I. Wind power
development objectives and policies
I.1. Wind power development
objectives in revised Power Planning VII
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
I.2. Policies
- The Prime Minister has
promulgated Decision No. 37/2011/QD-TTg dated June 29, 2011 on provision of
assistance in development of wind power projects in Vietnam (hereinafter
referred to as “Decision No. 37/2011/QD-TTg) and Decision No. 39/2018/QD-TTg
dated September 10, 2018 amending a number of Articles of Decision No.
37/2011/QD-TTg (hereinafter referred to as “Decision No. 39/2018/QD-TTg).
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
II. Criteria
for appraisal and approval of additions to the Planning
Based on incentive policies for
wind power project development and with the aim of transparency, some basic
criteria applicable to appraisal and approval of proposed additions to the
Planning include:
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
- Wind potential at the site of
the proposed project.
- Suitability of the proposed
project with the local land use plan and planning, with a focus on avoiding use
of forest land (especially natural forest) and mines and reserves of minerals
(such as titan).
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
- Financial capacity and
experience of the investor of the proposed project.
III. Revised
orientations of strategy for national energy development by 2030 with a vision
towards 2045 regarding wind power development and review of wind power
development size based on planning milestones
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
On February 11, 2020, the
Politburo promulgated Resolution No. 55-NQ/TW on orientations of strategy for
national energy development by 2030 with a vision towards 2045 (hereinafter
referred to as “Resolution No. 55”), which specifies the circumstances and
causes; direction viewpoints, objectives and visions; and main tasks and
solutions for the energy sector. This document shall act as the beacon for
regulatory bodies, mass organizations, socio-political organizations and
relevant parties to perform and cooperate in their tasks.
Regarding the renewable energy
sector, Resolution No. 55 provides the following guidelines:
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2. Main tasks and solutions:
“Devise breakthrough policies and mechanisms to encourage robust development of
renewable energy sources, which will provide alternatives to fossil fuels.
Prioritize wind and solar energy for electricity generation…. Establish and
develop a number of renewable energy centers in suitable regions”; “Encourage
development of rooftop and floating solar panels. Formulate assistance policies
and breakthrough mechanisms for development of offshore wind energy in
connection with implementation of Vietnam’s marine strategy”.
III.2. Calculation of wind
power development size by 2025 and 2030
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Multiple directions for power
source development have been proposed to balance demand and supply in the
upcoming period such as renewable energy development (especially wind and solar
power); power import from neighboring countries; acceleration of thermal power
projects and addition of new thermal power sources, especially proposed
LNG-to-power projects.
According to the overall report on
the revised Power Planning VII made by the Institute of Energy in February
2020, capacity needed for 2021 - 2030 demand and supply balance for both basic
and advanced options is forecasted as follows:
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Item/year
Installed capacity (MW)
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2020
2025
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2020
2025
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Total national power
demand
42080
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
90651
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Total installed
capacity
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
104824
145568
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
51410
81944
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Reserve capacity
(without wind and solar, pumped-storage)
22.2%
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
21.4%
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
In which:
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
19637
38842
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
33.2%
37.1%
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Power from gas
domestically generated + imported from Malaysia via pipes
7133
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
10774
12.1%
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
7.4%
New LNG-to-power
projects
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
1500
12750
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
1.4%
8.8%
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
0
1883
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
0.0%
1.8%
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Oil
1610
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
108
2.7%
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
0.1%
Imported
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
3370
5796
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
3.2%
4.0%
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
17766
19116
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
30.1%
18.2%
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Small hydropower plants
3800
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
6000
6.4%
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
4.1%
Wind (*)
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
6030
10090
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
5.8%
6.9%
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
6670
14450
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
11.3%
13.8%
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Biomass and other types
of renewable energy
544
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2244
0.9%
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
1.5%
Pumped-storage
(pump-storage plants + battery storage)
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2400
5400
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2.3%
3.7%
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Item/year
Installed capacity (MW)
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2020
2025
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2020
2025
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Total national power
demand
44224
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
100215
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Total installed
capacity
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
116699
169498
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
51410
82319
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Reserve capacity
(without wind and solar, pumped-storage)
16.2%
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
20.2%
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
In which:
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
19637
38842
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
32.7%
33.3%
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Power from gas domestically
generated + imported from Malaysia
7133
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
10024
11.9%
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
5.9%
New LNG-to-power
projects
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
1500
18000
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
1.3%
10.6%
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
0
2258
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
0.0%
1.9%
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Oil
1610
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
108
2.7%
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
0.1%
Imported
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
3370
5796
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2.9%
3.4%
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
17766
19116
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
29.6%
16.4%
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Small hydropower plants
3800
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
6000
6.3%
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
3.5%
Wind (*)
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
11630
18390
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
10.0%
10.8%
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
7670
20350
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
12.8%
17.4%
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Biomass and other types
of renewable energy
544
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2544
0.9%
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
1.5%
Pumped-storage (pump-storage
plants + battery storage)
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2400
5400
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2.1%
3.2%
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
With the abovementioned power
production, in 2025, additional wind power needed for the basic option is
6.030MW and for the advanced option is 11.630MW.
The advanced option may be
regarded as a plan for development of sufficient reserve sources of power in
case of high demand, unfavorable weather conditions or late completion of other
power projects.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
IV.1. Wind power projects added
to the Planning and put into operation
Total capacity of wind power
projects added to the Planning is approximately 4.800 MW, which is planned to
be put into operation mainly in the Mekong Delta and South Central Coast by
2021. However, only 9 wind power projects with a capacity of 350MW have been
put into operation so far.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
As of March 15, 2020, besides
projects already added to the Planning, the Ministry of Industry and Trade has
received proposals for approximately 250 wind power projects with a total
capacity of 45.000 MW to be added to the Planning from provincial People’s
Committees, which are classified based on their geographical locations as
follows:
1. North Central Coast (including
Ha Tinh, Quang Binh and Quang Tri): 51 proposed projects with a total capacity
of 2.919 MW.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
3. Central Highlands (including
Kon Tum, Gia Lai, Dac Lac, Dac Nong and Lam Dong): 91 proposed projects with a
total capacity of 11.733,8 MW.
4. Southeast (Ba Ria - Vung Tau):
2 proposed projects with a total capacity of 602,6 MW.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Total number of projects and
capacity of each region and province are provided for in Appendix 1.
V. Proposed
wind power capacity to be added to the Planning by 2025
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
As 4.800MW of wind power capacity
has been added to the Planning, the remaining wind power capacity to be added
to the Planning by 2025 is 1.230MW for the basic option and 6.830MW for the
advanced option.
Wind energy promotion is one of
the main and suitable directions provided for by the Politburo in Resolution
No. 55. On the other hand, short-term power shortage (2021 - 2024) is imminent
while large thermal power projects continue to fall behind schedule or have yet
to finalize their schedules, demand may rise and weather conditions might
become unfavorable. Thus, the advanced option should be selected.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Results of assessment of capacity
of regional electrical grids by 2025 (especially for North Central Coast,
Central Highlands, South Central Coast and Mekong Delta) by the Institute of
Energy (February 2020) are as follows:
V.1. North Central Coast
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Calculation results show that the
regional 110-220kV electrical grids are relatively capable of accommodating
power generated by local power sources in normal operating mode. However, if
either of the transformers of the Lao Bao 220kV substation (2x250MVA) encounters
a problem, the other transformer will be overloaded. Quang Tri is capable of
accommodating a maximum of 570 MW of additional wind power capacity (in normal
operating mode).
Ha Tinh has proposed Ha Tinh HBRE
Wind Farm project with a capacity of 120MW while Quang Binh has proposed
B&T Wind Farm project with a capacity of 252MW, both of which can be
accommodated by local electrical grids.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
V.2. South Central Coast
In Binh Dinh and Phu Yen, there
are quite a lot of solar power projects, and 04 wind power projects are being
proposed to be added to the Planning with a total capacity of 331 MW.
Calculations reveal that it would be difficult to incorporate more capacity
from wind power projects as the 220kV electrical grids of this area are quite
weak.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Binh Thuan proposes Thang Long
Wind project (Ke Ga), an offshore wind power project with a capacity of
3.400MW, to be added to the Planning. As only wind power sources put into
operation before December 2021 are considered, this project, put into operation
in 2022 - 2027, is not qualified.
Calculations done for wind power projects
located in Ninh Thuan show that, at the end of 2021, only when all transmission
grids added to the Planning with the approval of the Prime Minister are put
into operation (especially Thuan Nam 500kV substation and transmission lines)
while the Di Linh - Duc Trong 220kV transmission line is separated will the
local electrical grids be capable of accommodating an additional 340MW from
wind power sources and Trung Nam solar power plant (Thuan Nam) (in normal
operating mode).
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
V.3. Central Highlands
13 wind power projects in Central
Highlands, with a total capacity of 368MW, have been approved as new additions
to the Planning, while total capacity of wind power projects pending approval
is 11.733,8 MW. In which, 71,3% of capacity (8. 368MW) are from wind power
projects located in Gia Lai, 23% (2. 683MW) are from those located in Dak Lak
and 3,9% (460MW) are from those located in Dak Nong. Kon Tum and Lam Dong propose
only 1-2 project(s) with a capacity of 153,5MW and 69MW.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Available options to increase wind
power capacity for Central Highlands by 2021:
1. Option 1: raise the capacity of
Dak Nong and Pleiku 2 500kV substations to 2x900MVA:
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2. Option 2: raise the capacity of
Dak Nong and Pleiku 2 500kV substations to 2x900MVA; and build a 41-km Chu Se -
Pleiku 2 220kV transmission line:
If the 41-km Chu Se - Pleiku 2
220kV transmission line (AC500 or 2xAC330 cross section) is finished early, an
additional 250MW can be accommodated, increasing the total additional capacity
for Gia Lai and Dak Lak to approximately 1.400MW for 220kV grids. The Chu Se -
Pleiku 2 transmission line is a part of the Pleiku 2- Krong buk double-circuit
transmission line, which has been added to the Planning (2016-2020) and the
feasibility study report of which is being formulated. Thus, in order to
accelerate construction of this transmission line, suitable measures must be
taken to ensure it is put into operation in synchronization with wind power
projects in 2021.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Capacity of wind power projects
(such as Ia Pet - Dak Doa project (200MW) and Ia Nam project (400MW)) can be
accommodated if they are connected with 500kV grids. Projects shall be grouped
together to utilize shared electrical grid infrastructure.
List of proposed projects is
provided for in Appendix 4.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
1. Currently, 32 wind power
projects have been added to the Planning with a total capacity of approximately
2.000MW. If taking electrical grids approved to be added to the Planning by the
end of 2021, electrical grids of Ben Tre, Tra Vinh and Ca Mau can accommodate
power sources. For Soc Trang and Bac Lieu, some 110kV transmission lines (put
into operation in 2021) shall be renovated sooner than as stated in the power
development planning of each province (2026-2030).
With the abovementioned
conditions, total wind power capacity that can be additionally accommodated is
approximately 2.300MW.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Proposed 110kV grid projects:
- Build a 110 kV Ben Tre and 220
kV Ben Tre double-circuit transmission line with a length of 0.24 km and ACSR
cross section of 2x240.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
- Build a 110 kV double-circuit
transmission line from Ben Tre 220 kV substation to My Tho 220 kV substation
with a length of 15 km and ACSR cross section of 2x240.
Investment in theses transmission
lines can accommodate an additional 755MW (mostly in Ben Tre).
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Proposed 220kV projects:
- Build a 5-km 220 kV
double-circuit transmission line with ACSR cross section of 400 from Bac Lieu
220 kV substation that connects with the existing Ca Mau - Soc Trang 220 kV
transmission line (single-circuit, ACSR-795MCM equivalent to ACSR-400). This
220 kV transmission line is not yet added to the revised Power Planning VII and
power development planning of Bac Lieu.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
After adopting proposed solutions,
in normal operating mode, 220 kV grids can only accommodate an additional 200
MW from the wind power cluster(s) connected with the Gia Rai - Bac Lieu 220 kV
transmission line.
List of projects in this region
capable of being accommodated is provided for in Appendix 5.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
In Southeast region, only Ba Ria -
Vung Tau proposes 02 projects (Cong Ly Ba Ria Vung Tau project (102,6MW,
onshore) and HBRE Ba Ria - Vung Tau project (500MW, offshore)) to be added to
the Planning.
List of projects in this region
capable of being accommodated is provided for in Appendix 6.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Consolidating the above
calculations and analyses, by 2021, with some proposed renovation, acceleration
and works added to the Planning, electrical grids could accommodate
approximately 7.000 MW (in normal operating mode).
This amount of capacity is
relatively suitable for increased wind power capacity stated in the advanced
option (an additional 6.830MW) with due consideration taken of the reserve
amount in case some grid and source projects are unqualified.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Based on the above calculations
and analyses, the following electrical grid projects need to be added to the
Planning or accelerated to accommodate wind power projects:
1. Raise the capacity of Dak Nong
500kV substation from 2x450MVA to 2x900MVA.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
3. Build a 5-km Bac Lieu - Ca Mau
- Soc Trang 220kV transmission line.
4. Accelerate construction of Binh
Dai 220 kV substation and a 220 kV double-circuit transmission line from Binh
Dai 220 kV substation to Ben Tre (250 MVA; 2x50 km) from 2031 - 2035 to 2021 -
2025.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
With the abovementioned contents
and analyses, as October 31, 2021 (the time limit after which wind power
projects are no longer entitled to the mechanism provided for in Decision No.
39/2018/QD-TTg) draws nearer, to ensure transparency and effectiveness of the
Government’s incentive policies for sustainable and effective development of
renewable energy (especially wind power) so as to enrich the national power
supply, implement Resolution No. 55 and achieve Vietnam’s CO2 reduction target
in COP21, the Ministry of Industry and Trade would like to propose the
following to the Prime Minister:
1. Grant approval for guidelines
on revision of wind power development objectives by 2025 with the capacity of
11.630 MW to ensure sufficient reserve sources of power and power supply in
case of high demand, unfavorable weather conditions or late completion of other
power projects.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
3. Consider additions to the
Planning and/or acceleration of synchronized electrical grid projects (provided
for in Section VI) to accommodate proposed wind power projects.
4. Provincial People’s Committees
shall urgently review land use plans/planning and other types of planning intra
vires to initiate land repurposing procedure for renewable energy projects
added to the Planning, prioritizing land with low economic value and potential
for renewable energy development.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
6. EVN shall direct its members to
urgently invest in synchronized electrical grid projects to accommodate wind
power projects.
7. Wind power projects not added
to the Planning this time may continue to be considered, studied and appraised
to be added to the revised Power Planning VII if qualified or to the Power
Planning VIII.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
APPENDIX 1:
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Table 1. Capacity of wind power projects to be added to
planning by regions
No.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Quantity
Capacity (MW)
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
North
Central Coast
51
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2
Southeast
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
602.6
3
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
10
4,193.1
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Mekong
Delta
94
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
5
Central
Highlands
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
11,733.8
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
248
44,989.1
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
No.
Province
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Capacity (MW)
1
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2
602.6
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Bac
Lieu
19
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
3
Ben
Tre
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
12,063.0
4
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
3
225.0
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Binh
Thuan
1
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
6
Ca
Mau
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
4,249.0
7
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
23
2,683.4
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Dak
Nong
6
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
9
Gia
Lai
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
8,368.0
10
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
1
120.0
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Hau
Giang
1
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
12
Kon
Tum
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
153.5
13
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
1
68.9
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Ninh
Thuan
5
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
15
Phu
Yen
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
106.0
16
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
1
252.0
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Quang
Tri
49
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
18
Soc
Trang
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
1,748.8
19
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2
685.5
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Tra
Vinh
14
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Total
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
44,989.1
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
LIST OF WIND POWER PROJECTS TO BE ADDED TO PLANNING IN
NORTH CENTRAL COAST REGION
No.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Capacity (MW)
District
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Connection plan
Condition for capacity release
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
1
Huong
Linh 5 Wind Power Plant
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Huong Hoa
Quang Tri
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
In normal
operating mode (N-0)
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Huong
Hiep 2 Wind Power Plant
30
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Quang Tri
Connected to 110 kV busbar of 110/220kV Huong Linh
substation (gathering capacity in Huong Linh and adjacent areas), then
transmit capacity via a 220kV transmission line to the 220kV busbar of 220kV
Lao Bao substation
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
3
Huong
Hiep 3 Wind Power Plant
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Huong Hoa
Quang Tri
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
4
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
50
Huong Hoa
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Connecting 220kV from 220 kV Huong Tan substation via
single circuit transmission line,
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
TNC
Quang Tri 2 Wind Power
50
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Quang Tri
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Huong
Linh 7
30
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Quang Tri
Connected to 22/110 kV busbar of Gelex 3 Wind Power Plant
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
7
Huong
Linh 8
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Huong Hoa
Quang Tri
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
8
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
50
Huong Hoa
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Connected to 110 kV busbar of 220 kV Lao Bao substation
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Tan
Hop Wind Power Plant
38
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Quang Tri
Connected to 110 kV busbar of 220 kV Lao Bao substation
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
10
LIG
Huong Hoa 1 Wind Power Plant
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Huong Hoa
Quang Tri
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
11
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
48
Huong Hoa
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
12
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
40
Lao Bao
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
110 kV single circuit transmission line connected to 110
kV busbar of 220 kV Lao Bao substation, using 2-km 240 mm2 wire
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Tai
Tam Wind Power Plant
50
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Quang Tri
Connected using 220kV transmission line to 220kV Lao Bao
substation
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
14
Hoang
Hai Wind Power Plant
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Huong Hoa
Quang Tri
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
15
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
120
Ky Anh District and Ha Tinh Town
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Transit connection to Ky Anh – Ha Tinh 110 kV transmission
line
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
B&T
Wind Farm Cluster
252
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Quang Binh
Transit connection to Dong Hoi - Dong Ha 220kV transmission
line via two 220kV step-up substations
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Total
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
APPENDIX 3:
LIST OF WIND POWER PROJECTS TO BE ADDED TO PLANNING IN
SOUTH CENTRAL COAST REGION
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Project name
Capacity (MW)
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Province
Connection plan
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
1
7A
Wind Power
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Thuan Nam
Ninh Thuan
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
- In
normal operating mode (N-0)
- After
electrical grid works for release of RE capacity already added to the
planning are put into operation, especially 500kV Thuan Nam substation and Thuan
Nam - Vinh Tan 500kV transmission line
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2
Dam
Nai 4 Wind Power
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Thuan Bac
Ninh Thuan
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
3
Loi
Hai 2
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Thuan Bac
Ninh Thuan
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
4
Dam
Nai 3 Wind Power
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Thuan Bac
Ninh Thuan
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
5
Ninh
Thuan Wind Power Plant 5
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Ninh Phuoc
Ninh Thuan
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
6
Cong
Hai 1 Wind Power, phase 2
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Thuan Bac
Ninh Thuan
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
7
Phuoc
Huu – Duyen Hai 1 Wind Power
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Ninh Phuoc
Ninh Thuan
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
8
Vietnam
Power No. 1
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Thuan Nam
Ninh Thuan
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
9
BIM
Wind Power
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Thuan Nam
Ninh Thuan
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Total
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
LIST OF WIND POWER PROJECTS TO BE ADDED TO PLANNING IN
CENTRAL HIGHLANDS REGION
No.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Capacity (MW)
District
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Connection plan
Condition for capacity release
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
1
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
57
Ea H’leo
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Connected via single-circuit 110kV transmission line to
110kV Ea H’Leo substation; AC240 wire; 13 km long
- In
normal operating mode (N-0)
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Ea
Nam
400
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Dak Lak
Build a 500kV substation with a capacity of 450MVA for transit
connection to Pleiku - Di Linh 500kV transmission line
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
3
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
50
Dak Song
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
220kV transmission line transitionally connected to Dak
Nong – Buon Koup 220kV transmission line with a length of 2km and AC2x330
wire
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
4
Cuu
An
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
An Khe
Gia Lai
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Song
An
46.2
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Gia Lai
Song An 110kV wind power substation with a capacity of
2x52 MVA, transit connection to 01x An Khe - K’Bang single-circuit 110kV transmission
line
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
6
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
155
Kong Chro
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Build a 220kV step-up substation at Yang Trung wind power
plant for transit connection to Pleiku 2 - An Khe hydropower 220kV transmission
line (co-investing with Yang Trung Wind Power)
- In
normal operating mode (N-0)
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
- Raise
the capacity of 500kV Dak Nong substation and 500kV Pleiku 2 substation to
(2x900) MVA in 2021
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
7
Yang
Trung Wind Power
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Kong Chro
Gia Lai
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Hung
Hai Gia Lai
100
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Gia Lai
Transit connection to Pleiku 2 - An Khe hydropower 220kV transmission
line (switch the connection to Phuoc An)
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
9
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
50
Krong Buk
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Gathering capacity of Cu Ne 1,2 + Krong Buk 1, 2 wind
power plants to 22/220kV step-up substation of Krong Buk 2x125 MVA wind power
plant, transit connection to Krong Buk - Pleiku 2 220kV transmission line
- In
normal operating mode (N-0)
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
- Raise
the capacity of 500kV Dak Nong substation and 500kV Pleiku 2 substation to
(2x900) MVA in 2021
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
10
Cu
Ne 2
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Krong Buk
Dak Lak
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
11
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
50
Krong Buk
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Krong
Buk 2
50
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Dak Lak
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
13
Ia
Le Wind Power
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Chu Puh
Gia Lai
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Nhon
Hoa 1,2 Wind Power
100
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Gia Lai
Nhon Hoa 1 35/220kV wind power substation for transit
connection to 220kV single-circuit transmission line of Krong Buk – Pleiku 2
500kV transmission line
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
15
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
50
Dak Song
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
110kV double-circuit transmission line for transit
connection to Dak Mil - Dak Song 110kV transmission line using 0.5-km AC240
wire
- In
normal operating mode (N-0)
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Che
Bien Tay Nguyen Wind Power
50
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Gia Lai
Connected via 22kV transmission line to Phat Trien Mien
Nui (Mountainous Development) wind power plant
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
17
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
50
Chu Prong
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Transit connection to Dien Hong - Chu Se 110kV transmission
line; 5.2-km 2xAC185 wire
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
18
Ia
Pech
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Ia Grai
Gia Lai
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Ia
Pech 2
50
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Gia Lai
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
20
Ia
Pet Dak Doa
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Dak Doa
Gia Lai
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Kon
Plong
103.5
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Kon Tum
Kon Plong 20kV wind power step-up substation with a
capacity of 150 MVA-35/220kV, connected via 220kV double-circuit transmission
line using 19-km ACSR 330 wire for transit connection to Thuong Kon Tum -
Quang Ngai hydropower 220kV transmission line
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
22
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
50
Dak Glei
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Connected to Bo y 110kV substation
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
23
Dak
ND’rung 1
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Dak Song
Dak Nong
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Dak
ND’rung 2
100
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Dak
ND’rung 3
100
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Nam
Binh 1 Wind Power
30
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Dak Nong
Connect 110kV transmission line to Dak Hoa 220kV wind
power capacity-gathering substation for transit connection to Buon Kuop -
Dien Phan Nhom 220kV transmission line
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
27
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
50
Chu Prong
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Connected to 110kV Dien Hong substation via 110kV
single-circuit transmission line, around 30km long
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
28
Ia
Boong – Chu Prong
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Chu Prong
Gia Lai
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Total
2432.9
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
APPENDIX 5:
LIST OF WIND POWER PROJECTS TO BE ADDED TO PLANNING IN
MEKONG DELTA REGION
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Project name
Capacity (MW)
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Province
Connection plan
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
1
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
50
Dong Hai
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Gather the capacity to 220kV ECOTECH Dong Hai substation
for connection to 220kV busbar of 500kV Duyen Hai substation via 220kV
double-circuit transmission line
The connection
plan depends on the progress of 110 kV Hoa Binh switching station. It is
required to ensure 110 kV Hoa Binh switching station in synchronization with
the power source.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
2
Hoa
Binh 1 Wind Power - Phase 2
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Hoa Binh
Bac Lieu
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
- In
normal operating mode (N-0)
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Hoa
Binh 2 Wind Power
50
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Bac Lieu
Connected to 110 kV Hoa Binh switching station (at 220kV
Hoa Binh substation) via 110kV double-circuit transmission line
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
4
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
120
Hoa Binh
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
220kV double-circuit transmission line used together with
HCG Bac Lieu wind power plant cluster - Bypass Gia Rai – Bac Lieu 2 220kV transmission
line
Speed
up the construction of 220kV double-circuit transmission line for connection
to 220kV Bac Lieu substation and transit via Ca Mau thermal power - Soc Trang
220kV transmission line.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
5
Sunpro
Wind Power
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Binh Dai
Ben Tre
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
It
is necessary to separate Ben Tre 110kV - Ben Tre 220kV transmission line.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Thien
Phu Wind Power
30
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Ben Tre
Gathering capacity for connection to 110kV switching
station and to 110kV Binh Thanh substation via a 110kV double-circuit
transmission line
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
7
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
30
Thanh Phu
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
8
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
90
Thanh Phu
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Wind power No. 5 - Thach Hai 1, 2, 3, 4: 3x30+20 MW;
Phase 1 – Wind power No. 5 -Thanh Hai 1(V1-2: 30 MW) connected together with
V1-1 to Thanh Phu (Binh Thanh) 110kV substation via a 110kV double-circuit
transmission line using AC240 wire
Renovate
Mo Cay 220kV - Binh Thanh 110kV transmission line or build a new Ba Tri -
Binh Thanh 110kV transmission line
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
9
Hai
Phong transmission line
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Thanh Phu
Ben Tre
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
It
is necessary to construct a 220kV transmission line (50km in length). To
facilitate the operation, it is necessary to reduce generating capacity to
~200 MW.
Renovate
Ben Tre - My Tho 220kV transmission line by using superconducting wire
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
10
Thanh
Phu Wind Power
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Thanh Phu
Ben Tre
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
- Build
a Ben Tre 110kV - Ben Tre 220kV double-circuit transmission line with a
length of 0.24km and ACSR cross section of 2x240.
- Build
a Ba Tri – Giong Trom 110kV double-circuit transmission line with a length of
16km and ACSR cross section of 2x185.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
- Accelerate
construction of 220kV Binh Dai substation and a 220kV double-circuit
transmission line from 220 kV Binh Dai substation to Ben Tre (250 MVA; 2x50
km) from 2031 - 2035 to 2021 - 2025.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Nexif
Ben Tre – Phase 2, 3
50
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Ben Tre
Build a new 22/110kV substation: 63 MVA to approved 110
kV Nexif Ben Tra substation - Phase 1 (V1-1-30MW); connected together with
V1-1 to Binh Thanh 110kV substation
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
12
Bao
Thanh Wind Power
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Ba Tri
Ben Tre
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
13
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
50
Thua Duc
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Transmitted through 35kV single-circuit transmission line
to 35kV busbar of 35/220 kV substation of Ben Tre No. 20 Wind Power
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Ben
Tre No. 20 Wind Power
50
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Ben Tre
35/220kv substation: 2x63 MVA; a 220kV single-circuit
transmission line connected to 220kV Ben Tre substation for transmission of
the capacity of Wind Power Plants 19, 20
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
15
VPL
Ben Tre - Phase 2
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Binh Dai
Ben Tre
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Build
and renovate 110kV grid of Ben Tre Province:
- Build
a Ben Tre 110kV - Ben Tre 220kV double-circuit transmission line with a
length of 0.24km and ACSR cross section of 2x240.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
- Build
a 110 kV double-circuit transmission line from 220 kV Ben Tre substation to
220 kV My Tho substation with a length of 15 km and ACSR cross section of
2x240.
- Build
a 110 kV Giong Trom – Ben Tre double-circuit transmission line with a length
of 24 km and ACSR cross section of 2x185 (These works are yet to be added to
the planning)
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
16
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
49
Binh Dai
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
17
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
49
Binh Dai
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
18
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
100
Ngoc Hien
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Gather capacity to 110kV Khai Long wind power substation
(the connection point is at Khai Long wind power - Phase 1)
202kV
Nam Can substation and 220-110kV transmission line connected to the
substation
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
19
Khai
Long Wind Power – Phase 3
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Ngoc Hien
Ca Mau
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
20
Long
My 1
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Long My
Hau Giang
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
- In
normal operating mode (N-0).
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Soc
Trang 4 Wind Power
350
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Soc Trang
Connected to 220kV Vinh Chau substation via 220kV
double-circuit transmission line
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
22
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
200
Vinh Chau
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Connected to 220kV Vinh Chau substation via a 220kV
double-circuit transmission line
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Soc
Trang 16 Wind Power
40
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Soc Trang
Connected to 110kV busbar of 220kV Soc Trang substation
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
24
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
90
Vinh Chau
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Utilize the infrastructure for connection to Wind Power
No. 7 project - Phase 1 - 30MW (V1-3); install 2x 22/110kV transformers:
(2x63) MVA
220kV
Vinh Chau substation; Vinh Chau 110kV - Bac Lieu 220kV double-circuit
transmission line
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
25
Soc
Trang 11 Wind Power
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Cu Lao Dung
Soc Trang
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
- In
normal operating mode (N-0).
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Hoa
Dong 2 Wind Power
72
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Soc Trang
Transit connection via Vinh Chau - Soc Trang 220kV
single-circuit transmission line via a double-circuit line with a length of
about 1km
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
27
BCG
Soc Trang 1 Wind Power
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Vinh Chau
Soc Trang
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
28
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
50
Tran De
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
110kV single-circuit transmission line to 110kV Tran De
switching station with a length of 4km long and ACSR185 wire
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Song
Hau
50
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Soc Trang
110kV single-circuit transmission line to 110kV Tran De
switching station with a length of 4km long and ACSR185 wire
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
30
Nexif
Energy Wind Power
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Soc Trang
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
31
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
130
Vinh Chau
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Build a 220kV transmission line to connect it to 220kV
substation of Hoa Dong 2 wind power project via a 6-km 220kV single-circuit
transmission line using ACSR240 wire.
(Hoa Dong 2 wind power transitionally connected via Vinh
Chau - Long Phu 220kV transmission line.)
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
32
Dong
Thanh 1 Wind Power
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Duyen Hai
Tra Vinh
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
33
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
120
Duyen Hai
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
34
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
100
Duyen Hai
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Gather capacity to 220kV ECOTECH Dong Hai substation for
connection to 220kV busbar of 500 kV Duyen Hai substation via a 9-km 220kV
double-circuit transmission line using ACSR-2x330
Construct
and renovate 110kV grid of Ben Tre Province (4x110kV electrical grid works as
proposed to Ben Tre Province).
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
35
Thang
Long Wind Power
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Tra Vinh
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
36
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
150
Go Cong Dong
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Connected to the existing 110kV Go Cong substation via a
23-km double-circuit transmission line using ACSR185 wire
My
Tho 220kV - Go Cong - Can Duoc - Can Duoc 220kV 110kV double-circuit
transmission line, suspending 1 circuit in advance, with a length of 65km and
phased ACSR cross-section of 2x240 must be put into operation (SPC is
expected to energize this project by the end of 2020)
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
37
Vien
An Wind Power
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Ngoc Hien
Ca Mau
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
- In
normal operating mode (N-0).
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Total
3166.8
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
LIST OF WIND POWER PROJECTS TO BE ADDED TO PLANNING IN
SOUTHEAST REGION
No.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Capacity (MW)
District
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Connection plan
Condition for capacity release
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Cong
Ly Ba Ria - Vung Tau
102.6
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Ba Ria – Vung Tau
21.5-km 110 kV double-circuit transmission line connected
to 110kV Xuyen Moc substation
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.