in Vietnam, what are regulations on adjustment and revision of design of relic repair drawings?

What are regulations on adjustment and revision of design of relic repair drawings in Vietnam? What are regulations on preparation for relic repair in Vietnam? I would like to know above information related to contents of appraising design of relic repair drawing.

Regulations on adjustment and revision of design of relic repair drawings in Vietnam:

Pursuant to Article 14 of the Circular 15/2019/TT-BVHTTDL stipulating adjustment and revision of design of relic repair drawings in Vietnam as follows:

1. Design of relic repair drawings may be adjusted and revised upon new discoveries relating to the relics during repair process. Adjustment and revision of design of relic repair drawings must conform to objectives and tasks of approved relic repair projects.

2. Documents on adjustment and revision of design of relic repair drawings include:

a) Explanation of adjustment and revision contents;

b) Color-printed photos with 10 x 15 cm in dimensions or larger;

c) Copies of approved drawings specifying solutions to repair relics related to the adjustment and revision contents;

d) Drawings depicting current conditions and drawings dictating solutions to adjust and revise design of relic repair drawings;

dd) Records of relic assessment board specified in Point a Clause 1 Article 16 of this Circular;

e) Estimates for adjustment and revision.

Documents specified in Points a, b and d of this Clause must clearly specify new discoveries regarding the relics.

3. Appraisal of adjustment and revision of design of relic repair drawings shall be carried out within 7 days as specified in Clause 1 Article 13 of this Circular.

4. Adjustment, revision of design of exhibit preservation drawings and appraisal thereof shall be carried out as specified in Clauses 1, 2 and 3 of this Article.

Regulations on preparation for relic repair in Vietnam:

Pursuant to Article 16 of the Circular 15/2019/TT-BVHTTDL stipulating preparation for relic repair in Vietnam as follows:

Developers of relic repair projects shall take charge and cooperate with organizations carrying out relic repair in:

1. Reaching a consensus with People’s Committees of districts, Offices of Culture – Information, People’s Committees of communes where the relics reside about measures to protect the relics and plans for execution of relic repair projects and design of relic repair drawings.

2. Raising awareness of the locals where the relics reside and teams of craftsmen and workers participating in the repair of value, objectives, tasks, scope and contents of relic repair projects, and design of relic repair drawings.

3. Receiving transfer of the premise for execution of relic repair projects and design of relic repair drawings.

4. Organize construction sites satisfactory to security and safety requirements; constructing sheltering structures and storage for structural components (in case of total dismantlement of structural components of the relics); adopting measures to protect exhibits.

5. Identifying backup principles, procedures and technical solutions to repair structural components in case of compulsory deconstruction of the relics.

6. Preparing materials, personnel, vehicles and equipment serving construction and related affairs.

Best regards!

Lê Tấn Phát