THE MINISTRY OF
INDUSTRY AND TRADE
--------
|
SOCIALIST
REPUBLIC OF VIET NAM
Independence-Freedom-Happiness
-----------
|
No. 11/2013/TT-BCT
|
Hanoi, June 18,
2013
|
CIRCULAR
PROMULGATING THE NATIONAL
TECHNICAL REGULATION ON DESIGN REQUIREMENTS FOR FILLING STATION
Pursuant to the
Government’s Decree No. 95/2012/ND-CP dated November 12, 2012, defining the
functions, tasks, powers and organizational structure of the Ministry of
Industry and Trade;
Pursuant to the Law
on standards and technical regulations dated June 29, 2006;
Pursuant to the
Government’s Decree No. 127/2007/ND-CP dated August 01, 2007, detailing
implementation of a number of Articles of the Law on standards and
technical regulations;
At the proposal of
Director of Science and Technology Department, the Minister of Industry and
Trade promulgates National Technical Regulation on design requirements for
filling station.
Article
1. To promulgate
together with this Circular “the national technical regulation on design
requirements for filling station”. With code of QCVN 01 : 2013/BCT.
Article
2. Effect
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Article
3. Implementation responsibilities
1. The Department of
Science and Technology shall organize implementation of this Circular
nationwide.
2. The Departments of
Industry and Trade in provinces and central-affiliated cities shall guide,
inspect implementation of this Circular in their localities and report
implementation of this Circular to the Ministry of Industry and Trade as
prescribed.
3. The Chief of
Ministerial office, the Chief Inspector of Ministry, Directors, General
Directors, Directors under the Ministry, Directors of provincial Department of
Industry and Trade, heads of concerned agencies, organizations and
individuals shall implement this Circular.
FOR THE MINISTER OF INDUSTRY AND TRADE
DEPUTY MINISTER
Nguyen Cam Tu
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
NATIONAL
TECHNICAL REGULATION
ON DESIGN REQUIREMENTS FOR
FILLING STATIONS
Foreword:
QCVN 01 : 2013/BC is
compiled by the Board of compiling national technical regulation on design
regulation for filling stations, submitted for approval by the Department of
Science And Technology under the Ministry of Industry and Trade, appraised by
the Ministry of Science and Technology and promulgated by the Minister of
Industry and Trade together with the Circular No. 11/2013/TT-BCT, dated June
18, 2013.
NATIONAL TECHNICAL REGULATION
ON DESIGN REQUIREMENTS FOR FILLING STATIONS
Chapter
I
GENERAL
PROVISIONS
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
This regulation
provides for basic technical requirements in design for new construction,
upgrading and expansion of filling station.
The floated
petrol-filling stations are not subjects regulated by this regulation.
Article
2. Subjects of application
This Regulation
applies to agencies, organizations and individuals involving construction
newly, upgrading and extension of filling stations on Vietnam’s territory.
Article
3. Interpretation of terms
In this regulation,
the following terms are construed as follows:
1. Filling stations
Being construction
facilities specialized in retail trading of petrol and oil, lubricants of all
kinds, may combine with trading of bottled liquefied petroleum gas or supplying
utility services for persons and means of transport.
2. Utility services
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
3. Goods sale area
Place arranged petrol
pumps and stalls (sale of lubricants, bottled liquefied petroleum gas…).
4. Other
construction items
Include items
providing convenience services, room for guarding, hygiene area, location to
place generator, and so on.
5. Pump island
Being area used
exclusively for installment of petrol pump and being lifted higher than
premises of store.
6. Technological
pipeline
Being pipeline
(including pipes and connectors) with equipments installed on pipeline for transporting
petrol and oil and vapor of petrol and oil.
Technological pipeline
include: Incoming-pipeline (for transporting petrol and oil from petrol and oil
means of transport into tanks), closely- incoming adaptor and lid of pipeline (equipment fixed at the head of
incoming-pipeline used to connect closely with pipe for transporting petrol and
oil from means of transport into tanks), going-pipeline (for transporting
petrol and oil from tank to petrol pumps) and pipes for vapor (for transporting
vapor of petrol and oil from tanks to breather valve or from tanks to petrol
and oil means of transport).
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Equipment for control
of excess pressure and vacuum pressure in tank so as to ensure safety for tank
and anti losses due to evaporation during operation. Breather valve must have
grid to prevent fire from spreading out from outside into tanks containing
petrol and oil.
8. Closely incoming
Being method to put
petrol and oil from petrol and oil means of transport into tanks according to a
close cycle through closely-incoming adaptor and lid.
9. Sewage of
filling stations
Being sewage during
operation of filling stations includes:
a) Sewage contaminated
petrol and oil (for petrol and oil station with services of vehicle washing,
vehicle maintenance): water from vehicle washing, water for sanitation of
ground of area for vehicle washing, vehicle maintenance.
b) Sewage from life
activities not contaminated petrol and oil.
10. Vapor
recovery system
Being equipment system
with the aim to recover and limit exhalation into air when putting petrol and
oil into tank at filling station.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
a) TCVN 4090:1985 Main
pipeline for transporting of oil and oil products – Design Standard
b) TCVN 5334:2007 Electrical
apparatus for petroleum and petroleum products terminal - Requirements on
safety in design, installation and operation.
c) TCVN 3890:2009 Fire
protection equipments for construction and building – Providing, installation,
inspection and maintenance.
d) TCVN 6223:2011 Liquefied
petroleum gas (LPG) store Safety Requirements.
Chapter
II
TECHNICAL
PROVISIONS
Article
5. Decentralization of filling stations
Filling stations are
decentralized according to total capacity containing petrol and oil as
prescribed in Table 1.
Table 1. Decentralization of filling stations
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Total capacity
(m3)
1
Between 151 and
210
2
Between 101 and
150
3
Less than or
equal 100
Article
6. General requirements
1. Position for construction of filling station must be suitable
with planning, ensure requirements on traffic safety, fire prevention safety
and environment sanitation. Architecture of filling stations must be suitable
with requirements of urban architecture.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
a) Width of a lane in
parking is not less than 3.5m. Road for two lanes is not less than 6.5m.
b) Parking for
ex-warehousing and warehousing petrol and oil is not permitted to cover by materials
with asphalt.
3. Filling station adjacent to other construction works must
have wall surrounding with height not less than 2.2m made of non-burn
materials. For items of civil construction works and other construction works
outside of store (excluding production place which generate ignition or spark and public facilities) at fire
resistant level I, II, if face of wall toward filling station is fire-resistant
wall, it is not required for safe distance from that item to hence wall of
filling station but the current regulations on construction must be complied.
4. Structure and material for goods sale areas and other
construction item must have fire-resistant level I, II as prescribed in QCVN
06:2010/BXD National technical Regulation on Fire Safety of Buildings.
5. Area for placing petrol pumps, in case of having overhangs
for goods sale, structure and material of overhangs must be at the
fire-resistant level I, II as prescribed in QCVN 06:2010/BXD National technical
Regulation on Fire Safety of Buildings. Height of overhangs for goods sale is
not lower than 4.75m.
6. In case of having stalls for sale of bottled liquefied
petroleum gas in area of stalls, regulation on safety requirements at
TCVN 6223:2011 Liquefied petroleum gas (LPG) store Safety Requirements
must be complied.
7. Distance between construction items in filling stations is
not less than provision in Table 2
Table 2 – Minimum distance between construction items in
stores
Unit calculated by meter
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Underground tanks
Pump
Stall
1. Underground tanks
0.5
Not provided
2
2. Closely-incoming adaptor
and lid
Not provided
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
3
3. Pump
Not provided
Not provided
Not provided
4. Other
construction items
2
2
2
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
1) Not provided for
safety distance between tanks with stalls at walls without windows or doors.
2) Not provided for
safety distance between pumps with walls but it is required to ensure
convenience for installment, manipulations and repair.
Article
7. Decentralization of hazardous zones
Decentralization of
hazardous zones regarding fire and explosion for works items at filling
stations is prescribed in Table 3.
Table 3. Decentralization of hazardous zones regarding fire
and explosion
Name of works items
Level of hazardous zone
1. Areas containing
and trading petrol and oil:
- Tanks, incoming
adaptor and lid, pit
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- Petrol pump
- Petrol pump when
selling goods for means of transports
- Cistern cars when
putting goods enter petrol stores
Pictures 2,3,4
Pictures 5,6
Picture 7
Picture 8
Pictures 9,10
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- Warehouses contain
liquefied petroleum gas
- Warehouses contain
lubricant
Z1
Z2
3. Other construction
items:
Non-hazardous zone
Note: Definitions of
hazardous zones regarding fire and explosion, details of drawings on
decentralization of hazardous zones regarding fire and explosion are seen in Annex
I promulgated together with this Regulation.
Article
8. Tanks contain petrol and oil
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
2. Installment of petrol tanks at stores must comply with the
following conditions:
a) Not to install
petrol tanks floating on ground.
b) Not to install
petrol tanks and pits in or under stalls.
c) When installing
petrol tanks, it is required to calculate ability to be push floating and must
have measures to prevent floating of tanks.
d) Surrounding tanks
must cover sand or fine soil with the thickness of not less than 0.3 m.
dd) Tanks installed
under roads must apply measures to protect tank structure.
e) For tanks made of
non-conductive material materials must have measure to annul electrostatic when
ex-warehousing or warehousing petrol and oil.
3. The outside surface of steel tanks installed underground
must have an anti-corrosion layer with level not lower than the intensifying level
prescribed in TCVN 4090:1985 Main pipelines for transporting of oil and oil
products – Design Standard.
4. The safe distances from tanks to facilities outside of
stores are prescribed in Table 4.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
1. Position to install petrol pumps in filling stations must
be suitable with the following requirements:
a) Pumps must be laid
in aeration positions. If pumps are laid in house, they must be laid in
separate space, together with measures of air ventilation and open doors turned
outside.
b) To ensure that
vehicles may stop easily along pumps and not obstruct other means of transport
to go in and out stores.
2. Pumps must be laid on pump islands. Pump island must be
designed in conformity with the following requirements:
a) The height must be
higher than premises of parking not less than 0.2m.
b) The width is not
less than 1.0m.
c) Pump island’s head
must be far than edges of polar bearing overhangs or pump not less than 0.5m.
3. The safe distances from pumps to facilities outside of
stores are prescribed in Table 4.
Table 4 - The safe distances from tanks and pumps to
facilities outside of stores
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Construction items
Safe distance
{not less than (2), (3)}
Store level 1
Store level 2
Store level 3
Production place
generating ignition or spark
18
18
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Public facilities
(4)
50
50
50
Civil constructions
and other construction works outside of store (5)
Fire-resistant level
(1)
I, II
5
5
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
III
15
12
10
IV; V
20
14
14
Electric cable
line
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
- According to
current regulations on safe corridor for Power grid
- According to
current telecommunication regulations.
Note:
1) The fire-resistance
level of facilities under QCVN 06:2010/BXD National Technical Regulation on
Fire Safety of Buildings.
2) Distance to tank
calculated from edge of tank.
3) Distance to pump
calculated from center of pump.
4) Distance to
public facilities calculated up to boundary of facilities.
Public facilities
include: Schools, hospitals, centers of national exhibition and shopping
malls.
5) Distance to civil
facilities calculated up to the foot of facilities.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
b) Safe distance from
tank and pump to public facilities may be reduced to 25 meter (17 meter if
filling station has vapor recovery system) if filling station is
equipped fixed or semi-fixed
fire prevention system.
Article
10. Technological pipeline
1. Technological pipeline in filling station must be
manufactured from petrol-resistant and non-combustible materials. Inside
diameter of pipe is not less than 32 mm. For steel pipeline, it is required to
have protective measure to prevent corrosion. For pipelines made of
non-conductive materials, it is required to include measures to annul
electrostatic during ex-warehousing or warehousing petrol and oil.
2. Connectors on technological pipelines must be assured for
tightness, mechanical and chemical durability.
3. Technological pipelines in stores must be laid underground
directly in land or in drains with lid, sand must be fastened surrounding pipe.
The thickness of fastening layer must not less than 15 cm. It is permit to lay
overhead technical pipelines at positions not be impacted by persons and means
of transport.
Technological
pipelines in areas for cars’ running must be laid in underground cages or in
drains with lid and fastened with sand. Two heads of cage pipe must be
sealed. The depth of burying pipe must ensure to not impact to durability of
all pipeline system.
4. Technological pipelines which are parallel with each other
must be laid to have a distance between them of not less than once of pipe
diameter. For pipe with connector by flange laid parallel, distance
between pipes is not less than diameter of flange added 3 cm.
5. For tanks buried underground, technological pipelines must
slope toward tanks, the degree of slope is not less than 1%.
6. Distance from the lowest point of pipeline for
transporting petrol and oil in tank to pump must be not less than 15 cm from
bottom of tanks.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
7. Transporting of petrol and oil into tanks must use method of
closely transporting. Pipelines for transporting petrol and oil in each tank
must be put down bottom of tank and not less than 20 cm from bottom of tank.
8. All tanks containing petrol and oil must be installed
breather valve. It is permitted to install in a same breather valve for tanks
containing a same fuel group.
9. Breather valve must meet the following technical
requirements:
a) Technical
parameters are suitable with structure, capacity and conditions for operation
of tanks. Mouth of breather valve must be directed horizontally or up to above.
b) Inside diameter of
pipes connected from tanks to breather valve is not less than 50mm.
c) Breather valve must
be less than 3m from ground.
d) In case where pipes
connecting with breather valve are installed along to wall surrounding filling
stations: It is permitted to adjust pipes connecting with breather valve at
angle of 450 of the vertical, ensure that distance form breather
valve to inside edge of wall toward filling station is not less than 2m. This
distance is reduced to 0.5m if stores are installed the vapor recovery system.
dd) If pipes
connecting with breather valve are installed along to wall, pillars of
construction items, the mouth of breather valve must be higher than roof 1 m or
more and be far not less than 3.5m from gates of all kinds.
e) Breather valve of
filling station must have separate system
anti lightning strike vertically or must be laid in protection zone of general
system preventing the vertical lightning of filling station.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
1. Requirements on safety in design, installment and use of
electric equipment for filling station must be suitable with TCVN 5334:2007
Electrical apparatus for petroleum and petroleum products terminal -
Requirements on safety in design, installation and operation.
2. In case of using generator in area of filling station,
generator must be placed outside of hazardous zones regarding fire and
explosion. Chimneys of generator must have the fire extinction part and heat
insulation coating.
3. Conductors and electric cables installed in filling
stations must satisfy the following requirements:
a) The used conductors
and electric cables are kind with bronze core, insulated, and made of synthetic
resin.
b) The used
underground electric cables must be kind of cable with bronze core, insulated,
made of synthetic resin resisting petrol and protected by steel sheath.
c) In case of electric
cables not be protected by steel sheath, when being laid underground, they must
be threaded in steel pipe (under roads for running of cars and motorbikes) or
threaded in plastic pipes (places without running of cars, motorbikes) or paid
in separate trenches covered by sand and with lid.
To prohibit lay
electric cables by sharing a trench laying pipes for transporting petrol and
oil.
d) All electric cables
muss be laid underground when: passing roads for cars, construction items and
crossing with pipelines for transporting petrol and oil, cables must be
threaded in protective steel pipes, pipe head for threading cables must be
pulled out edge of facilities, length of part pulled out toward each sides is
0.5 m.
dd) In a cage pipe for
threading cable, electrodynamic cables and cables for lighting are not shared a
pipe with cables for control, cable for information and cable for signals.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
4. Cable lines used for automatic equipment, information and
signals must comply with Clause 3 of this Article.
5. Equipment installed at hazardous zones regarding fire and
explosion of Z0 and Z1 levels must be kinds of explosion
prevention.
6. It is required to have system anti lightning strike
vertically for construction items in stores.
System of grounding
anti vertical lightning strike must have value of grounded electrical
resistance not in excess of 10 Ω. The height of lightning hand must
ensure for breather valve to be plain safely in protective area of lightning
hand. In case where breather valve is laid higher, not in protective area anti
lightning of high facilities around, it is required to prevent vertical lightning
strike for breather valve by lightning rod with equipotential bonding.
Head of lightning hand must be not less than 5m from breather valve.
7. For preventing induction lightning and electrostatic,
tanks must be made of steel and projection-weld for at least each tank welded
two metal lines with system of grounding anti induction lightning and
electrostatic. Grounded electrical resistance of this system is not in excess
of 10 Ω.
8. At positions for transporting petrol and oil into station,
it is required to have equipment of grounding anti electrostatic used for means
of transport to connect with ground when transport petrol and oil into
tanks.
9. A safe system of grounding must have value of grounded
electrical resistance not in excess of 4 Ω. All metal parts not carrying
electric of electric equipment and pumps must be grounded safely.
a) This system of
grounding must be 5m from system of grounding anti vertical lightning strike
(distance in ground).
b) When connecting
safe system of grounding with system of grounding anti vertical lightning
strike, it is required the value of grounded electrical resistance to be not in
excess of 1 Ω.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Article
12 Equipment for fire prevention and fighting
1. At filling stations must post up the internal rule on fire
prevention and fighting at apparent positions, have signboards of fire
prohibition and the fire command.
2. Filling stations must be equipped full quantity of initial
means for fire fighting suitable for fire fighting as prescribed in TCVN
3890:2009 Fire protection equipments for construction and building –
Providing, installation, inspection, maintenance and in accordance with this
regulation.
3. Based on fire danger of substances, materials in each
works items of filling stations, means for fire fighting are arranged
suitably.
4. The initial means for fire fighting must be equipped and
arranged at the following positions of stations:
a) Petrol pumps.
b) Area for
transporting petrol and oil into tanks
c) Stall for sale of
lubricants and other products.
d) Place for vehicle
washing, vehicle maintenance.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
e) Generator,
substation.
5. At stall for sale of liquefied petroleum gas in filling
station must be equipped devices, instruments for fire fighting as prescribed in
TCVN 6223:2011 Liquefied petroleum gas (LPG) store RequirementsSafety.
6. Quantity of means, instrument for initial fire fighting is
prescribed in table 5.
Table 5 – Quantity of means, tools for initial fire
fighting
Name of works items in store
Powder fire extinguisher
(extinguisher)
Fiber blanket
(blanket)
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
≥ 4 kg
1. Cluster of tanks
in stations at levels 1,2
2
2
4
2. Cluster of tanks
in stations at level 3
1
2
2
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
-
2
1
4. Place for vehicle
washing, vehicle maintenance.
-
1 (1)
-
5. Stall for sale of
lubricants and other products
-
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
1
6. Office for goods
sale
-
1 (1)
-
7. Office for
safeguarding
-
1 (1)
-
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
1
2
-
a) Depend on specific
condition of filling station, the powder fire extinguishers may be replaced foam
fire extinguishers or CO2 fire extinguishers with an equivalent feature of fire
fighting.
b) Quantity of fire
extinguishers in parentheses () is quantity of backup fire extinguishers Backup
fire extinguishers are arranged as a separate cluster inside of filling
station.
c) At filling stations
it is required to arrange means for containing water to wet fiber blanket upon
using for fire fighting.
7. Arranging of means and instruments for fire fighting must
ensure:
a) To be apparent.
b) To be easy to get.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
d) To prevent from
rain, sunshine and destroy of environment.
8. Only be permitted arranging means and instruments for fire
fighting with assured quality.
9. Fire extinguishers are hung on wall, pillars or put on
floors. In case where fire extinguishers are hung on wall, pillars, distance
from floors to clamp of fire extinguishers is not more than1.25 m.
In cases of putting on
floors, fire extinguishers must be laid at dry places and can have racks and
height of racks is not more than 2/3 height of fire extinguishers. In case
where fire extinguishers are laid near doors, they must be hung or put at 1m
distance from edge of door.
10. In scope of filling stations, means and instruments for
fire fighting are permitted to be scattered according to each position, or if
it is possible, according to each cluster, depend on danger of fire and
explosion and area of premises need be protected, in case of arranging
according to each cluster, it is required to arrange at least 2 clusters.
Article
13. System of water supply, drainage and environmental hygiene
1. Water for life activities, fire fighting at filling
stations are taken from public water sources, underground water or surface
water.
2. Pipelines to supply water for life activities may be
combined with pipelines to supply water for fire fighting.
3. Sewage contaminated oil of filling stations must be
collected according to system of separate drains with lids made of reinforced
concrete slabs with vents or steel spoke concrete slabs to prevent accumulation
of petrol vapor.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
4. Sewage contaminated of filling stations must be handled to
satisfy provisions at QCVN 29:2010/BTNMT National Technical Regulation
on the Effluent of Petroleum Terminal and Stations before discharged to the
outside environment.
Article
14. Vapor recovery system
1. Diagrams and principles
of a typical vapor recovery system are described in Annex II promulgated
together with this Regulation.
2. The vapor recovery system must ensure that all petroleum
vapor generated during transport of goods must be rotated back cistern of cars.
3. Equipment used in the vapor recovery system must be made
of petrol-resistant and non-combustible materials.
4. General requirements for the vapor recovery system:
a) System of breather
valves for tanks must satisfy provisions in Clause 9 Article 10.
b) Adaptor and
lid of waiting for vapor recovery of filling stations must be installed
dependently corresponding to the system of breather valves of tanks.
c) Fast connectors
must ensure requirements of quality and tightness: Rubber washer must be kind
of oil resistance, male and female headers of fast couplings at filling
stations and on cistern cars must be synchronous.
...
...
...
Bạn phải
đăng nhập hoặc
đăng ký Thành Viên
TVPL Pro để sử dụng được đầy đủ các tiện ích gia tăng liên quan đến nội dung TCVN.
Mọi chi tiết xin liên hệ:
ĐT: (028) 3930 3279 DĐ: 0906 22 99 66
Chapter
III
ORGANIZATION
OF IMPLEMENTATION
Article
15. Organization of implementation
1. Department of Science and Technology under the Ministry of
Industry and Trade shall assume the prime responsibility for, and coordinate
with concerned agencies and units in guiding and examining implementation of
this regulation. Based on management requirement, Department of Science and
Technology under the Ministry of Industry and Trade shall propose to Minister
of Industry and Trade for amending, supplementing this regulation to be
suitable with reality.
2. The Departments of Industry and Trade in provinces and
central-affiliated cities shall guide, inspect implementation of this
Regulation in their localities and report implementation, difficulties,
problems to the Ministry of Industry and Trade before January 31 of next year
or ad hoc basis.
3. In case where legal documents, documents, standards
referenced in this regulation have amendments, supplementations, are replaced,
provisions in new documents shall be applied.