THE PRIME MINISTER
-------
|
THE SOCIALIST REPUBLIC
OF VIETNAM
Independence - Freedom - Happiness
---------------
|
|
No.
609/QD-TTg
|
Hanoi,
April 25, 2014
|
DECISION
APPROVING
THE MASTER PLAN ON SOLID WASTE DISPOSAL OF HANOI CAPITAL TO 2030, WITH A VISION
TO 20501
THE PRIME MINISTER
Pursuant to
the December
25, 2001
Law on
Organization
of the
Government;
Pursuant to the November 26,
2003 Construction Law; Pursuant to the June 17, 2009 Law on Urban Planning;
Pursuant to the Government’s
Decree No. 59/2007/ND-CP of April 9, 2007, on solid waste management;
Pursuant to the Government’s
Decree No. 37/2010/ND-CP of April 7, 2010, on elaboration, appraisal, approval
and management of urban planning;
Considering the proposal of the
chairperson of the Hanoi People’s Committee and appraisal opinions of the
Ministry of Construction,
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Article 1. To approve the Master Plan on solid waste disposal of Hanoi capital
to 2030, with a vision to 2050, with the following major contents:
1. Scope of study and planning:
The entire administrative
territory of Hanoi capital with a total area of 3,344.6 km2.
2. Planning viewpoints:
- Conformity with the master plan
on socio-economic development; the land use master plan; the master plan on
construction of Hanoi capital to 2030, with a vision to 2050; the national
strategy for integrated management of solid waste to 2025, with a vision to
2050, and other relevant specialized master plans approved by competent
authorities.
- Conformity with topographical,
geological and hydrological conditions and the capacity to exploit the land
fund.
- Reduction of solid waste at
source, increase of re-use and recycling to reduce the volume of solid waste to
be buried; catering to the city’s demands for solid waste collection,
transportation and disposal in each period.
- Sorting of solid waste at
source. Waste collection and disposal with advanced and appropriate
technologies. Restriction of burial in order to save land resources and
mitigate environmental pollution. Lawful collection and disposal of hazardous
solid waste without dispersion into the environment.
- Encouragement of all economic
sectors to make construction investment and participate in solid waste
collection, transportation and disposal activities.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
- To concretize orientations for
solid waste disposal planning of Hanoi capital under the master plan on
construction of Hanoi capital to 2030, with a vision to 2050 approved by the
Prime Minister.
- To project the total volume of
generated solid waste and solid waste disposal demands, to determine modes of
solid waste collection, transportation and disposal; to identify locations and
sizes of solid waste transfer stations and disposal complexes in Hanoi capital.
- To provide a basis for the
implementation of investment projects to build, upgrade, improve or expand the
collection and transportation systems and solid waste transfer stations and
disposal complexes in Hanoi capital.
4. Solid waste disposal planning
standards:
Based on current standards and
regulations, a number of basic planning targets are as follows:
Solid waste collection targets:
- Daily-life solid waste:
+ In 2020: The collection rate
will reach 85-100% in urban areas and 70-80% in rural areas;
+ In 2030: The collection rate
will reach 90-100% in urban areas and 80-95% in rural areas.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
+ In 2020: The collection rate
will reach 80-100% in urban areas and 60-80% in rural areas;
+ In 2030: The collection rate
will reach 85-100% in urban areas and 70-90% in rural areas.
- Industrial solid waste:
+ In 2020, the collection rate
will reach 80-90%;
+ In 2030, the collection rate
will reach 100%.
- Medical solid waste:
The collection rate will reach
100%, including around 20% for hazardous solid waste and around 80% for
ordinary solid waste.
- Septic tank sludge:
+ In 2020: The collection rate
will reach 85-100% in urban areas and 65-85% in rural areas;
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
- Wastewater mud: The collection
rate will reach 100%.
5. Projection of planning demand
a/ Projected waste volume
No.
Type of solid waste (SW)
In 2020 (ton/day)
In 2030 (ton/day)
In 2050 (ton/day)
1
Daily-life SW
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
11,300
15,900
2
Construction
SW
2,100
3,400
4,800
3
Industrial
SW
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
1,900
1,900
4
Medical
SW
90
150
280
5
Septic tank sludge
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
1,800
2,100
6
Wastewater mud
260
350
400
Total
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
18,900
25,380
b/ Projected land use demand
No.
Item
Current
area
In 2020 (ha)
In 2030 (ha)
In 2050 (ha)
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
Disposal complexes
130.15
253.65
422.65
515.95
2
Construction waste disposal sites and wastewater mud
landfills
27
74
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
409
Total
157.15
327.65
580.65
924.95
6. Planning contents:
a/ Zoning off of solid waste
disposal:
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
+ To form disposal complexes with
appropriate sizes meeting short- and long-term demands.
+ Reasonable transportation
distances and routes with limited running through urban centers.
+ To combine with transport
planning orientations under the master plan on construction of Hanoi capital to
2030, with a vision to 2050.
- Zoning-off contents
+ Zone I- Northern part: Covering
the historical inner city area, urban districts (South Tu Liem, North Tu Liem,
Long Bien and part of Thanh Tri district) and rural districts (Me Linh, Dong
Anh, Gia Lam, Soc Son) with a total area of around 1,150 km2.
+ Zone II- Southern part: Covering
part of Thanh Tri district, part of Ha Dong district, and rural districts (Phu
Xuyen, Thuong Tin, Thanh Oai, Ung Hoa and My Duc) with a total area of around
990 km2.
+ Zone III- Western part: Covering
part of Ha Dong district, districts (Dan Phuong, Hoai Duc, Phuc Tho, Quoc Oai,
Ba Vi, Thach That, Chuong My) and inner and outer areas of Son Tay town, with a
total area of 1,204.6 km2.
b/ Solid waste sorting, collection
and transportation
- Sorting:
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
+ Industrial solid waste shall be
sorted into 2 types (hazardous and ordinary industrial solid waste).
+ Medical solid waste shall be
sorted into 2 types (hazardous and ordinary medical solid waste). Ordinary
medical solid waste shall be further sorted like daily-life solid waste.
- Solid waste collection and
transportation:
+ Daily-life solid waste, ordinary
industrial solid waste and ordinary medical solid waste shall be collected from
their sources to solid waste transfer stations and then to solid waste disposal
complexes under planning of each zone.
+ Solid waste from craft villages
shall be collected and transported from their places of gathering in craft
villages to solid waste disposal complexes under planning.
+ Solid waste in rural areas shall
be collected and transported daily or every two days to solid waste grounds of
hamlets and villages and transported to solid waste disposal complexes under
planning (unplanned unhygienic landfills in rural areas shall be closed according
to the investment roadmap to build solid waste disposal complexes of the city).
+ Construction solid waste:
Investors shall sign contracts with professional units for collection and
transportation to solid waste disposal sites which are built under planning and
meet environmental safety and sanitation requirements.
+ Specialized units shall collect
septic tank sludge from waste sources and transport it to solid waste disposal
complexes under planning.
+ Specialized units shall collect
wastewater mud from waste sources and transport it to waste mud landfills under
planning.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
- Solid waste transfer stations
The volume of solid waste to be
collected and transported to transfer stations with technical infrastructure
serving Hanoi city is estimated at 6,700 -10,200 tons/day and 5 transfer
stations are planned in 3 zones:
+ Zone I: The volume of solid
waste is estimated at 4,600-7,700 tons/day, the scope of service of solid waste
collection and transportation routes and transfer stations is as follows:
. Thanh Lam transfer station, Me
Linh district: 1.5 ha, receiving 750-1,000 tons of solid waste/day and around
350 tons of industrial solid waste/day from Dong Anh and Me Linh districts and
Kim Hoa township.
. Tay Mo transfer station, South
Tu Liem district: 1.5 ha, receiving 850-1,000 tons/day from Cau Giay, South Tu
Liem, North Tu Liem and Thanh Xuan districts.
. Small- and medium-sized transfer
stations serving inner city areas, receiving 2,500-3,000 tons/day. The
locations of these transfer stations will be identified in the zoning or
detailed planning.
. Waste in areas in the
neighborhood of disposal complexes may be collected and transported to disposal
complexes in Zone I.
+ Zone II: The volume of solid
waste to be received is estimated at around 1,000 tons/day, the scope of
service of solid waste collection and transportation routes and transfer
stations is as follows:
. Ta Thanh Oai transfer station,
Thanh Tri district: 1.5 ha, receiving around 800-1,000 tons/day from Ha Dong,
Thanh Tri and Thanh Oai districts.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
+ Zone III: The volume of solid
waste to be received is estimated at around 1,300-1,500 tons/day. The scope of
service of solid waste collection and transportation routes and transfer stations
is as follows:
. Quoc Oai transfer station, Quoc
Oai district: 1.5 ha, receiving around 500-700 tons/day from part of Ha Dong
district and Hoai Duc and Quoc Oai districts.
. Chuc Son transfer station,
Chuong My district: 1.5 ha, receiving around 500-700 tons/day from Chuong My
district and part of Hoai Duc district.
. Waste in areas close to disposal
complexes may be collected and transported to disposal complexes in Zone III.
c/ Planning of solid waste
disposal complexes:
Under the planning of solid waste
disposal complexes, Hanoi capital will have 17 solid waste disposal complexes,
including 8 existing zones to be upgraded and expanded and 9 new ones, which
will be zoned off as follows:
* Zone I: To have 5 solid waste
disposal complexes
- Soc Son solid waste disposal
complex (currently operating, to be expanded)
+ Location: In Nam Son, Bac Son
and Hong Ky communes, Soc Son district.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
+ Capacity: Around 4,500 tons/day
by 2020; around 6,000 tons/day by 2030; and around 7,000 tons/day by 2050.
+ Function: To dispose of
daily-life solid waste, septic tank sludge, and ordinary and hazardous
industrial solid waste and medical solid waste.
+ Technology:
. Recycling of plastic, paper,
iron, steel, etc.
. Bio-technology turning organic
solid waste into bio-fertilizer.
. Burning combined with energy
recovery.
. Hygienic burial with energy
recovery.
+ Scope of service: Inner city
areas, urban districts (South Tu Liem, North Tu Liem) and rural districts (Soc
Son, Dong Anh, Me Linh, Thanh Tri). Particularly for industrial solid waste,
inter-provincial service (Vinh Phuc, Bac Ninh and Hung Yen provinces).
- Viet Hung solid waste disposal
complex (currently operating)
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
+ Existing area: 8.75 ha.
+ Capacity: Around 300 tons/day by
2020; around 600 tons/day by 2030; and around 600 tons/day by 2050.
+ Function: To dispose of
daily-life solid waste and ordinary industrial solid waste.
+ Technology:
. Recycling of plastic, paper,
iron, steel, etc.
. Bio-technology turning organic
solid waste into bio-fertilizer.
. Burning combined with energy
recovery.
+ Scope of service: Dong Anh
district and supporting Soc Son disposal complex in disposing of daily-life
solid waste and ordinary industrial solid waste.
- Kieu Ky solid waste disposal
complex (currently operating)
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
+ Existing area: 14 ha.
+ Capacity: Around 550 tons/day by
2030; and around 1,000 tons/day by 2050 (when the burning plant is built).
+ Function: To dispose of
daily-life solid waste and septic tank sludge.
+ Technology:
. Hygienic burial with energy
recovery (which will stop by 2020).
. Recycling of plastic, paper,
iron, steel, etc.
. Bio-technology turning organic
solid waste into bio-fertilizer.
+ Scope of service: Long Bien and
Gia Lam districts.
- Phu Dong solid waste disposal
complex (new construction)
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
+ Area: 7.5 ha by 2020, 12.5 ha by
2030; and 20 ha by 2050.
+ Capacity: Around 550 tons/day by
2020; around 850 tons/day by 2030; and around 1,200 tons/day by 2050.
+ Function: To dispose of
daily-life solid waste and septic tank sludge.
+ Technology:
. Recycling of plastic, paper,
iron, steel, etc.
. Bio-technology turning organic
solid waste into bio-fertilizer.
. Burning combined with energy
recovery.
. Hygienic burial with energy
recovery.
+ Scope of service: Long Bien and
Gia Lam districts. When necessary, to provide support for Soc Son and Viet Hung
solid waste disposal complexes.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
+ Location: Cau Dien township, Tu
Liem district.
+ Area: 3.9 ha without expansion.
+ Capacity: Around 300 tons/day.
+ Currently being a plant treating
organic solid waste into compost fertilizer and burning hazardous medical solid
waste.
+ Function: To dispose of
daily-life solid waste, septic tank sludge and hazardous medical solid waste.
+ Technology:
. Bio-technology turning organic
solid waste into bio-fertilizer.
. Burning hazardous medical solid
waste.
+ Scope of service: Inner-city
areas.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
- Chau Can solid waste disposal
complex (new construction)
+ Location: Chau Can commune, Phu
Xuyen district.
+ Area: 7.5 ha by 2020, 13 ha by
2030; and around 20 ha by 2050.
+ Capacity: Around 450 tons/day by
2020; around 800 tons/day by 2030; and around 1,000 tons/day by 2050.
+ Function: To dispose of
daily-life solid waste, septic tank sludge and ordinary medical solid waste.
+ Technology:
. Recycling of plastic, paper,
iron, steel, etc.
. Bio-technology turning organic
solid waste into bio-fertilizer.
. Burning combined with energy
recovery.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
+ Scope of service: Thuong Tin and
Phu Xuyen districts and part of Thanh Tri district.
- Cao Duong solid waste disposal
complex (new construction)
+ Location: Cao Duong commune,
Thanh Oai district.
+ Area: 6 ha by 2020, 9 ha by
2030; and 15 ha by 2050.
+ Expected capacity: Around 400
tons/day by 2020; around 500 tons/day by 2030; and around 750 tons/day by 2050.
+ Function: To dispose of
daily-life solid waste and septic tank sludge.
+ Technology:
. Recycling of plastic, paper,
iron, steel, etc.
. Bio-technology turning organic
solid waste into bio-fertilizer.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
. Hygienic burial with energy
recovery.
+ Scope of service: Thanh Oai and
Ung Hoa districts and part of Thanh Tri and Thuong Tin districts.
- Hop Thanh solid waste disposal
complex (new construction)
+ Location: Hop Thanh commune, My
Duc district.
+ Area: 2 ha by 2020, 6 ha by
2030; and around 13 ha by 2050.
+ Expected capacity: Around 150
tons/day by 2020; around 450 tons/day by 2030; and around 850 tons/day by 2050.
+ Function: To dispose of
daily-life solid waste and septic tank sludge.
+ Technology:
. Recycling of plastic, paper,
iron, steel, etc.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
. Burning combined with energy
recovery.
+ Scope of service: My Duc
district and its neighborhood.
- My Thanh solid waste disposal
complex (new construction)
+ Location: My Thanh commune, My
Duc district.
+ Area: 1 ha by 2020, 2.5 ha by
2030; and 5 ha by 2050.
+ Expected capacity: Around 1000
tons/day.
+ Function: To dispose of
daily-life solid waste and septic tank sludge.
+ Technology: Hygienic burial with
energy recovery.
+ Scope of service: My Duc
district and its neighborhood.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
+ Location: Van Dinh and Lien Bat
communes, Ung Hoa district.
+ Area: currently 3 ha, to be
expanded to 5 ha by 2030; and 7 ha by 2050.
+ Expected capacity: Around 150-200
tons/day.
+ Function: To dispose of
daily-life solid waste and septic tank sludge.
+ Technology:
. Recycling of plastic, paper,
iron, steel, etc.
. Hygienic burial with energy
recovery.
. Burning combined with energy
recovery.
+ Scope of service: Ung Hoa
district.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
+ Location: Dong Lo commune, Ung
Hoa district.
+ Area: currently 2 ha, to be
expanded to 2.5 ha by 2030; and 5 ha by 2050.
+ Expected capacity: Around
150-200 tons/day.
+ Function: To dispose of
daily-life solid waste and septic tank sludge.
+ Technology:
. Recycling of plastic, paper,
iron, steel, etc.
. Bio-technology turning organic
solid waste into bio-fertilizer.
. Burning combined with energy
recovery.
. Hygienic burial with energy
recovery.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
* Zone III: To have 6 solid waste
disposal complexes
- Xuan Son solid waste disposal
complex (currently operating, to be expanded)
+ Location: Son Tay town and Ba Vi
district.
+ Area: Currently 13 ha, to be
expanded to 26 ha by 2020; 57 ha by 2030; and 73.5 ha by 2050.
+ Capacity: Around 700 tons/day by
2020; around 1,600 tons/day by 2030; and around 2,500 tons/day by 2050.
+ Function: To dispose of
daily-life solid waste and septic tank sludge.
+ Technology:
. Recycling of plastic, paper,
iron, steel, etc.
. Bio-technology turning organic
solid waste into bio-fertilizer.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
. Hygienic burial with energy
recovery.
+ Scope of service: Son Tay town,
Dan Phuong, Hoai Duc, Phuc Tho, Quoc Oai, Ba Vi, Thach That and Chuong My
districts and part of Ha Dong district.
- Dan Phuong solid waste disposal
complex (new construction)
+ Location: Phuong Dinh commune,
Dan Phuong district.
+ Area: 2 ha by 2020; 5 ha by
2030; and 5 ha by 2050.
+ Capacity: 150-300 tons/day.
+ Function: To dispose of
daily-life solid waste.
+ Technology:
. Recycling of plastic, paper,
iron, steel, etc.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
+ Scope of service: Dan Phuong and
Phuc Tho districts.
- Thoong Mountain solid waste
disposal complex (currently operating, to be expanded)
+ Location: Tan Tien commune,
Chuong My district.
+ Area: currently 2 ha, to be
expanded to 3 ha by 2020; 7.5 ha by 2030; and 10 ha by 2050.
+ Capacity: Around 200 tons/day by
2020; around 450 tons/day by 2030; and around 450 tons/day by 2050.
+ Function: To dispose of
daily-life solid waste and septic tank sludge.
+ Technology:
. Recycling of plastic, paper,
iron, steel, etc.
. Bio-technology turning organic
solid waste into bio-fertilizer.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
. Hygienic burial with energy
recovery.
+ Scope of service: Part of Ha
Dong district, Chuong My and Quoc Oai districts, and supporting Xuan Son disposal
complex in disposing of solid waste.
- Lai Thuong solid waste disposal
complex (new construction)
+ Location: Lai Thuong commune,
Thach That district.
+ Area: 4 ha by 2020; 6 ha by
2030; and 11.8 ha by 2050.
+ Capacity: Around 300 tons/day by
2020; around 450 tons/day by 2030; and around 700 tons/day by 2050.
+ Function: To dispose of
daily-life solid waste and septic tank sludge.
+ Technology:
. Recycling of plastic, paper,
iron, steel, etc.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
. Burning combined with energy
recovery.
+ Scope of service: Thach That
district, and supporting Xuan Son disposal complex in disposing of solid waste.
- Dong Ke solid waste disposal
complex (new construction)
+ Location: Dong Ke commune,
Chuong My district.
+ Area: 5 ha by 2020; 11 ha by
2030; and 21 ha by 2050.
+ Expected capacity: Around 350
tons/day by 2020; around 600 tons/day by 2030; and around 1,200 tons/day by
2050.
+ Function: To dispose of daily-life
solid waste, septic tank sludge and ordinary medical solid waste.
+ Technology:
. Recycling of plastic, paper,
iron, steel, etc.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
. Burning combined with energy
recovery.
. Hygienic burial with energy
recovery.
+ Scope of service: Chuong My,
Quoc Oai and Hoai Duc districts and part of Ha Dong district.
- Tay Dang solid waste disposal
complex (new construction)
+ Location: Tay Dang township, Ba
Vi district.
+ Area: 1 ha by 2020; 2 ha by 2030;
and 3 ha by 2050.
+ Burying capacity: Around 100
tons/day.
+ Function: To dispose of
daily-life solid waste.
+ Technology:
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
+ Scope of service: Tay Dang
township.
In addition, under the overall
planning and zoning planning of Hanoi capital, there will be Tien Son solid
waste disposal complex in Luong Son district, Hoa Binh province, with an area
of around 200 ha which will help dispose of industrial solid waste (ordinary
and hazardous) for Hanoi capital.
d/ Planning of construction solid
waste disposal sites and wastewater mud landfills:
To plan 26 construction solid
waste disposal sites with a total area of 39 ha by 2020 and 108 ha by 2030 and
3 wastewater mud landfills with a total area of 8 ha by 2020 and 23 ha by 2030
as follows:
7. Solid waste disposal technology
+ Solid waste disposal
technologies shall be selected suitable to socio - economic conditions and
based on the sorting capacity and properties and compositions of solid waste.
+ Recycling technology must
produce products meeting market demands.
+ Domestic energy-efficient and
environment-friendly technologies shall be prioritized.
+ Technologies for disposing of
ordinary solid waste include bio- fertilizer processing, burning with energy
recovery, recycling, hygienic burial, etc.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
8. Projects proposed for
investment priority up to 2020:
a/ Zone I: Northern part:
- Expansion of Soc Son disposal
complex, Soc Son district.
- Construction of Tay Mo transfer
station, Tu Liem district.
- Construction of Tien Thang
construction solid waste disposal site, Me Linh district.
- Construction of Duc Tu
construction solid waste disposal site, Dong Anh district.
b/ Zone II: Southern part:
- Construction of Chau Can
disposal complex, Phu Xuyen district.
- Construction of Chuong Duong
construction solid waste disposal site, Thuong Tin district.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
- Construction of a wastewater mud
landfill in Chuong Duong commune, Thuong Tin district.
c/ Zone III: Western part:
- Expansion of Xuan Son disposal
complex, Son Tay town.
- Construction of Dong Ke disposal
complex, Chuong My district.
- Construction of Van Con
construction solid waste disposal site, Hoai Duc district.
- Construction of An Thuong
construction solid waste disposal site, Hoai Duc district.
- Construction of Trung Chau
construction solid waste disposal site, Dan Phuong district.
9. General cost estimation and
investment capital sources:
a/ General estimation of
investment cost:
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
b/ Investment capital sources:
- State budget funds.
- ODA loans, foreign capital.
- Investment credit capital.
- Domestic commercial loans.
- Capital from domestic and
overseas investors.
- Other lawful capital sources.
10. Strategic environmental
assessment:
a/ Positive environmental impact:
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
- To build solid waste disposal
complexes and apply appropriate technologies to thoroughly dispose of solid
waste; to limit and remove unhygienic solid waste gathering points and
landfills in order to reduce pollution and improve the environment for Hanoi
capital.
- To contribute to protect public
health and sustainable development of urban areas and industrial zones in Hanoi
capital.
b/ Projected environmental impacts
upon implementation of the master plan:
- Operations of vehicles
transporting solid waste will be likely to cause air and noise pollution, or
affect traffic safety, etc.
- The construction of solid waste
disposal complexes will cause environmental impacts and affect the community.
- The operation of disposal
complexes will be likely to cause noise, dust and environmental pollution.
- Transportation activities at
gathering points, transfer stations and the operation of solid waste disposal
complexes will be likely to cause environmental incidents (dispersion of
hazardous gas, hazardous substances, discharge of wastewater into the
environment, etc.) or cause environmental pollution if the operation process
fails to comply with environmental regulations and standards.
c/ Solutions for mitigation of
environmental impacts:
- Solutions which use advanced and
appropriate technologies and ensure solid waste disposal according to
environmental standards and technical regulations.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
- To elaborate and strictly
implement regulations on solid waste collection and transportation and
operation of solid waste disposal complexes.
- Upon project implementation, to
assess environmental impacts and take other support measures.
- To take measures to collect and
treat emitted gas, wastewater, smoke and dust from disposal complexes, solid
waste landfills and reduction measures according to the approved environmental
impact assessment.
- To elaborate plans and programs
on observation of the quality of the air, surface water, groundwater and soil
environments.
- To warn environmental incidents
and propose solutions for prevention, control and mitigation of adverse impacts
on the environment.
- To build capacity to manage and
operate solid waste disposal complexes.
Article 2. Organization of implementation
1. The Hanoi People’s Committee:
- To organize the implementation
of the Master Plan on solid waste disposal of Hanoi capital to 2030, with a
vision to 2050.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
- To elaborate financial plans
corresponding to investment plans to develop the system of solid waste
collection, transportation and disposal for each period; to develop mechanisms
and policies to raise funds for the implementation of this master plan,
encouraging economic sectors to make construction investment and participate in
solid waste management in Hanoi.
- To review and make land use
plans for solid waste disposal facilities.
- To direct and organize the
uniform implementation of projects from at- source sorting, collection and
transportation to construction solid waste disposal complexes in the locality
under approved planning.
- To develop programs to raise
public awareness about environmental sanitation and sorting of solid waste at
source in urban areas, to be expanded to rural areas.
- To complete the organizational
structure and management of solid waste collection, transportation and
disposal; to develop appropriate models of solid waste disposal businesses in
Hanoi capital.
2. Related ministries and sectors:
- To coordinate with the Hanoi
People’s Committee in supervising and inspecting the exploitation, management
and use of solid waste disposal facilities.
- Based on their assigned
functions and tasks, to coordinate with the Hanoi People’s Committee in
implementing the Master Plan.
Article 3. This Decision takes effect on the date of its signing.
...
...
...
Please sign up or sign in to your Pro Membership to see English documents.
FOR THE PRIME MINISTER
DEPUTY PRIME MINISTER
Hoang Trung Hai