THE MINISTRY OF FINANCE OF VIET NAM
----------

THE SOCIALIST REPUBLIC OF VIET NAM
Independence-Freedom-Happiness
-----------------

No. 134/2026/TT-BTC

Hanoi, September 09, 2026

 

CIRCULAR

PRESCRIBING FORMS OF REQUEST FOR PROPOSALS USED IN DIRECT CONTRACTING, EVALUATION REPORT, APPRAISAL, INSPECTION AND SUPERVISION REPORT, AND REPORT ON PERFORMANCE OF BIDDING ACTIVITIES  

Pursuant to the Law on Bidding No. 22/2023/QH15, as amended by the Law No. 57/2024/QH15, the Law No. 90/2025/QH15, the Law No. 116/2025/QH15, the Law No. 133/2025/QH15, and the Law No. 142/2025/QH15;

Pursuant to the Government’s Decree No. 214/2025/ND-CP dated August 04, 2025 elaborating and providing guidelines for implementation of the Law on Bidding regarding contractor selection, as amended by the Government’s Decree No. 165/2026/ND-CP dated May 15, 2026, the Government’s Decree No. 170/2026/ND-CP dated May 15, 2026, and the Government’s Decree No. 349/2026/ND-CP dated September 09, 2026;

Pursuant to the Government’s Decree No. 274/2026/ND-CP dated July 07, 2026 elaborating and providing guidelines for implementation of the Law on Bidding regarding selection of investors for implementation of business investment projects;

Pursuant to the Government’s Decree No. 29/2025/ND-CP dated February 24, 2025 defining functions, tasks, powers and organizational structure of the Ministry of Finance of Viet Nam, as amended by the Government's Decree No. 166/2025/ND-CP dated June 30, 2025;

At the request of the Director General of the Public Procurement Agency;  

The Minister of Finance of Viet Nam hereby promulgates a Circular prescribing forms of request for proposals used in direct contracting, evaluation report, appraisal, inspection and supervision report, and report on performance of bidding activities.

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



1. This Circular provides detailed regulations on forms of request for proposals (RFP) used in direct contracting, evaluation report, appraisal, inspection and supervision reports, and report on performance of bidding activities as prescribed in point c clause 1 Article 146 of the Government’s Decree No. 214/2025/ND-CP dated August 04, 2025, and point a clause 1 Article 77 of the Government’s Decree No. 274/2026/ND-CP dated July 07, 2026.

2. This Circular applies to authorities, organizations and individuals performing or involved in the activities specified in clause 1 of this Article.

Article 2. Use of Forms and Appendixes

1. Forms of request for proposals (RFP) used in domestic direct contracting under the common procedure prescribed in the Government’s Decree No. 214/2025/ND-CP dated August 04, 2025, as amended by the Government’s Decree No. 165/2026/ND-CP dated May 15, 2026, the Government’s Decree No. 170/2026/ND-CP dated May 15, 2026, and the Government’s Decree No. 349/2026/ND-CP dated September 09, 2026 (hereinafter referred to as the “Decree No. 214/2025/ND-CP”) include:

a) Form No. 1A used for preparing RFP for a construction package;

b) Form No. 1B used for preparing RFP for a procurement of goods package;   

c) Form No. 1C used for preparing RFP for a non-consulting service package;

d) Form No. 1D used for preparing RFP for a consulting service package;

dd) Form No. 1E is used for preparing the RFP for an EP package;

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



g) Form No. 1H is used for preparing the RFP for a PC package;

h) Form No. 1I is used for preparing the RFP for an EPC package.

Regarding packages applying the international direct contracting method, and packages applying direct contracting with requirements for protection of state secrets as prescribed in clause 6 Article 78 of the Decree No. 214/2025/ND-CP, employers shall modify the RFP forms enclosed with this Circular in accordance with the guidance in Appendix 8.

2. Forms of evaluation report include:

a) Form No. 2A used for preparing bid evaluation reports for non-consulting service packages, procurement of goods packages, construction packages, mixed packages, medical device hiring or purchasing packages applying the offline limited bidding or competitive bidding under the single-stage one-envelope procedure;

b) Form No. 2B used for preparing bid evaluation reports for non-consulting service packages, procurement of goods packages, construction packages, and mixed packages, medical device hiring or purchasing packages applying the offline limited bidding or competitive bidding under the single-stage two-envelope procedure;

c) Form No. 2C used for preparing bid evaluation reports for consulting service packages applying the offline limited bidding or competitive bidding method.

Regarding reports for evaluation of bids for packages applying the two-stage procedure, expressions of interest (EOI), prequalification applications or proposals, employers may make modifications to the evaluation report forms enclosed herewith provided that such modifications are not contrary to provisions of the Law on Bidding and the Decree No. 214/2025/ND-CP.

3. Forms of appraisal report are used for both online and offline bidding, including:

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



b) Form No. 3B used for preparing reports on appraisal of list of technically-responsive bidders for packages applying the single-stage two-envelope procedure, and packages applying the online quotation method under the common procedure;

c) Form No. 3C used for preparing reports on appraisal of contractor selection results.

Regarding reports on appraisal of bidding documents for packages applying the two-stage procedure, EOI request, prequalification document, RFPs; appraisal of results of evaluation of EOIs or prequalification applications; appraisal of list of technically-responsive bidders for packages applying the two-stage procedure; appraisal of contractor selection results for packages applying the two-stage procedure, packages applying the online quotation, direct contracting or direct procurement method, employers may make modifications to the appraisal report forms enclosed herewith provided that such modifications are not contrary to provisions of the Law on Bidding and the Decree No. 214/2025/ND-CP.

4. Forms used in inspection of bidding activities include:

a) Form No. 4.1A used for preparing the plan for periodic inspection of bidding activities;

b) Form No. 4.1B used for preparing a detailed inspection plan;

c) Form No. 4.2 used for preparing the draft report on performance of contractor/investor selection tasks;

d) Form No. 4.3 used for preparing report on inspection of contractor/investor selection;

dd) Form No. 4.4 used for preparing conclusion on inspection of contractor/investor selection;

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



5. Forms of report on the results of supervision of bidding activities and report on updating of information on contractor selection activities as prescribed in point d clause 7 Article 3 of the Law on Bidding include:

a) Form No. 5.1 used for preparing the report on the results of supervision of bidding activities;

b) Form No. 5.2 used for preparing the report on updating of information on contractor selection activities as prescribed in point d clause 7 Article 3 of the Law on Bidding.

6. Form No. 6 is used for preparing reports on performance of bidding activities.

7. Appendixes:

a) Appendix 1: Bid closing record;

b) Appendix 2A: Bid opening record (for packages applying the single-stage one-envelope procedure);

c) Appendix 2B: Record of opening of technical proposals (for packages applying the single-stage two-envelope procedure);

d) Appendix 2C: Record of opening of financial proposals (for packages applying the single-stage two-envelope procedure);

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



e) Appendix 4: Inspection notice;

g) Appendix 5: Record of announcement of the inspection decision;

h) Appendix 6: Notice of termination of direct inspection;

i) Appendix 7: Form of commitment;

k) Appendix 8: Guidelines for formulating RFP forms for packages with requirements for protection of state secrets and packages applying the international direct contracting method.

Regarding request for approval of the RFP, the decision on approval of the RFP, the decision on approval of the list of technically-responsive bidders, the contract negotiation record (if any), and the decision on approval of contractor selection results for packages applying offline bidding, employers may make modifications to the corresponding forms in the Appendixes enclosed with Circular No. 79/2025/TT-BTC dated August 04, 2025 of the Minister of Finance of Viet Nam, as appropriate, provided that such modifications are not contrary to the Law on Bidding and the Decree No. 214/2025/ND-CP.

8. Regarding the case prescribed in point e clause 2 Article 78 of the Decree No. 214/2025/ND-CP, the direct contracting method applies to the construction packages under projects or procurement cost estimates of the same employer or another employer. A construction package is considered to have its scale and nature similar to a package which has been executed adopting the competitive bidding or selective bidding method if:

a) They have the same structural type and grade of works as prescribed by law on construction; in case the grade of works of the construction package for which contract has been signed is higher than that of the package in question, the requirement regarding grade of works is also considered satisfactory;

b) The value of the package in question does not exceed 200% of the contract value (including the contract value after modifications are made) of the construction package for which a contract has been signed, in case an independent bidder or consortium bidder is directly contracted; or the value of the package in question does not exceed 200% of the value of construction tasks of the construction package for which a contract has been signed undertaken by the consortium member under the signed contract, in case this consortium member is directly contracted.

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



9. If any modifications to the RFP form specified in clause 1 of this Article are deemed necessary, the entity in charge of formulating, appraising (if any) and approving the RFP must ensure that such modifications are appropriate to the requirements of the package, and are not contrary to provisions of the Law on Bidding and the Decree No. 214/2025/ND-CP. Such modifications and reasons therefor must be clearly stated in the request for approval of the RFP submitted to the employer for consideration and decision, except for the contents prescribed in Appendix 8 enclosed with this Circular. In all cases, the employer must ensure that the selected bidder shall meet capacity and experience requirements, and have appropriate technical solutions for executing the package on the schedule and in a manner meeting quality requirement and other requirements set out in the RFP.

Article 3. Format of attached files and technical handling in the event of a system incident beyond control

1. The format of attached files and the technical handling in the event of a System incident beyond control shall comply with the corresponding provisions of Articles 5 and 6 of Circular No. 79/2025/TT-BTC.

2. Where the RFP attached to the System does not comply with the requirements specified in Clause 1 of this Article or, for any other reason, cannot be opened or read, the employer shall re-upload and re-issue the entire RFP.

3. Where a proposal does not comply with the requirements specified in Clause 1 of this Article or, for any other reason, cannot be opened or read, the employer shall request the bidder to clarify the proposal.

Article 4. Authorities and organizations in charge of submitting reports on performance of bidding activities

1. Each year, the Ministry of Finance of Viet Nam shall submit consolidated report on performance of bidding activities nationwide to the Prime Minister of Viet Nam.

2. Ministries, ministerial-level agencies, other central-level authorities, provincial-level People's Committees, and other authorities and organizations that are the regulated entities in Article 2 of the Law on Bidding shall submit annual reports on performance of bidding activities in provinces, fields or sectors under their management on the Vietnam National E-Procurement System (VNEPS) or submit written reports to the Ministry of Finance of Viet Nam where confidentiality requirements apply.

3. Provincial-level Departments of Finance, and units tasked with managing bidding activities shall assist Ministries, ministerial-level agencies, other central-level authorities, provincial-level People's Committees, and other authorities and organizations in expediting and preparing annual consolidated reports on performance of bidding activities by employers and procuring entities in provinces, fields or sectors under their management.

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Article 5. Time limits for submitting reports on performance of bidding activities

1. The Ministry of Finance of Viet Nam shall submit reports to the Prime Minister within Quarter II of the year following the reporting period.

2. Ministries, ministerial-level agencies, other central-level authorities, provincial-level People's Committees, and other organizations shall submit reports on VNEPS by February 01 of the year following the reporting period. If this deadline falls on a weekly day off or public holiday as defined in the Labour Code, it shall be extended to the next business day after the day off or the public holiday.

3. Employers and procuring entities shall submit annual reports on their performance of bidding activities by the deadlines set by provincial-level Departments of Finance or units tasked with managing bidding activities.

Article 6. Effect

1. This Circular comes into force from September 09, 2026.

2. The Circular No. 80/2025/TT-BTC shall cease to have effect from the effective date of this Circular.

3. The Circular No. 79/2025/TT-BTC dated August 04, 2025 of the Ministry of Finance of Viet Nam is amended as follows:

a) Form No. 04A, Chapter VI of Forms No. 3A, 3B, 4A, 4B, 5A, 5B, 7A, 7B, 8A, 8B, 9A, 9B, 10A, 10B, 11A, 11B, 12A and 12B enclosed with Circular No. 79/2025/TT-BTC is amended as follows:

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



BID SECURITY/ SURETY BOND CERTIFICATE(1)

(For an independent Bidder)

Beneficiary (Obligee): ___ [insert the name and address of the Employer as specified in Section 1.1 E-BDL]

Date of issuance: ___ [insert the date of issuance of this form]

BID SECURITY/ SURETY BOND CERTIFICATE No.: ___ [insert the reference number of the bid security]

Guarantor: ___ [insert the name and address of the place of issuance, unless indicated in the letterhead]

We have been informed that the Principal, _____ [insert name of the Bidder] (hereinafter referred to as the “Bidder”), will submit a bid for the _____ [insert name of the package] package under the ____ [insert name of the project/procurement cost estimate] project/procurement cost estimate, pursuant to the Invitation for bid/E-TBMT No.____ [insert the reference number of the Invitation for bid/E-TBMT].  

We are issuing this guarantee for an amount of ____ [insert the amount in figures, in words and currency unit] in favor of the Beneficiary to support the Bidder’s submission of bid.

This Bid Security/Surety Bond Certificate shall remain valid for ___ (2) days from ___ day of ___ month ___ year___(3).

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



1. After the bid submission deadline and during the validity period of its E-HSDT, the Bidder submits a request for withdrawal of its E-HSDT or gives a written refusal to perform one or some tasks proposed in its E-HSDT in accordance with the requirements laid down in E-HSMT;

2. The Bidder performs any of the prohibited acts specified in Article 16 of the Law on Bidding or commits violations against the Law on Bidding resulting in bid cancellation;

3. The Bidder fails to furnish the required performance security as prescribed in Article 68 of the Law on Bidding;

4. The Bidder fails or refuses to carry out document verification  within 05 working days  from the receipt of the invitation to the document verification, or, after the document verification has been carried out, refuses to sign the document verification record, except force majeure events;

5. The bidder fails or refuses to negotiate the contract (if any) within 05 working days from the receipt of the invitation for contract negotiation, or, after the contract negotiation has been carried out, refuses or fails to sign the contract negotiation record, except force majeure events;

6. The Bidder fails or refuses to carry out the completion of contract or framework agreement within 10 days from the receipt of the notice of acceptance and contract award from the Employer, except the cases specified in clause 4 Article 34 of the Decree No. 214/2025/ND-CP or force majeure events;

7. The Bidder fails or refuses to sign the contract or framework agreement within 10 days from the date of completion of that contract or framework agreement, except force majeure events.

Where the Bidder is the successful Bidder, this Bid Security/Surety Bond Certificate shall cease to be effective immediately upon the Bidder’s signing of the contract and submission of the performance security to the Beneficiary as agreed upon in the signed contract.  

Where the Bidder is not the successful Bidder, this Bid Security/Surety Bond Certificate shall cease to be effective immediately upon our receipt of a copy of the notice of contractor selection result or 30 days after the expiration of the Bidder’s E-HSDT, whichever occurs earlier.

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



 

 

Lawful representative of the Guarantor
[insert the name, title, signature and seal]

Notes:

(1) Delete the phrase “Surety Bond Certificate” where a Bid Security is provided; delete the phrase “Bid Security” where a Surety Bond Certificate is provided.

The Bid Security/Surety Bond Certificate shall be considered invalid where the amount specified in therein is lower than, or its validity period is shorter than, that required under Section 18.2 of E-BDL; it contains inaccurate name of the Beneficiary; the Bid Security/Surety Bond Certificate provided is not the original or does not bear a valid signature or has been signed before the Employer issues E-HSMT; or it contains any conditions disadvantageous to the Employer.

(2) Insert the number of validity days specified in Section 18.2 of E-BDL.

(3) Insert the day on which the bid submission deadline is set as prescribed in E-TBMT. The period of validity of the Bid Security/Surety Bond Certificate shall start from the date of the bid submission deadline to the last effective date of the Bid Security/Surety Bond Certificate (the expiry of the Bid Security/Surety Bond Certificate may occur at any time during its last effective date and does not necessarily extend to the end of that day).

(4) Where the Bid Security/Surety Bond Certificate omits one or more of the undertakings specified above, it shall be considered to contain a condition disadvantageous to the Employer as prescribed in Section 18.3 of the E-CDNT, and the Bid Security/Surety Bond Certificate shall be considered invalid.”

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



“Form No. 04B (Attached scanned file)

 

BID SECURITY/ SURETY BOND CERTIFICATE (1)

(For a consortium Bidder)

 

Beneficiary (Obligee):___ [insert the name and address of the Employer as specified in Section 1.1 E-BDL]

Date of issuance: ___ [insert the date of issuance of this form]

BID SECURITY/ SURETY BOND CERTIFICATE No.: ___ [insert the reference number of the bid security]

Guarantor:___ [insert the name and address of the place of issuance, unless indicated in the letterhead]

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



We are issuing this guarantee for an amount of ____ [insert the amount in figures, in words and currency unit] in favor of the Beneficiary to support the Bidder’s submission of bid for this package.

This Bid Security/Surety Bond Certificate shall remain valid for ___ (3) days from ___ day of ___ month ___ year___(4).

At the request of the Bidder, we, as Guarantor, hereby undertake(5) to pay the Beneficiary a sum of ____ [insert total amount in figures, in words and currency unit] upon receipt by us of the Beneficiary’s written statement stating that the Bidder is in breach of its obligations in the following circumstances:   

1. After the bid submission deadline and during the validity period of its E-HSDT, the Bidder submits a request for withdrawal of its E-HSDT or gives a written refusal to perform one or some tasks proposed in its E-HSDT in accordance with the requirements laid down in E-HSMT;

2. The Bidder performs any of the prohibited acts specified in Article 16 of the Law on Bidding or commits violations against the Law on Bidding resulting in bid cancellation;

3. The Bidder fails to furnish the required performance security as prescribed in Article 68 of the Law on Bidding;

4. The Bidder fails or refuses to carry out document verification  within 05 working days  from the receipt of the invitation to the document verification, or, after the document verification has been carried out, refuses to sign the document verification record, except force majeure events;

5. The bidder fails or refuses to negotiate the contract (if any) within 05 working days from the receipt of the invitation for contract negotiation, or, after the contract negotiation has been carried out, refuses or fails to sign the contract negotiation record, except force majeure events;

6. The Bidder fails or refuses to carry out the completion of contract or framework agreement within 10 days from the receipt of the notice of acceptance and contract award from the Employer, except the cases specified in clause 4 Article 34 of the Decree No. 214/2025/ND-CP or force majeure events;

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



8. If any member of the consortium____ [insert the full name of the consortium Bidder] commits violations against law resulting in forfeiture of the bid security as prescribed in Section 18.5 of E-CDNT, the bid securities of all consortium members shall not be returned.

Where the Bidder is the successful Bidder, this Bid Security/Surety Bond Certificate shall cease to be effective immediately upon the Bidder’s signing of the contract and submission of the performance security to the Beneficiary as agreed upon in the signed contract.  

Where the Bidder is not the successful Bidder, this Bid Security/Surety Bond Certificate shall cease to be effective immediately upon our receipt of a copy of the notice of contractor selection result or 30 days after the expiration of the Bidder’s E-HSDT, whichever occurs earlier.

Any claim for payment under this Bid Security/Surety Bond Certificate must be received by us at the office on or before the last day of its validity. We hereby undertake to make unconditional and irrevocable payments of any sum or sums not exceeding in total the guaranteed amount as state above to the Employer upon receipt by us of the Employer’s request for payment.

 

 

Lawful representative of the Guarantor
[insert the name, title, signature and seal]

Notes:

(1) Delete the phrase “Surety Bond Certificate” where a Bid Security is provided; delete the phrase “Bid Security” where a Surety Bond Certificate is provided.

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



(2) Insert the name of the Bidder adopting one of the following options:

- Insert the name of the consortium. For example, the Bidder A and the Bidder B jointly establish a consortium to submit the bid, insert “The consortium of A + B”;

- Insert the name of the member in charge of furnishing the bid security on behalf of the consortium or for all other members of the consortium. For example, the Bidder A, the Bidder B and the Bidder C jointly establish a consortium to submit the bid, and the Bidder A is appointed to furnish the bid security for the entire consortium under the consortium agreement, insert "the Bidder A (on behalf of the consortium of A + B+ C)”; if the Bidder B furnishes the bid security for both the Bidder B and the Bidder C, insert “the Bidder  B (on behalf of the Bidder B and the Bidder C)";

- Name of the consortium member that separately furnishes its bid security;

- Although the responsibility to furnish the bid security is not specified in the consortium agreement, the consortium Bidder is also considered to have met the bid security requirement if the sum of bid securities furnished by members of the consortium, as indicated in forms of bid security attached to its E-HSDT, meets the requirement of E-HSMT.

(3) Insert the number of validity days specified in Section 18.2 of E-BDL.

(4) Insert the day on which the bid submission deadline is set as prescribed in E-TBMT. The period of validity of the Bid Security/Surety Bond Certificate shall start from the date of the bid submission deadline to the last effective date of the Bid Security/Surety Bond Certificate (the expiry of the Bid Security/Surety Bond Certificate may occur at any time during its last effective date and does not necessarily extend to the end of that day).

(5) Where the Bid Security/Surety Bond Certificate omits one or more of the undertakings specified above, it shall be considered to contain a condition disadvantageous to the Employer as prescribed in Section 18.3 of the e-ITB, and the Bid Security/Surety Bond Certificate shall be considered invalid.”

c) The phrase “50 triệu đồng” (“VND 50 million”) is replaced with the phrase “100 triệu đồng” (“VND 100 million”) in note (1) of Table 01 Section III and note (1) of Table 02 Section IV of Form No. 2A enclosed with Circular No. 79/2025/TT-BTC.

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Article 7. Transition

1. For packages for which the bidding documents or RFP have been issued, or the draft contract has been sent, in respect of packages applying the direct contracting under the simplified procedure, before the effective date of this Circular, the contractor selection, contract conclusion and performance management, and resolution of complaints shall continue to be carried out in accordance with Point a Clause 2 Article 27 of Decree No. 349/2026/ND-CP, Circular No. 79/2025/TT-BTC, and Circular No. 80/2025/TT-BTC.

2. For decisions on inspection of bidding activities issued before the effective date of this Circular, the inspection shall continue to be carried out in accordance with such decisions and the provisions of Circular No. 80/2025/TT-BTC./.

 


 
 

PP. MINISTER
DEPUTY MINISTER



Tran Quoc Phuong

 

APPENDIX

(Enclosed with Circular No. 134/2026/TT-BTC dated September 09, 2026 of the Minister of Finance of Viet Nam)

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Appendix 2A: Bid opening record (for packages applying the single-stage one-envelope procedure)

Appendix 2B: Record of opening of technical proposals (for packages applying the single-stage two-envelope procedure)

Appendix 2C: Record of opening of financial proposals (for packages applying the single-stage two-envelope procedure)

Appendix 3: Inspection decision

Appendix 4: Inspection notice

Appendix 5: Record of announcement of the inspection decision

Appendix 6: Notice of termination of direct inspection

Appendix 7: Form of commitment

Appendix 8: Guidelines for formulating RFP forms for packages with requirements for protection of state secrets and packages applying the international direct contracting method.

You are not logged!


So you only see the Attributes of the document.
You do not see the Full-text content, Effect, Related documents, Documents replacement, Gazette documents, Written in English,...


You can register Member here


You are not logged!


So you only see the Attributes of the document.
You do not see the Full-text content, Effect, Related documents, Documents replacement, Gazette documents, Written in English,...


You can register Member here


You are not logged!


So you only see the Attributes of the document.
You do not see the Full-text content, Effect, Related documents, Documents replacement, Gazette documents, Written in English,...


You can register Member here


Circular No. 134/2026/TT-BTC dated September 09, 2026 on prescribing forms of request for proposals used in direct contracting, evaluation report, appraisal, inspection and supervision report, and report on performance of bidding activities
Official number: 134/2026/TT-BTC Legislation Type: Circular
Organization: The Ministry of Finance Signer: Tràn Quoc Phuong
Issued Date: 09/09/2026 Effective Date: Premium
Gazette dated: Updating Gazette number: Updating
Effect: Premium

You are not logged!


So you only see the Attributes of the document.
You do not see the Full-text content, Effect, Related documents, Documents replacement, Gazette documents, Written in English,...


You can register Member here


Circular No. 134/2026/TT-BTC dated September 09, 2026 on prescribing forms of request for proposals used in direct contracting, evaluation report, appraisal, inspection and supervision report, and report on performance of bidding activities

Address: 17 Nguyen Gia Thieu street, Ward Xuan Hoa, Ho Chi Minh City
Phone: (+84)28 3930 3279 (06 lines)
Email: inf[email protected]

Copyright© 2019 by THƯ VIỆN PHÁP LUẬT
Editorial Director: Mr. Bui Tuong Vu

DMCA.com Protection Status