RESOLUTION
APPROVING
INVESTMENT IN NINH THUAN NUCLEAR POWER PROJECT
THE NATIONAL ASSEMBLY OF THE
SOCIALIST REPUBLIC OF VIETNAM
Pursuant to the 1992
Constitution of the Socialist Republic of Vietnam, which was amended and
supplemented under Resolution No. 51/2001/QH10;
Pursuant to Resolution No. 66/2006/QH11 of June 29, 2006, of the XIth
National Assembly, the 9th session, on important national projects
and works to be submitted to the National Assembly for investment approval;
Pursuant to the June 3, 2008 Law on Atomic Energy;
After considering the Government's Report No. 08/TTr-CP of September 30, 2009;
Verification Report No. 739/BC- UBKHCNMT12 of October 20, 2009, of the National
Assembly's Committee on Science, Technology and Environment; the Government's
Additional Report No. 15/TTr-CP of October23,2009; other Government reports on
the proposal on investment in Ninh Thuan Nuclear Power Project, and opinions of
National Assembly deputies;
RESOLVES:
Article 1.
To approve investment in Ninh
Thuan Nuclear Power Project, including two plants each having two engine
groups, to supply electricity for the national power grid, contributing to the
socio-economic development of the country and Ninh Thuan province.
The site of construction: Ninh
Thuan nuclear power plant 1 will be located in Phuoc Dinh commune. Thuan Nam
district. Ninh Thuan province; and Ninh Thuan nuclear power plant 2 in Vinh Hai
commune, Ninh Hai district, Ninh Thuan province.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Below are several basic
parameters of the Project:
1. The Project's scope: The
capacity of two plants will be over 4.000 megawatts (MW) suitable to the
selected technology and furnace generation, with the capacity of Ninh Thuan
nuclear power plant 1 to be about 2,000 MW and that of Ninh Thuan nuclear power
plant 2 to be about 2,000 MW;
2. Main technology: Light water
reactors of the most modern generation, already checked, to ensure absolute
safety and economic efficiency at the time of formulation of the investment
project;
3. Construction land area: To
use land in the most appropriate and thrifty manner;
4. Total investment: estimated
at VND 200 trillion (at the time of formulation of the Project in the 4'"
quarter of 2008);
5. Implementation time and
roadmap:
- To commence construction of
Ninh Thuan nuclear power plant 1 by 2014. and put the first engine group into
operation by 2020.
- Based on the preparation
situation, the Government shall report to the National Assembly for decision on
the time to commence construction of Ninh Thuan nuclear power plant 2.
Article 3.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
1. To promptly finalize and
approve master plans and fully and comprehensively promulgate legal documents
and technical standards and regulations on construction, management, operation
and exploitation of nuclear power plants;
2. To calculate work designs
according to special standards, ensuring the highest security and safety. To
study and fully assess impacts of geological formation faults and phenomena of
climate change and sea level rise in the project implementation area; to
elaborate and approve the Project's environmental impact assessment report
according to regulations;
3. To elaborate detailed plans
for the relocation and resettlement of local inhabitants and properly organize
the implementation thereof, and construct infrastructure facilities serving the
Project, ground area and auxiliary structures serving the construction of the
plants;
4. To adopt policies
prioritizing the construction of infrastructure facilities for developing
economic, cultural, educational and social welfare activities in the areas of
the plants under Article 5 of the Law on Atomic Energy;
5. To select highly experienced
contractors for the designing, creation, construction and operation of nuclear
power plants from countries with high scientific and technological potential in
this field that have implemented many nuclear power plant projects, are
financially viable and have reasonable investment ratios. To make a plan on
incrementally increasing localization rates in construction and equipment
manufacture;
6. To expeditiously implement
plans on training of human resources in the field of atomic energy and nuclear
power for the construction with quality and operation of the nuclear power
plants, examining, supervising and assessing safety in the process of
constructing, operating and exploiting these plants;
7. To study and assess natural
resources and deposit of uranium, and the capability of exploiting, processing
and domestic need for using uranium for a long time;
8. To prepare master plans on
land use to meet requirements of building a site for safely treating nuclear
waste;
9. To properly carry out
information work and mobilization of the people through various specific forms,
creating high consensus in society.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
The Government shall study and
formulate special mechanisms and policies permitting investors to accumulate
capital and banks to provide credit; and those on compensation and support of
resettlement; construction of socioeconomic infrastructure, organization of
production and stabilization of the life of local inhabitants in the area to be
affected by the construction of the plant, and submit them to the National Assembly
for consideration and decision.
Article 5.
1. Before commencing
construction of the first engine group, the Government shall report on
preparation results to the National Assembly.
2. After commencing investment
in the Project, annually the Government shall report on the implementation of
the Project to the National Assembly.
3. The National Assembly
Standing Committee, the Ethnic Council, the Committees of the National
Assembly, delegations of National Assembly deputies and individual National Assembly
deputies shall, within the ambit of their respective tasks and powers, oversee
the implementation of this Resolution.
This Resolution takes effect on
the date of its adoption by the National Assembly.
This Resolution was adopted on
November 25, 2009, by the XIth National Assembly of the Socialist
Republic of Vietnam at its 6th session.-
...
...
...