizations, agencies, and individuals upon
lawful request.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
3. The provincial People's
Committee is responsible for making copies of the marking dossiers and handing
them over to the relevant grassroots-level People's Committee for managing
on-site markers.
4. The dossiers on marking in
accordance with urban and rural planning are documents for local authorities to
use in publicizing planning, managing planning, implementing investment
projects, issuing construction permits, land use right certificates, and land
allocation (or lease) as prescribed.
Article
40. Provision of information about marking dossiers to organizations and
individuals upon request
1. Agencies assigned to manage
and store marking dossiers as stipulated in Clause 4 of Article 52 of the Law
on Urban and Rural Planning are responsible for organizing the receipt and
provision of approved marking dossiers upon the request of organizations and
individuals.
2. Agencies may provide
information about marker in writing by providing certified copies of approved
marking dossiers by competent authorities.
Chapter V
DIGITAL GEOGRAPHIC
DATABASE OF URBAN AND RURAL PLANNING
Article
41. Rules for establishing digital geographic database of urban and rural
planning
1. The geographic database for
urban and rural planning must meet the following technical requirements:
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
b) In cases where there is
insufficient legal basis to precisely determine the location, boundaries, or
alignment of a planned geographic object, symbols representing the expected
location, boundary, and alignment of the geographic object in the geographic
database shall be elaborated in subsequent planning steps or during the
preparation phase of construction investment projects.
2. The content of the
geographic database for urban and rural planning must be consistent and
synchronized with the legal database; correctly and fully represent national
territorial sovereignty; and comply with international treaties to which the
Socialist Republic of Vietnam is a signatory.
3. The prioritization of
geographic objects in the geographic database must follow these principles:
a) Geographic objects related
to the main content of the planning are prioritized over other contents;
b) Priority order in displaying
geographic objects is: point objects, line objects, then area objects.
Article
42. Technical requirements for implementing geographic data of urban and rural
planning
1. Urban and rural planning
diagrams and maps must be established in the national coordinate reference
system according to Prime Minister’s Decision No. 83/2000/QD-TTg dated July 12,
2000, on the application of the VN-2000 coordinate system and the Circular
973/2001/TT-TCDC dated June 20, 2001, guiding the application of the VN-2000
coordinate system, and based on the national topographic map at a scale
corresponding to the scale of the diagrams and maps.
2. The GIS database shall be
packaged in a suitable GIS software format, including Data Groups; each
thematic data group contains data layers. Urban and rural planning data themes
are organized by objects identified in the dossier: planning boundaries; space
organization; urban design; land use; traffic; technical preparation;
electricity supply; other energy systems; communications; water supply;
wastewater and environmental sanitation; urban and rural planning markers.
3. Detailed regulations on the
urban and rural planning database are provided in Appendix II attached hereto.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
The development, protection,
administration, processing, and use of digital data; digital products and
services; state management; rights, obligations, and responsibilities of
agencies, organizations, and individuals related to geographic data of urban
and rural planning shall be conducted in accordance with the laws on Data.
Chapter
VI
IMPLEMENTATION
Article
44. Implementation clauses
1. This Circular comes into
force from July 01, 2025.
2. The following Circulars are
fully annulled:
a) Circular No. 04/2022/TT-BXD
dated October 24, 2022 of the Minister of Construction on the dossier on tasks
and urban and rural planning schemes for inter-district and district areas,
urban planning, urban and rural planning of functional areas and rural
planning.
b) Circular No. 10/2016/TT-BXD
dated March 15, 2016 of the Minister of Construction on the planting and
management of boundary markers under construction planning.
c) Circular No. 06/2013/TT-BXD
dated May 13, 2013 of the Minister of Construction on guidance on content of
urban design and Circular No. 16/2013/TT-BXD dated October 16, 2013 Circular
No. 06/2013/TT-BXD.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
1. In the process of reviewing
and adjusting approved urban planning and construction planning, the components
and symbols of planning dossiers shall be adjusted in accordance with herewith.
2. For approved urban and
construction planning that has not yet developed or has incomplete electronic
records databases, the People's Committees of provinces and centrally
affiliated cities must plan, allocate funds, and develop additional electronic
records in accordance herewith.
Article
46. Responsibility for implementation
1. Organizations and
individuals participating in the development, appraisal and approval of urban
and rural planning are responsible for implementing this Circular on dossiers
on planning tasks and urban and rural planning dossiers.
2. The Department of Planning -
Architecture, the Department of Technical Infrastructure of the Ministry of
Construction; provincial urban and rural planning agencies are responsible for
providing guidance and inspecting the implementation of the provisions of this
Circular.
PP. MINISTER
DEPUTY MINISTER
Nguyen Truong Van